The construction process of tiling is as follows

Grass-roots treatment: dust, debris thoroughly cleaned, not empty drums, cracking and sanding and other defects.

Bouncing line: before construction in the wall around the pop-up elevation control line, in the ground pop-up crosshairs, in order to control the size of the floor tile separation.

Pre-paving: first of all, on the basis of the design requirements of the drawings, the color of the floor tiles, texture, surface flatness and other strict selection, and then in accordance with the requirements of the drawings of the pre-paving. For pre-paving may appear in the size, color, texture error adjustment, exchange, until the best results, according to the paving smooth stacking neat standby.

Paving: paving selection of 1:3 dry cement mortar, mortar thickness of about 25mm. Paving before the back of the floor tile wet, need to be dry on the front is appropriate. Put the floor tile in accordance with the requirements of the cement mortar, with a rubber mallet tap the floor tile finish until dense and flat to meet the requirements.

Hooking: 24h after the floor tile paving for cleaning hooking, hooking should be wiped clean before the floor tile gap impurities, with a special caulking hooking.

Clean up: in the home furnishing tiling construction process with the dry with the clear, after the completion (generally appropriate after 24h) and then with cotton gauze and other things on the surface of the tiles.

The floor tile paving notes:

Tiles should be soaked in water for half a day before use, to the brick body does not bubble prevail.

Kitchen, bathroom should have running water slope, no water, water does not flow backwards. Construction damage to the original waterproof layer, must do waterproofing, waterlogged 12-hour test without leakage.

Floor tile laying is completed, to use cardboard and other cover the brick surface, and at least 24 hours before walking on the brick surface.

After tiling.

Tips:

Paving one hour later, should be timely to stay in the brick surface of the cement, caulk or other sticky objects wiped clean, because like caulk attached to four hours is more difficult to clean.

Paving 12 hours later, should be knocked on the brick surface to check, if found empty drum sound should be re-laid. Brick paving is completed 24 hours before walking, thoroughly scrubbed, with water mixed with detergent, thoroughly clean the tiles.