Traditional Culture Encyclopedia - Traditional culture - How to embed and repair bolt ball grid structure in block installation
How to embed and repair bolt ball grid structure in block installation
2. Dismantling structural parts: Dismantle structural parts that need to be repaired to remove oil stains and impurities on the surface.
3. Measuring dimensions: accurately measure the embedded parts with measuring tools to determine the specifications and dimensions of the embedded parts to be added.
4. Installation of embedded parts: Install the embedded parts in the corresponding positions with a screwdriver and a wrench, and tighten the bolts with a wrench.
5. Knocking the embedded parts: gently knock the embedded parts with a rubber hammer to ensure that they are flush with the original structural parts and firmly connected.
6. Inspection and adjustment: After reinstalling the structural parts, check whether they are level with a level instrument and other tools, and adjust them if they are uneven.
- Previous article:Is Valentine's Day in China a traditional festival in China?
- Next article:What is the system of responsibility for forest fire prevention
- Related articles
- There is a folk saying, "Pickled vegetables in light snow, bacon in heavy snow". Why do we have to make bacon when the solar term of heavy snow arrives?
- What are the specialties in Xuzhou?
- A day suitable for blessing?
- What are the names of the twelve gods of flowers?
- The Influence of Etiquette on Personal Life and Career Development
- Mamamoo age ranking
- What are the top ten brands of steel wooden doors in China?
- February 22nd Taicang Tourism, Culture and Food Festival Opening Event Schedule
- Manufacturing method of Korean rice wine
- What is the name of the belt tied to your hand when practicing martial arts?