Traditional Culture Encyclopedia - Traditional culture - The overall strategy of the decoration process: the ordering and installation sequence of the main materials for decoration.

The overall strategy of the decoration process: the ordering and installation sequence of the main materials for decoration.

The overall strategy of the decoration process: the ordering and installation sequence of the main materials for decoration.

The most common problem in the installation of main materials is that the chaotic schedule leads to the extension of the construction period of home improvement, which is time-consuming and day-consuming. This is caused by not knowing the installation sequence and stocking time of various main materials. So what is the order of ordering and installing the main materials for decoration? What are the precautions for main material installation? Below we will answer them one by one.

The main material installation is divided into: ceiling, cabinet, floor, finished door, sanitary ware, shower room, wallpaper and so on.

Reasonable arrangement of ordering time for main materials;

1, order cabinets (which can be set in advance or ordered three to five days before the construction party enters the site)

Because the water and electricity diagram of the cabinet is made by the manufacturer, it takes about three days for the manufacturer's designer to send the water and electricity diagram to the owner. In this way, the relay will not be delayed.

2. Sanitary ware (can be ordered in advance or three to five days before the contractor enters the site)

Because most plumbers need to clean up the site when they enter the site, they should change the drainage first, and then backfill the slag. At this time, the size of sanitary ware should be positioned.

3. Door sets (can be ordered in advance or three to five days before the contractor enters the site)

This is a long or short main material distribution, short manufacturers, may be able to deliver goods in half a month, and the long ones have almost passed more than half of the decoration period. But also a fatal link to delay that work deadline.

4. Wall tiles and floor tiles (can be ordered in advance or three to five days before the contractor enters the site)

Generally, the bricklayer will be stationed around 10 days after the start of construction. At this time, you need walls and tiles to enter the site.

5. Stone (order once every three to five days after the bricklayer enters the site)

6. Hardware (this is ordered according to the quantity provided by carpenters, and the general construction party will inform the owner three to five days in advance)

7. Wallpaper (can be ordered in advance or three to five days before the top coat construction)

8, gusset plate (can be set in order at the beginning or middle of the project)

Because the gusset plate is mostly installed by merchants, and it is a follow-up project after wall brick laying and cabinet installation.

9. Lamps and lanterns (can be ordered in advance or in the middle of the project, but this has something to do with carpentry)

10, floor (the floor is basically the last link, and the floor will be installed only if the foundation installation is poor, and the order is similar before the middle of the project).

There are many accessories in the later period, such as curtain decoration, which can basically match the design style slowly. The above is only a rough schedule of main materials, and sometimes it will change due to human reasons. Some owners may have completed the relevant main materials before determining the loading time, and some owners may decide while decorating. In any case, it is very important to determine the delivery time by using the priority of the main materials.

Installation sequence of main materials:

Step one:

L, need to cast-in-place floor slab, partition, can be completed before and after the professional civil engineering transformation.

2. Before entering the site, set up the cabinet. Kitchen water and electricity layout provided by cabinet merchants when they enter the market.

3 If central air conditioning is installed, the water and electricity shall be completed first, and then the central air conditioning construction shall be carried out;

Step 2: Before hydropower enters the site, the following items need to be obtained:

1, main water valve, preferably with the same brand as water pipe;

2. If the squatting pan is useful, it is necessary to take the squatting pan to the scene, and the master will transform it into water according to the physical object; If the toilet is useful, you should know the pit distance of the toilet, and the master will convert it into water according to the pit distance.

What needs to be determined is:

1, the sink adopts ground drainage or wall drainage (ground drainage is adopted by default);

2, bathroom/bathtub/shower room and other sanitary ware is necessary to leave power, telephone lines, etc. ;

3. If you use an electric water heater, you need to put a separate set of wires. According to the different power, 2.5-6 square meters of wires are different. Please consult the merchant for details.

4. Is there a separate ventilation pipe in the kitchen (default drainage)?

5. Number of groups of main lights, dining room lights and stairwell (duplex apartment) lights (two groups of living room, one group of dining room and one group of stairwell are adopted by default);

6. Other projects with special requirements in hydropower layout.

Step 3: Tiles, floor drains, mosaics, cultural stones, etc. Will be pulled to the site within 2-3 days after the bricklayer enters the site (the specific time depends on the size of the apartment). Before bricklayers stick bricks, jointing agents should be bought on site.

L, demolition of the wall to complete the measurable stone, the threshold stone should be taken to the site to be installed by masons before the ground is leveled, and the rest of the stone should be installed by merchants. If there are stones and tiles that need to be matched during construction, such as sidebands, steps, mosaics, etc., generally, the stones are installed first, and the bricklayer sticks the tiles before closing.

2, bricklayer stage, air conditioning holes, ventilation holes.

3. After the kitchen and bathroom wall tiles are laid, the aluminum gusset merchants and the whole cabinet merchants can measure the size and order the cabinets for production.

4. After the ground leveling is completed, you can measure the size of the door. After measuring the door, leave the size to the decorator, and the decoration union will modify the door opening according to the size. After the door is measured, you can do it. The suit door should be installed after the second putty scraping. It takes a long time to make the door, which takes about 30-45 days, so it is necessary to measure the size in time and place an order in time. When installing the suit door, install the door suction, hinge, lock and slide rail (for sliding door) together.

5. If there are cabinets made by carpenters on site, hardware such as sliding rails and hinges should be brought to the site before the production is completed.

6. After the cabinet is completed, if the cabinet door is set outside, you can inform the merchant to measure it.

7. If the diagonal line is installed, the painter can paste the kraft paper/cloth before installing it.

8. The painter can choose the color of the topcoat with the decorator in the specialty store when scraping putty to get the topcoat. (If there is wallpaper, you need to take the basement membrane to the site before painting the primer, and the decorator will brush the basement membrane. The basement membrane can also be brushed by merchants. If wallpaper is used in a large area, it is recommended that the base film be covered by the merchant. )

Step 4: Equipment installation stage: The items that the decorator needs to bring to the site for installation are:

1, switch socket panel, pendant, general lamps, general clothes drying rod, air switch, faucet, shower head, high-pressure pipe, handle, water tank, etc.

2. The items that need to be installed by the merchants on site are:

High-grade lamps, automatic/manual clothes drying rods, bathroom cabinets, bathtubs, shower rooms, toilets, stairs, railings, customized doors, cabinets, aluminum gusset plates, glass.

Precautions:

1, the aluminum gusset plate can be installed at any time after the wall tile is completed, but before installation, the flue of the range hood and the Yuba should be taken to the site and embedded together when installing the aluminum gusset plate. Integrated Yuba and lamps are installed by merchants. Ordinary Yuba and lamps are decorated by the decoration party, so just leave a good position when installing the gusset plate.

2. After the equipment installation, install the floor and wooden baseboard, and after the floor installation, install customized furniture. Do land reclamation and cleaning. After cleaning, install curtains, move furniture, install the remaining electrical appliances, and decorate soft clothes. The painter touched up the paint.

Finally, it was empty for a while. Do a good job of ventilation and lighting (such as volatilization of toxic and harmful substances) and finally move in.

Precautions for main material installation:

Main material installation-suspended ceiling

1, gypsum board

(1) construction method

Gypsum board is the most basic intermediate material in ceiling engineering, which can only be used after surface decoration. So gypsum board can be used like a wooden board. The structure of various decorative items can be made by sawing and planing nails, and then decorated with latex paint wallpaper ceramics (waterproof gypsum board) to complete the decoration project.

(2) Analysis of common problems

Phenomenon 1: About half a year after the gypsum board ceiling was completed, cracks began to appear at the joints. With the passage of time, some cracks can reach 1-2mm. The main reasons are as follows:

Gypsum board joint structure is reasonable;

The plate is deformed by expansion and contraction, and the stiffness is poor;

The quality of caulking putty is poor;

Preventive measures:

Choose gypsum board with good quality and its matching caulking putty, keel and fastening screws, and the spacing should be strictly in accordance with the design requirements to reduce the deformation of the board and increase the strength; During construction, it is forbidden to close the joint and remove the sundries in the joint; Board joints must be filled with good quality putty, and a thinner putty with a thickness of 1mm should be scraped when the putty is initially set (3040min).

Phenomenon 2: the cause analysis of regular wavy ceiling;

Arch freely to form a uniform camber;

Grille or square plate around the ceiling;

The high moisture content of wood leads to shrinkage and deformation;

The keel joint is straight and not easy to bend, resulting in a straight ceiling;

Derrick or derrick spacing is too large, resulting in regular deflection of keel after deformation;

The wooden boom head splits, and the keel falls off after being stressed;

When the steel bar is used as a suspender, it is not tightened, and the keel falls after being stressed;

The suspender is hung on the bracket of other pipelines or equipment, and the ceiling is flat due to vibration or bracket falling off;

The stressed joints are closely combined, and displacement and deformation occur after stress.

Preventive measures:

Ceiling wood should be of high quality, such as pine and Chinese fir, and its moisture content should be controlled within 12%. The keel should be straight, and the ceiling with knotted cross section should be leveled around the wall according to the design elevation. When nailing, the horizontal line around shall prevail. The springing height of the indirect horizontal line is 1/200 of the short span of the room, and the longitudinal springing should be hung evenly. The stressed joints should be nailed firmly.

A, the construction points can only be installed after the HVAC system is installed and debugged; Gypsum cement and other wet projects can only be installed after drying; Mineral wool ceiling can be paved with glass wool, rock wool and other heat insulation and sound insulation materials; After the construction, the surface of the mineral wool ceiling can be repainted, otherwise it will affect the sound absorption and fire prevention performance of the ceiling.

B. Analysis of common problems Precautions to prevent chromatic aberration from bending or falling off: accurately calculate the dosage, and use the mineral wool ceiling with the same brand and batch number in the same place; Use the keel and accessories matched with mineral wool; The keel should be hung firmly, and the levelness should be adjusted to avoid bending.

2. Plastic PVC gusset plate

(1) The key points of construction are to pop up the elevation line on the wall, fix the pressing line at both ends of the wall, fix the wall firmly with cement nails, make plates according to the actual size, insert the plates into the pressing line, fix them on the keel with self-tapping nails after the slats are installed correctly, and then insert the second plate. The last dish should be cut according to the actual size. When cutting, use a sharp knife and press with a steel ruler.

(2) Analysis of common problems: the surface is flat, the joints are tight and straight, and the frame angles are tight and straight. Cause analysis: the water content of keel is large, which leads to shrinkage and deformation; Bone joints are flat; The layering is fixed firmly, and the corners are cut into standards; There are too few fixed points on each board, and the preventive measures for deformation after stress: high-quality wood should be selected, and its moisture content should be controlled within 12%; Keels should be straight, twisted and have cross-sectional knots; The corners should be cut with a sharp knife; The floor should be nailed down to prevent deformation after stress.

The maintenance of PVC ceiling profiles has strong water resistance and scrub resistance. In daily use, the profile can be scrubbed with detergent and then washed with clean water. The joints between plates are easily polluted by oil. When cleaning, you can dip a brush in detergent and then rinse it with clean water. Note that the lighting circuit should be wetted with water. If the PVC ceiling profile is damaged, it is very convenient to update it. Just take the battens at both ends, pull out the boards one by one, replace the damaged boards with new ones, then reinstall them and press the battens.

3, metal products ceiling

(1) Hoist the main keel and adjust the level during construction; Install with appropriate force in the direction indicated by the board surface; In the installation process, avoid the collision of other things in the slats; After installation, tear off the surface protective film in time.

(2) Analysis of common problems, such as color difference, surface smoothness, seam warping, seam straightness, etc. Preventive measures: accurately calculate the dosage, and use the same brand and batch number of metal products ceiling in the same place; Use standard original fittings and supporting keel; The levelness of keel should be adjusted; Pay attention to the direction when installing the pinch plate.

Main material installation-cabinets

1. The circuit diagram before and after the hydropower transformation is not reserved. Punching holes above the pipeline during construction leads to water leakage or short circuit of wires.

Solution: Keep the circuit diagram before and after hydropower transformation.

2, ceramic tile empty drum, corner crack.

Solution: Workers can punch holes in tiles with a glass drill, and then punch holes with an electric hammer.

3. The phone number left by the customer for the factory can't get through, which delays the time.

Solution: Leave 1 contact information.

4. The oven or disinfection cabinet is under the ground cabinet, and the socket is installed at the back, which makes it difficult to plug in and out.

Solution: You can install the switch directly above the socket or elsewhere.

Turn off the main power when traveling, the food in the refrigerator will go bad. Don't worry about other appliances without turning off the main power supply.

Solution: Power on the refrigerator separately.

6. The power position between the ground cabinet and the hanging cabinet is too low, and the small appliances on the table will block the plug.

Solution: The power supply position is higher than the ground.

Main material installation-floor

Floor installation mode

1, the variety, specification, grade and quality of wood materials and the moisture content during laying shall conform to the construction and acceptance specifications of wood structure engineering.

Code (GBJ206-83).

2, all kinds of wood surface and nail shop at the grass-roots level must be firm without looseness (or paste firmly), and the glue used for pasting must meet the design requirements.

Inspection method: Observe, stamp or knock with a small hammer, and check the variety and certificate of adhesive.

Note: the empty drum area is not more than 1/8 of the veneer surface, and each room does not exceed 5% of the total number of spot checks, which can be ignored.

Matters needing attention in floor installation

1, the surface quality of wood surface layer shall meet the following requirements:

Qualified: the surface of wood is smooth, without gouge, scum and burr, with clear pattern and uniform color of oil film surface.

Excellent: the surface of wood is smooth, without gouges, scum and burrs, with clear and beautiful patterns and consistent oil film surface color.

Inspection methods: observation, touch and foot inspection.

2. The joint quality of wood surface layer shall meet the following requirements:

(1) Panel:

A, qualified: the gap is tight, the joint position is staggered, and the surface is clean.

B, excellent: the gap is tight, the joint position is staggered, the surface is clean, and the flat-fell seam is straight and square.

(2) Parquet floor surface:

A, qualified: the joint is tight, the nail clip is firm, the surface is clean, and there is no obvious glue overflow during bonding.

B, excellent: the joint is tight, the nail glue is firm, the surface is clean, there is no glue overflow, the plate arrangement is reasonable and beautiful, and the width of the surrounding edges is consistent. Inspection method: observation and inspection.

3, wood floor waxing quality must meet the following requirements:

Qualified: the joint is tight, the surface is smooth, and the height and wall thickness are consistent.

Excellent: tight joints, smooth surface, consistent height and wall thickness, reasonable and beautiful joint layout, straight top and accurate cutting angle.

Inspection method: observation and inspection.

4, wood floor waxing quality must meet the following requirements:

Qualified: the wooden floor is evenly covered with hard wax, soft wax and wax, with the same color and clean surface.

Excellent: hard wax, soft wax and wax on the wooden floor are evenly paved, smooth and bright, with uniform color, uniform thickness, clear wood grain and clean surface.

Inspection method: observation and touch inspection.

Main material installation-door

Installation standard

1. Door leaf: horizontal, vertical, freely openable, with uniform gap size, with the gap at the hinge side not greater than 2mm and the gap in the unlocking direction not greater than 3mm.

2. Sleeve plate: horizontal and vertical. Press the sleeve plate tightly with a ruler, and there shall be no gap. The vertical positive and negative tolerance is not more than 2mm, and the sleeve plate is 3mm away from the ground.

3. Top thread: the redundant part on the top should be consistent, and the glass glue inside should not have cracks.

4. Hardware: the height of the lock should be 95cm from bottom to top, the lock panel should be horizontal and vertical, the part of the lock body buckled above the back door should not have a white edge (including the hinge socket), and the hinge trademark should not be reversed in the positive direction.

5. Glue coating: China white glue is uniform, and there can be no obvious disconnection. The transparent glue on the ground is in place.

Installation method:

1. Fix the top guide rail so that the front of the guide rail is in the same plane as the cabinet surface, and the upper and lower guide rails are horizontal in the reserved position.

2. Put two doors into the track, measure the verticality of the doors with a level or ruler, adjust the position of the upper and lower tracks and fix them.

3. Check whether the door body is parallel to both sides. Adjust the door body by adjusting the bottom wheel to keep the door frame level with both sides.

4. Fix the anti-jump device and show the quality protection certificate. According to this installation program, users can check whether the selected wardrobe door brand is professional.

Installation requirements:

1. According to the measuring table, the horizontal and vertical errors of the height, width and thickness of the hole after construction shall not exceed 1cm.

2. The hole stacking should be completed before the wooden door installation.

3. Floor tiles, wooden floors and lintels have been installed.

Main material installation-sanitary ware

Sanitary ware installation and piping requirements:

1 Pipe installation shall be laid horizontally and vertically firmly without looseness, and the slope shall meet the specified requirements. Buried pipes buried in the wall and the ground should be treated with anti-corrosion and protected with cement mortar.

2, cold and hot water installation should be left hot and right cold, installation of cold and hot water pipes parallel spacing is not less than 20mm, such as cold and hot water system using water separator should use semi-flexible pipe connection.

3, faucet, valve installation straight, correct position for easy use and maintenance.

4, all kinds of sanitary ware stone surface, wall, ground and other contact parts should be sealed with silicon copper glue or waterproof sealing strip, and all kinds of ceramic utensils should not be embedded with cement mortar.

5. The drain pipe of bathtub should be sealed on the falling nozzle, and plastic hose should not be used for connection.

6, water supply pipes and accessories, appliances connected closely, no water leakage.

7, drainage pipes should be smooth, no slope, no jam, no leakage. The floor drain grate should be slightly lower than the ground and run smoothly.

8, sanitary ware installation position is correct, firm and correct, along the level, smooth surface without damage.

Main material installation-shower room

Installation mode of shower room:

1, ready to use the necessary tools.

2. Install the bottom basin: assemble all parts of the bottom basin, adjust the level of the bottom basin, and ensure that there is no water in the basin and the bottom of the basin. The hose can expand and contract with the distance to firmly connect the basin bottom with the floor drain.

3. Testing and protection: After installation, water testing is required to ensure smooth launch. 4. Positioning drilling: use pencil and level to determine the position of drilling aluminum against the wall, and use impact drill to drill holes.

4. Installation of aluminum: Knock rubber particles into the drill hole and lock the aluminum bar on the wall with screws.

5. Fixing the glass: clamp the glass in the hole of the bottom basin and lock it, and then fix it with screws.

6. Installation of pipe jacking: find the corresponding position above the fixed glass, install (straight/oblique) fixed seats and connect the pipe jacking. Fix it on the top of the glass with an elbow sleeve.

7. Installation of the shelf: Install the shelf in an accurate position, tighten the laminated nut, and fix the laminated glass to keep it vertical and horizontal. Pay attention to waterproof under the aluminum material that fixes the glass.

8. Installation of movable door: Install hardware of movable door, and install hinge at the reserved hole of fixed door. After installation, adjust the position of the lotus leaf shaft core until the door feels best.

9. Waterproof: Install water-absorbing strips or water-blocking strips on the side or under the glass as required. Seal the joints between aluminum and walls, glass and bottom basin with silicone gel.

10, debugging and fastening: check whether all components are comfortable and smooth to use, and adjust them in time when problems are found. After adjustment, tighten the corresponding screws to make the whole shower room more firm.

1 1. finishing work: clip the decorative aluminum strip into the wall-hung aluminum to ensure its neat and elegant appearance. Finally, the whole shower room needs to be wiped clean with a rag.

Installation of shower room should pay attention to the following points:

1, the size of shower room and the location of embedded holes should be designed before the bathroom decoration.

2. The best customized shower room with water supply system and tiles installed.

3. Wiring leakage protection switch device should be considered before installation in shower room to avoid rework.

The style of shower room depends on the layout of bathroom. Common types are corner type and straight line type.

5. When the shower room is installed, it should be installed in strict accordance with the assembly process.

6, shower room must be firmly connected with the building structure, can't shake.

7, open shower room must use expansion bolts, and fixed with the hollow wall, drainage, basin bottom water storage is not more than 500 grams.

8. The appearance of the shower room after installation should be neat and bright, and the sliding door and sliding door should be parallel or vertical to each other and symmetrical to each other. The sliding door should be opened and closed smoothly and seamlessly, and the shower room and the bottom basin should be sealed with silica gel.

Acceptance criteria for installation of shower room:

1. Check size: Check whether there is any error between the measured size and the actual product size.

2. Inspection level: the error should be controlled within 2mm/1000 mm..

3. Check the verticality: the horizontal error of the upper and lower vertices on both sides of the shower room should be controlled within 10 mm. ..

4. Check the silica gel: the silica gel should be thin, uniform and beautiful.

5. Check the suction: the gap of the magnetic door suction rod should be symmetrical, the opening and closing force should be flexible, and the opening and closing force should be between 15-40 Newton.

6. Check the hinge: the hinge should open and close smoothly without noise.

Main material installation-wallpaper

Preparation of tools and accessories:

1. Tools: center of gravity hammer, measuring ruler, pencil (colored chalk), roller, plastic bucket, clear water bucket, sewing wheel, cardboard cutting, brush, scraper, art knife, sponge (towel), small brush, ladder, workbench (at least 53cm wide, 1.5M long).

2. Accessories: wallpaper powder and white glue

The process of wallpaper construction:

Wallpaper construction can be divided into three steps: cutting paper → gluing → pasting wallpaper.

Detailed description of wallpaper construction process:

(1) Pre-preparation:

Check carefully whether the color number and batch number of wallpaper are consistent. Also know the type of wallpaper to be constructed, color paper should be aligned, and plain paper should be constructed in positive and negative directions.

(2) wallpaper cutting:

Step 1: How to cut wallpaper to save money?

First determine the height of the house and a wallpaper. 10M can cut several wallpapers.

Secondly, the general wallpaper pattern may be a unit of 53m at most, but if there are two units of 53cm. Then the length and height of a unit is 26.5cm. If 53cm has three units, then one unit is 17.7cm, and so on. Therefore, it is generally necessary to determine how many wallpaper can be cut according to the loss of flowers and the height of the house.

Step 2: Cut the wallpaper according to the height calculated in the previous step.

Note: the length of the decal must be 5 cm longer than the top and bottom of the wall for trimming.

Second: Cut one and paint a pencil on the back of the wallpaper. Indicate the serial number and direction

Note: serial numbers should be used uniformly, numbers and handwriting should be clear and not vague. The direction should be uniformly marked with the upward direction.

Thirdly, when cutting the second wallpaper, the flower wallpaper should be aligned with the previous one, and then cut it. Finally, check the color difference every three sheets, and cut all the wallpapers at once.

Note: After all the wallpaper is cut, it should be folded according to the serial number. Spare parts should not be discarded at will, but should be put aside neatly.

17 summary of main decoration materials:

1, floor

Generally speaking, it refers to the floor decoration material with wood as raw material. At present, the most popular products on the market are solid wood flooring, solid wood composite flooring and laminate flooring. Among them, solid wood composite floor and laminated floor can be used for geothermal floor.

Step 2: Tiles

It is a decorative material, mainly used for the walls and floors of kitchens and bathrooms. It has the advantages of waterproof and scrubbing resistance, and can also be used for floor paving in living room and bedroom. At present, glazed tiles, vitrified tiles and antique tiles are the most popular in the market.

3. Sanitary ware

Including toilet seat, wash basin, female washer, mop pool and other ceramic products. Toilets can be divided into ordinary toilets and intelligent toilets according to their functions, and there are two ways of flushing and siphoning. Wash basin is divided into under-table basin and desktop basin, which can be selected according to personal preference.

4, cabinets

It is an essential main material for kitchen decoration today. Cabinets are divided into integral cabinets and traditional cabinets. The whole cabinet is designed in advance, made by mechanical technology and installed quickly, which has great advantages compared with traditional cabinets and has gradually replaced traditional cabinets.

Step 5: doors

Like cabinets, there are suite doors of various materials and techniques on the market, which have basically replaced the doors and doorways made by traditional carpenters. Suit doors are mainly divided into die-pressed doors, steel wooden doors, paint-free doors, solid wood composite doors and solid wooden doors. There are also sliding doors of various materials.

6, lamps and lanterns

It is the main tool for lighting at night, and also has a certain decorative effect on the effect of space. The choice of lamps should consider three points: practicality, beauty and energy saving.

7. Switches and sockets

According to the function, it can be divided into N-open, N-open dual control, five-hole socket, 16A three hole socket, switch socket, information socket, telephone socket, TV socket, multi-function socket, speaker socket, blank panel, waterproof shell, etc.

8. Water heater

There are three kinds of water heaters in the market, namely, water storage electric water heaters, gas water heaters and electric instant water heaters. How to choose a water heater depends on the room layout and personal habits.

9, faucet shower

This is the most commonly used pipe part. At present, the most popular faucet shower materials are copper chrome plating and ceramic valve core, and the water heating part of pure copper is the most reliable guarantee to avoid hidden dangers in waterways.

10, range hood

The main function of the range hood is to absorb the cooking fume. According to the different smoking principles, the market can be divided into deep-suction range hoods, European range hoods and side-suction range hoods. Cooking stoves are divided into open flame cooking stoves and infrared cooking stoves.

1 1, radiator

It is divided into cast iron radiator, steel radiator, copper-aluminum composite radiator and copper radiator. In addition to traditional radiators, geothermal heating is also very popular now. General houses are equipped with heating devices when delivered, which can be replaced according to individual needs.

12, wallpaper

A new type of wall decoration material can supplement the monotonous color and texture of latex paint and produce strong visual impact and decorative effect. Although wallpaper is not a necessary main material for home improvement, it has gradually approached home improvement in recent years.

13, ceiling

It is a decorative material, which is used to prevent the moisture in the kitchen and bathroom from eroding the shed surface and shielding the pipeline. Mainly divided into plastic steel plate, aluminum plastic plate, aluminum gusset plate, integrated ceiling, waterproof gypsum board ceiling, sauna board ceiling.

14, stone

Divided into natural stone and artificial stone, natural stone has the advantages of durability, natural texture and low price. Artificial stone has the advantages of radiation, various colors, seamless bonding and good impermeability. Can be used for windowsill boards, countertops, stair treads, wall decoration, etc.

15, sink

It is an essential functional product in the kitchen. From the function and size, it is divided into single slot and double slot, and there are models such as cutter, trash can and water shower tray. Most materials are made of stainless steel.

16, water purifier

Filter products for improving domestic water and drinking water are divided into central water purifier, kitchen water purifier and direct drinking water purifier according to the scope of use. Although the water purifier is not a necessary main material for home decoration, it is increasingly favored by people with the improvement of people's requirements for quality of life.

17, garbage disposal

Solve the cleaning problem of daily edible garbage, which is convenient and hygienic. Home decoration is not necessary, but it is recommended to reserve power supply under the sink to facilitate installation when needed in the future.

In addition to the above products, most of them are purchased in the decoration, such as disinfection cabinets, ovens, curtains, furniture, household appliances and other products. I don't describe them one by one. You can make a budget according to your own needs. Most of the decoration expenses are in the above items.

The above is the strategy of the whole decoration process.