Traditional Culture Encyclopedia - Traditional culture - Operation method and steps of engraving machine
Operation method and steps of engraving machine
2. After completing the above steps, double-click to open the software, and the interface is as follows. Click OK below to open the software interface as shown in the figure below. If the coordinates in the upper right corner are still gray, repeat this step and find the COM port corresponding to the installed hardware in the device manager.
3. Click the "Manual" area with the mouse, and a drop-down interface will appear. Click these directional buttons with the mouse, as shown below. The current display is "10". Click the corresponding number with the mouse to adjust it from 0.0 1 to 100.
4. Click "Spindle" on the right side of the software, as shown below: 775 clicks with the current spindle speed setting as standard will be displayed, and the maximum spindle speed is 9000! Speed setting.
5. Click "Open" at the bottom of the software to open a dialog box, as shown in the figure below. Then you can choose the NC file edited by artcam to complete the computer engraving, as shown below.
Daily maintenance
The continuous operation time is less than 10 hour every day to ensure the cleanliness of cooling water and the normal operation of water pump. The water spindle motor must not be short of water, and the cooling water should be replaced regularly to prevent the water temperature from being too high. In winter, if the working environment temperature is too low, you can replace the water in the water tank with antifreeze.
Every time you use the machine, pay attention to cleaning, be sure to clean the dust on the platform and transmission system, and lubricate and refuel the transmission system (X, Y and Z axes) regularly (weekly).
(Note: X, Y and Z three-axis polished rods are maintained with engine oil; Add high-speed butter to the screw; In winter, if the working environment temperature is too low, the PRTT ball screw and polished rod (square guide rail or circular guide rail) should be cleaned with gasoline first, and then engine oil should be added, otherwise, the resistance of the transmission part of the machine will be too large, resulting in dislocation of the machine. )
When carrying out maintenance inspection on electrical appliances, the power supply must be cut off, and it can only be carried out after the monitor has no display and the main loop power indicator light goes out.
After the engraving machine has been used for about three months, the fasteners should be checked to tighten the connecting screws on both sides of the gantry, the fastening screws of the lead screw nut and the fastening screws of the motors on both sides.
- Previous article:Phonetic Creation: Old Houses of the North and South Differences
- Next article:Summary of the work of the fishing activities
- Related articles
- How does Alibaba lead the e-commerce market in China?
- It's free to name the website, and it's also free to name the website.
- What are the advantages and disadvantages of cooperative strategy and competitive strategy?
- Past generations of BMW 7 Series models
- How did the color tone develop?
- These two kinds of fake wines are sold to many provinces, which will cause great harm after drinking.
- The difference between Chaozhou music and Guangdong music
- How to make steamed buns and mixed noodles?
- Dong Xiao's best music.
- All the weapons in the romance books of Sui and Tang Dynasties