Traditional Culture Encyclopedia - Traditional culture - Construction process and maintenance of antique brick wall.

Construction process and maintenance of antique brick wall.

Construction technology of antique brick wall, the first step: "Planning and decision-making" The common packaging methods of antique brick in traditional wall bricks are "herringbone paste", "uncovering paste" and "oblique diamond" in horizontal and vertical packaging methods. ? "Brick trimming and cutting into small bricks" packaging, "floor tile edge" packaging. There are many ways of packaging, and each way has its own advantages. Choosing a suitable packaging method has nothing to do with designers, purchases, calculations, etc. So don't think easily.

The construction process of antique brick wall refers to "leveling", which is the so-called leveling before antique brick packaging. The surface of the building must be the second phase (such as the grounding surface of the inner wall and the outer wall). Remove surface dirt, sprinkle water and mix with cold water and cement sand. Usually, the concrete floor is maintained with a lime shovel until the cement-sand mixture is completely dry.

The third step of antique brick wall construction technology: "rebound". Elastic line is a line drawn on the joint method of brick with slender lines, coated with alkali, color or white materials, and then imitated the position of antique brick and the reference line of electric plane. It is recommended to use black lines on the board.

The fourth step: "packaging". After completing the above steps, you should start to deal with tiles. Advanced/imported antique tiles are designed to provide a more natural packaging effect, and the tiles are built on a straight line. Side. In this way, it is necessary to emphasize the packaging technology, according to the direction of road signs and arrows (the bricks behind the big antique brick brand are generally in the direction shown in the picture). The construction technology of antique brick wall, otherwise, the wrong packaging direction will lead to "different sizes" and other problems. Pay attention to the careful construction of the construction team, which can greatly reduce the possibility of future decoration.

Step 5: "Deep Brick". Put inferior smooth tiles into clean water to avoid bubbles. Tiles are completely water-absorbing, so after the decoration is completed, the tiles are deformed by preventing the dried tiles from absorbing water again.

Step 6: "Mix". Cement mortar should be 1:? 2, mixed cement mortar should be less than 200 # coated on the back of ceramic tile.

Step 7: "Mud". Remove the deposited tiles, dry the water stains, fully spray the leveling layer with water, and evenly brush the cement mortar on the back of the bricks. The thickness of the mortar is 5 to 6 cm. When using a large mat, the bricks must be very thick. Tap the brick with a wooden hammer immediately after loading to avoid empty drum, and keep it level with a ruler at any time.

The last step of antique brick wall construction technology: fill the "trimmed" specific area, fill the brick joints with caulking agent, and finally remove the dirt on the brick surface, such as cement mortar, sewage, stains, etc., and strengthen maintenance.

Tubatu Online provides you with "every decoration quotation, 1-4 local decoration companies, 3 sets of decoration design schemes" and the decoration pit avoidance strategy for free! Click this link:/Zhu Ye /zxbj-cszy.php? to8to _ from = SEO _ zhidao _ m _ jiare & amp; Wb, you can get it for free ~