Traditional Culture Encyclopedia - Traditional customs - How to start the foundation construction of a 2-story villa building?
How to start the foundation construction of a 2-story villa building?
The foundation construction of the villa is the same as that of other houses. The construction sequence is: laying out the wire positioning - nailing the gantry positioning wooden piles - spreading the foundation excavation gray line - digging the soil - pouring the cushion layer - tying the reinforcement -
—Formwork—pouring foundation concrete—maintenance—removal of formwork—backfill soil.
From the perspective of process sequence, foundation construction should start with positioning and laying out.
1.
Foundation engineering construction methods and precautions (1) Understand the soil conditions and determine the excavation method.
(2) Determine the edge failure coefficient or foundation pit support form according to the soil quality, excavation depth and site conditions to ensure the safety of the foundation trench edge, etc.
- Related articles
- What's the difference between the workplace and the ordinary working environment?
- Translate the following sentences according to the Chinese meaning, not limited to words. (***5 small questions; 2 points for each small question, 10 points) small questions 1: Yangzhou is famous for
- How big is the porch table?
- An analysis of the reasons for the transformation of traditional communities
- Three Gorges Imitation Essay 400 Words Spring, Summer, Autumn and Winter
- How to Massage Face and Face-lifting Four Acupoint Massage Skills
- How to design Italian soft clothes with strong artistic flavor?
- Method of French foie gras
- How to write the beginning and end of the Spring Festival?
- The principle of virtualization technology