Traditional Culture Encyclopedia - Traditional customs - Construction skills of beam-pressing formwork for structural column of infilled wall in frame engineering
Construction skills of beam-pressing formwork for structural column of infilled wall in frame engineering
(1) Masonry shall build lightweight infilled walls as required, so as to ensure that the position and cross-sectional dimensions of constructional columns are accurate, the design of horse teeth is correct, and the verticality and flatness of walls meet the requirements.
(2) When the woodworking joist presses the beam template, it is generally necessary to complete 3~5 layers of masonry in the lightweight wall. D. After the masonry mortar reaches a certain strength, the shuttering carpenter shall measure the punching position on both sides of the constructional column or the filling wall at the bottom of the pressure beam according to the spacing requirements of the formwork support and reinforcement scheme, and mark it with chalk or red and blue pencils.
(3) The electric drill is equipped with a drill bit, the diameter of which is 16mm (about 500mm in length), and the holes marked on the wall are drilled and drilled through the lightweight infilled wall.
(4) After the constructional column template is installed, drill the opposite bolt on the light wall, put the butterfly card on the opposite bolt, and fix the steel pipe reinforcement template with a diameter of 48 mm ..
(5) After the steel bar binding of the pressure beam is completed, after checking that the diameter, specification, model, root number and spacing of the steel bar meet the requirements, insert a stepping fastening fixture into the borehole of the filler wall at the bottom of the pressure beam, and install a fixed template on the fixture.
(6) After the formwork is supported, the concrete pouring can be carried out only after the geometric dimensions and reinforcement of the formwork meet the requirements.
This method of drilling holes in the light wall, threading opposite bolts or gradually tightening fixtures to reinforce the formwork is an ideal construction method with less materials such as bolts or fixtures, firm formwork reinforcement, fast construction speed, almost no damage to the wall surface of the light wall, and convenient and fast construction.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:Explosive detonation adventure Where danger goes?
- Next article:How many kinds of dances are there in the world?
- Related articles
- Myth story idiom four words
- Small slope essay (3)
- What is the national costume of Russia!
- Sichuan New Year's Eve Dinner Recipes
- Psychological analysis of different groups of home buyers
- Processing method of tenon and mortise
- The new product S3 S5 of BAIC Group was unveiled.
- Ancient Poetry of Chemical Reaction in Middle School
- What to do with green radish
- What is the difference between amino acid and fullerene toothpaste?