Traditional Culture Encyclopedia - Traditional customs - What's the difference between a plan and a plan?

What's the difference between a plan and a plan?

Pre-plan refers to an emergency treatment plan formulated in advance based on evaluation, analysis or experience and according to the category and influence degree of potential or possible emergencies.

This scheme is concrete, thorough and operable from the aspects of purpose, requirements, ways, methods and progress.

This plan is the most complicated one in the plan. Because of the complexity of some specific tasks with certain functions, it is not enough to explain the problem without comprehensive deployment, so the content of official documents is bound to be complex, generally including guiding ideology, main objectives, work priorities, implementation steps, policies and measures, specific requirements and so on.

The content of the scheme is mostly the work assigned by the superior to the subordinate or involves a large area. Generally, it is distributed in the form of "file header" without signature, only the title, writing time and text are needed.

There are generally two ways to compile the scheme text: one is the conventional way, that is, according to the guiding principles, main objectives (key points), implementation steps, policy measures and requirements, which is a relatively fixed procedure and suitable for general routine single work; The second is variable writing, that is, adding or subtracting items according to actual needs, which is suitable for special single work.

But no matter which way you write it, the three items are indispensable, and the names in the actual writing can be different. For example, the main objectives are called "goals and tasks" or "goals and countermeasures", and the policy measures are called "implementation measures" or "organizational measures".

In the "main goal", it is generally divided into general goal and specific goal; "Implementation steps" are generally divided into basic steps or stages and key steps, in which there are key work items; The contents of "policy measures" are generally divided into "policy guarantee", "organizational guarantee" and "specific measures".

Planning is a preparatory plan, which belongs to a kind of work plan in terms of language nature, but it has the requirements of concreteness, professionalism, thoroughness and concentration of time limit, and belongs to the category of applied writing research.