High-rise starts installing climbing frames from the first few floors
Generally, ordinary steel pipe scaffolding to build to about 6 floors to start using climbing frame. Climbing frame is also called lifting frame, according to its power source can be divided into hydraulic, electric, manpower hand-pulled and other major categories. It is a new type of scaffolding system developed in recent years, mainly used in high-rise shear-wall buildings. It can climb up or down along the building.
Difference between climbing frame and scaffolding
Economic benefits are different:
1, hanging scaffolding is very convenient, can save a lot of materials, labor, high economic benefits.
2, floor-standing scaffolding but the cost of materials and labor, a large one-time investment, long construction period, low economic benefits.
3, attachment elevation scaffolding, also called climbing frame, relatively speaking, the economic benefit is general.
Using different methods:
1, hanging type is generally along the building exterior wall full of, on the structure and decoration construction.
2, attached lift scaffolding is the frame on the body or the building structure of the special lifting equipment to achieve lifting.
3, floor-standing scaffolding rely on the ground support to complete the erection.
Non-floor-mounted scaffolding main features
1, do not need the ground and a solid foundation for scaffolding support, and does not take up the site within the construction;
2, scaffolding is not full of ride, only built to meet the construction operation and all the safety requirements of the height required, so that the number of scaffolding use does not increase due to the height of the building;
3, Scaffolding and the load it bears through the cantilevered bracket or connectors to the building structure connected to this part of the structure of the strength to have certain requirements;
4, scaffolding with the construction progress of the building along the exterior wall lift, can save a lot of materials, labor, economic benefits with the height of the building increases and more significant.
Attached lifting scaffolding, also known as climbing scaffolding, refers to the use of various forms of frame structure and attached support structure, relying on the special lifting equipment set up on the frame or building structure to realize the lifting of the construction of the construction scaffolding.
- Related articles
- Five working schedules of the engineering department
- The Essence of Ten Traditional Cultures in China
- Discusses the garden layout form and design method
- The Creation of Yang li Ping's Dance
- Bluetooth headset connection method
- What is the origin of China red scarf?
- Small Duplex Decorating Sample House Tips How to Decorate a Small Duplex House
- What are the main influences of urbanization on traditional neighborhood relations?
- Northeast three provinces tour guide Northeast three provinces in-depth tour guide
- Introduction of popular tourist attractions in Quanzhou