Work summary is a comprehensive and systematic general inspection, general evaluation, general analysis and general research on the work for a period of time, analyzing the shortcomings of achievements and drawing lessons from them. The following are five summary reports of the company's work that I have compiled. I hope you like them.

Company work summary report 1 x as _ _, my main job is to do indoor information of bridges and culverts, and to be responsible for collecting, sorting and archiving the information. With the goal of "improving myself in my work and creating value for the company", I studied hard, consulted my leaders, learned from my colleagues, innovated constantly, and successfully completed my job. Have a certain understanding of this industry, professional skills and working ability have made great progress.

1 Work experience

According to the working experience of half a year, I realize that data is also an extremely important link to measure the quality of a project, in addition to being reflected by engineering entities. The data can reflect the quality of materials used in the project, whether the connection between processes meets the requirements, whether the project is carried out according to the drawings, and so on. Therefore, internal personnel play an important role in engineering construction. In addition, I completely abandoned the idea that "work experience is more important than academic qualifications" because the two are complementary. I think that "vision determines thinking and thinking determines the way out". With a solid theoretical foundation, you will have broad ideas when dealing with problems, and your work experience can provide important reference when dealing with problems. Therefore, as the company's documenter, I strictly require myself to accumulate experience, strengthen my study, do a good job in collecting, sorting out and archiving information, and make due contributions to the company's development.

2. Professional skills

Through X years' practical work, I have closely combined theory with practice, and quickly mastered the technological process of bridge and culvert construction and related specification requirements. From the first time I studied and studied drawings, my professional skills have made great progress. Now I can find out what is in the drawings. I deeply realized the profound meaning of "practice makes true knowledge". At present, I am using my spare time to learn the drawings and construction methods of tunnels and subgrade, seize the time to fully understand the civil engineering construction industry, arm my brain with professional knowledge, and lay a solid foundation for future work.

3. Ability to work

From a student who just left school to a skilled librarian, I have experienced a process from the initial hectic to the present. I insist on finishing what you can do today. I'd rather work overtime to ensure that the information is filed in time. At work, I give full play to my subjective initiative and explore a set of methods to improve work efficiency. As we all know, the work of sorting out data is complicated, and it is easy to forget things entirely by the brain, so I have prepared a "work task list" to record the tasks I think of at any time to ensure that the work is carried out in an orderly manner every day; In order to make the archived data clear at a glance, I compiled a "list of archived data" to record the archived data. When reporting the work, the data were properly classified, true and accurate, and the electronic version of the data was intact, which was praised by the leaders.

4. Occupation

Documentary is the most basic and comprehensive work in the civil engineering industry. I think as a new employee, the position of information officer is a good platform for all-round learning. The librarians have a wide range of contacts, including things related to quality, technology and on-site comprehensive management in the civil industry, laws and regulations, construction quality specifications, technical standards, safety standards, etc. Some people say that "there are two results in being an information officer: one is the mechanical work that is repeated forever, and in layman's terms, there is no future; One is to work hard and fully understand and master the work to be done in the future through the work of librarians. "

So in the stage of being an information officer, I focused on my career goals to study, lay a solid foundation for my future development direction, and gradually show my talent in this field. At the same time, in my spare time, I pay close attention to national policies and industry trends, actively understand information, prepare to take the first-class registered structural basic course exam in X years, make achievements in the construction industry as soon as possible, and become a civil engineering professional engineer. Although I have made some achievements in my work, I am still soberly aware that there must be many shortcomings in my work. In the new year, I will be more strict with myself, study hard, constantly update and supplement new professional knowledge, improve my business level and work ability, sum up my experience and better complete the data sorting work. I told myself: My work goal in X years is to be an excellent librarian, but my professional goal is not just to be a librarian. I will take practical action, I have the ability to undertake more technical and professional work!

Company Work Summary Report 2 In the past 20 years, with the support and care of the leaders of the Municipal Construction Management Bureau and relevant units, the production work of our company has been well carried out, and the production management has gradually moved towards a healthy and orderly development path. The management team of the company continues to unite and lead all employees, with the work goal of "creating advantages, increasing production and income, steady operation and steady development" as the theme. All the staff carry forward the pioneering, pragmatic, innovative and dedicated enterprise spirit and down-to-earth work style, which makes the business, management and benefit of the head office rise steadily, successfully achieves the annual work target and maintains the company's sustained and stable development trend.

First, the main objectives.

This year, our company * * * undertook X projects and _ _ projects with a total cost of about X million yuan, which have all been completed. Realized output value: X billion yuan, up by X% year-on-year, exceeding the 20-year plan target.

2. Work performance: mainly reflected in business development, construction management, internal management and spiritual civilization construction.

(1) Take business as the leader, steadily expand business, steadily increase benefits and steadily advance. Under the leadership of the company and under the pressure of fierce competition, business development personnel continue to increase their business strength, take the initiative to attack, actively communicate with customers, grasp the pulse of market changes in time, and pay attention to the analysis, accumulation and summary of experience. Actively participate in the public bidding of the sound, city and district bidding trading centers and the invited bidding projects organized by the owners themselves, so that the company can win more bid-winning business. According to statistics, there are X projects (excluding projects below 500,000 yuan) that have participated in public bidding and invited bidding in the past 20 years. * * * Signed X project contracts throughout the year, with an estimated output value of X billion yuan.

(2) Focus on the project implementation and management, intensify the work, improve the overall quality and management level, strictly grasp the quality, safety and civilized construction, and ensure the safety, production and construction excellence of civilized construction. This year, the newly-started area of the company reached X㎡, and the completed area reached X㎡. In the project construction management, the Quality and Safety Department closely focuses on the company's management ideas, while ensuring Excellence, always firmly grasps the "lifeline of quality and safety", actively carries out safety production week and 100-day safety accident-free activities, pays special attention to the regular meeting system of departments and projects, effectively implements the weekly document system, administrator log system, business training system and supervision fund monitoring system, and unremittingly pays special attention to project construction management.

In order to ensure the quality of the project, the Ministry of Public Security and the Ministry of Science and Technology organized various special safety inspections, such as Spring Festival inspection, post-holiday inspection, SARS prevention inspection, and safety production activity month. It has been inspected by the competent departments at all levels for more than ten times, and has made unremitting efforts in project management. We have made gratifying achievements in the management of the six tasks of "creating excellence, creating quality, creating safety, creating civilization, creating time limit for a project and creating funds", and earnestly implemented the acceptance standards issued by the state. The head office organized and arranged professional and technical backbones to compile "Enterprise Construction Execution Standard", which ensured that the construction operation procedures of all the project departments under the company had rules to follow, and the construction management of the Quality and Safety Technology Department had evidence to follow.

The third part of the company's work summary report On the occasion of resigning the old year and welcoming the new year, on behalf of the trading company, I would like to make a comprehensive summary of the work in the whole year of 20__ _, and briefly expound the working ideas in 20__ _. Looking back on the past 20 years, although our company encountered the economic downturn in real estate and other fields in our city, it was difficult to carry out all the work, but with the strong leadership of the group company and my colleague Qi Xin of Qi Xin, we successfully completed all the tasks assigned by the group company.

First, complete the basic work in 20 years.

According to the introduction of the group company, our company has successively completed the material procurement task of Xue Jiawan Heze Project, the whole section maintenance of Shayu Highway, the further improvement of Yu Wei Highway, the procurement of decoration materials for Shage Blocking Store, the installation of underground garage facilities in Kang Ya 'an, the decoration of Kang Ya 'an Store and other projects, and also completed the material procurement and temporary arrangements of various departments of the group company. Accumulated 30 applications for bulk material procurement and 30 contracts signed.

Two, 20__ years of work problems and suggestions for future work:

Problems existing in the work of 20__ years:

1. The plans of various departments for purchasing materials are not perfect.

The total quantity, specifications, models, entry time and product quality requirements are basically not clearly filled in in the procurement of various materials and products, which makes it difficult for us to grasp the procurement time and entry time in the procurement process, which leads to the increase of costs, and finally leads to the responsibility of mutual promotion of quality factors due to on-site application. Therefore, I suggest that in the future work, we should plan the required products in advance and fill out the application form for material procurement.

2. In the process of material procurement, the examination and approval links are repeated, and the application materials are delayed.

Every time the materials are purchased, the summary table of price adjustment shall be issued first, and the heads of various departments shall be asked to check the price and determine the suppliers. It takes two to three days to approve this project. Then start drafting the contract according to the basic content of the price adjustment table, and then start the internal examination and approval of the contract content, which takes at least one week, sometimes 1.

It takes two weeks or more to complete due to the business trip or leave of absence of individual department heads; After the contract is approved, the two parties start to sign the contract, and it often happens that the other party does not accept the terms of the contract we accept, and the terms accepted by the other party are unacceptable to us. The negotiated price needs to be re-determined with the change of the market, and it takes a lot of time to re-determine the price and re-approve the contract, which leads to the inability to enter the market in time and effectively control the cost. Therefore, we suggest that the approval process should be formulated scientifically and reasonably in the future work, so as to be concise and to the point. In addition, we must grasp how long it takes to submit all kinds of materials, leaving us enough time to get the lowest cost return.

3. The scope of supply market is not wide enough.

At present, most of our suppliers are local customers, and there is no good mechanism to form the best choice of the origin of the required materials, which affects the control of the lowest cost to some extent. Therefore, we suggest that in the future work, we should continuously collect the price information of the origin of materials and go out for field trips to further control and save costs.

Three, 20__ year work plan and main ideas

In 20__, we will follow the guiding ideology of "code of conduct, cooperative operation, openness and transparency, honesty and efficiency", constantly refine the procurement management process, control procurement costs, expand supplier selection, improve supplier file management, pay attention to standardization and efficiency, ensure the smooth completion of the annual work tasks, and further reduce procurement costs on the premise of more standardized and reasonable procurement. Summarize the gains and losses of the previous year and guide the work ideas for the next year. In the 20 years of work, we should further strengthen our professionalism and sense of responsibility, and at the same time, our department will continue to make a phased summary; Carry out criticism and self-criticism to find the gap. Try to reduce costs and improve efficiency. Create greater benefits and make more contributions to the development of the group company in the new year. At the same time, I wish our group company more brilliant achievements in 20__. thank you

Summary Report on the Company's Work 4 20__ year was a year for _ _ Group to bravely break into the market and overcome difficulties. It is also a year of rapid innovation and development for _ _ Group. Its project scale and output value both blossomed and achieved remarkable results. With the concerted efforts and efforts of _ _ _ _ Qi Xin, the project management has reached a new level, laying a solid foundation for the rapid development of _ _ Group. Under the unified leadership of the group company, the project management department has always implemented the group's business philosophy of "harmonious * * * win-win and common * * development", with the management principle of "strengthening project safety as the core, improving project quality as the center and ensuring project profitability as the goal", and adopted proactive management measures to continuously improve the project management level and service level, overcoming difficulties such as wide project coverage, multi-industry operation and weak technical force. Ensure that there are no quality and safety accidents, no arrears of wages for migrant workers, and no written notice of default by the owners. The group company has successively won the honors of "Excellent Project Department for Contract Performance Assessment", "Standardized Construction Management Site of Construction Project" and "First Prize of Huangshan New Rural Construction", which reflects the good management level of the project, establishes a good corporate image, and has been repeatedly affirmed and praised by the competent authorities and peers, creating a good environment for undertaking the project again. At the same time, we should face up to the weak links in project management, which urgently need our improvement:

1. The technical strength of some project departments is relatively weak, the construction level is not high, and the project quality can not meet the high-quality requirements of internal reality and external beauty.

2. The safety education of some project departments is not in place, the safety awareness is weak, and the safety measures and standardized construction are not up to standard, so it is urgent to improve the safety management level.

3. The indoor work of some project departments is relatively backward, and they do not pay attention to the contract performance evaluation, which has a certain negative impact on the operation of the group company.

4. The project cost management is not systematic, the profitability is out of touch with the project management and construction plan, and the management benefit space needs to be improved. The year of 20__ is a crucial year for the transformation and upgrading of the project management of _ _ Group. With the rapid development of business and the continuous expansion of scale, all work is gradually promoted to specialization, refinement and standardization. Focusing on the company's development strategic objectives, the project management department focuses on the following work:

1. Establish and improve the project management system, adjust some project management systems and methods, and gradually establish various management modules and databases of the company to enhance their operability and practicality, which will play a positive guiding role in project management.

2. Change working ideas, adopt a proactive attitude, and constantly improve the service level of project management. While doing a good job in daily work, the project management department strengthens the study of professional knowledge and management methods, constantly improves the ability of business and problem solving, and solves various problems encountered by the project department in time. Be able to find the deficiencies in project management during on-site inspection and put forward rectification measures in time, provide guidance for the project department's engineering change, construction settlement and engineering audit, and realize the win-win goal of the company and the project department.

3. Further increase the training of technical force of the project department and improve the level of project quality management. This year, the project management department will concentrate on writing the quality management manual, summarize the conventional construction technology and common quality defects, clarify the control points, construction requirements and preventive measures of common quality defects in key working procedures, and guide the project department to strengthen construction quality monitoring. At the same time, according to the characteristics of the project construction, it is planned to adopt various training methods such as on-site guidance, special meetings and written requirements for special processes to improve the quality awareness of on-site construction personnel, optimize technical schemes, improve project quality and increase management benefits.

4. Strengthen project safety management and gradually standardize civilized construction. "Safe production" is the foundation of enterprise's survival and development, and it is a powerful guarantee to realize project benefits. Under the unified deployment of the group company, the project intends to gradually improve the safety management system, set up a company safety leading group, clarify the responsibilities of team members, and refine safety rules and regulations and measures; Strengthen on-site safety education, training and publicity, constantly improve the awareness of safety in production, gradually change from not knowing safety to managing safety, change from requiring me to be safe, strictly control illegal operations, strictly prohibit taking up posts with illness, put an end to safety accidents, and ensure the realization of the Group's goal of zero accidents in safety production.

In order to standardize civilized construction, the project management department will also introduce corresponding methods and measures, gradually standardize enterprise signs and safety protection measures, unify safety signs, signs and signs, and gradually standardize on-site civilized construction, and plan to build a number of "standardized construction management sites for construction projects" to fully display the unique corporate culture and corporate image of the Group, so that all projects can benefit and enjoy honor and success.

"Nine Wan Li is in full swing and the sea and sky soar freely", dear colleagues, let us meet the challenge of the new year with full passion. On the platform of the _ _ group, let's sail and realize our dreams!

Thanks again!

Looking back on 20 years, the customer service department of property management company can be said to be a year of further development, and it is a year of continuous improvement and improvement in various governance performance. Among them, the property customer service department has been concerned and supported by the company leaders, and has also received great assistance from other parts. After the efforts of all the customer service staff in the past year, the work of the customer service department has made great progress compared with the previous year, and various work systems have been continuously improved and implemented. The service concept of "customer first" has been deeply imprinted in the hearts of every customer service staff. Looking back on the customer service work in the past year, there are gains and losses. The customer service work in the past year is summarized as follows:

1. Deepen the implementation of the company's rules and regulations and customer service system.

On the basis of various rules and regulations preliminarily improved in 20__, the focus of 20__ is to deepen the implementation of this customer service department and deepen the familiarity and understanding of property management according to the development of the company. At the same time, with the introduction and improvement of some laws and regulations in the property management industry, the customer service department has also adjusted the relevant systems of customer service in time to better adapt to the new situation.

2. Integrate theory with practice and actively carry out the training of customer service personnel.

Use the regular meeting time of customer service department every Friday to strengthen the training of this part of the staff. The training work is based on the practical problems encountered in the past week, so that theory and practice can be combined to make each customer service staff more familiar with the service concept.

3. Daily maintenance treatment

According to the workload statistics every weekend, it will receive more than a dozen various forms of repair reports. According to the different maintenance contents, actively dispatch workers to solve the problem in the shortest time. At the same time, pay a return visit in time according to the completion of the repair report.

4. Collection of property fees in Area X

According to the charging index issued by the company at the beginning of the year, actively carry out the collection of property fees in X and X areas. Finally, with the support of the property manager, secretary and other parts, the charging index issued by the company was completed.

5. Collection of energy fees

At the same time, the quarterly charge of water meter reading in X area was completed as scheduled, and the new task assigned by the company-the first charge of water meter reading in X area was completed.

6. Rent-inviting work of merchants in Area X..

Formulate the underlying commercial leasing scheme and introduce supermarket and drugstore projects in the second half of the year.

7. Take back some buildings

Completed the repossession of Building X and Building X within X months; At the same time, part of the work of moving back to the building in area X has been completed.

8. Organize fund-raising activities.

After learning the news of X, the leaders of the property company immediately decided to hold fund-raising activities in the community to offer love to the people in the disaster area. This task is completed by the customer service department. After receiving the instruction, all the staff of the customer service department actively offered suggestions and successfully completed the fundraising activity.

9. Decoration and layout of parks during festivals.

Actively complete the decoration and layout of the park during various festivals. This year, the company increased the decoration and layout of the park during Christmas (a festival attracting young people's attention), and bought Christmas trees and various decorations in the lobby of the X gate and the X area of the community.

10. Owners' Symposium

On the eve of the Spring Festival, the annual owners' forum was organized. The invited owners spoke actively at the meeting, fully affirmed the service work of the property management company and put forward pertinent suggestions.

In a word, on the basis of 20__ years' work, we are full of confidence and hope for 20__ years. In the new year, we firmly believe that as long as we work hard, actively explore and forge ahead, through our efforts, we will be able to complete all the work indicators issued by the company.