Selected emergency plans for production safety in 2022

In daily production, accidents may happen at any time, and the safety alarm will ring. Do you know how to write the emergency plan for production safety? The following is the Selected Emergency Plan for Work Safety in 2022 compiled by me, for your reference only. Welcome to read this article.

Selected emergency plans for production safety in 2022 (I) 1. general rules

Compilation basis of 1. 1

According to the Occupational Disease Prevention Law, Fire Prevention Law, Regulations on Safety Supervision of Special Equipment, Regulations on Safety Management of Hazardous Chemicals, Demonstration Emergency Plan for Safety Accidents of Small and Medium-sized Enterprises in xx City and other relevant regulations, this plan is formulated. This plan is applicable to the rescue work of production safety accidents in this unit.

1.2 working principle

Follow the principle of quick response, unified command, unit self-help and professional emergency rescue.

2. Organization and responsibilities

2. 1. Under the unified leadership of the company, the accident emergency rescue work is managed by full-time safety production management personnel; All relevant functional departments cooperate with each other, carry out their duties and cooperate closely to implement emergency rescue measures for production safety quickly, efficiently and orderly.

2.2 Command Organization and Responsibilities

2.2. 1 Chief Commander:

Telephone:

Deputy commander of the headquarters:

Telephone:

Command member:

2.2.2 The specific responsibilities of the emergency rescue headquarters are as follows:

(1) Responsible for organizing relevant departments to formulate emergency rescue plans;

(2) Responsible for the unified deployment of the implementation of emergency plans and emergency measures;

(3) Responsible for calling all kinds of vehicles, materials, equipment, personnel and occupied space within the scope of this unit;

(4) Responsible for cooperating with the superior departments in accident investigation and handling;

⑤ Responsible for stabilizing the production order, handling the aftermath and appeasing the casualties;

⑥ Be responsible for organizing the rehearsal of the plan, and timely adjusting, revising and supplementing the plan.

2.2.3 The emergency rescue team (dispatching auxiliary team leader, maintenance team, safety team, project system contractor, project supervision department and related personnel) is led by the dispatching auxiliary team leader, and each team cooperates. Members of this group should be familiar with the scene, topography, equipment and technology of the accident, go deep into the accident area to repair the equipment when necessary, prevent the accident from expanding, reduce the accident loss, curb the expansion of the hazard scope, and be responsible for the accident investigation.

2.2.4 security fire brigade (security team)

(1) Responsible for maintaining public order at the scene, evacuating people in a planned way according to the accident development trend, and controlling the entry and exit of people and vehicles in the accident area;

(2) Take charge of fire fighting, leakage and other tasks, monitor and protect other potential danger points such as leakage, fire and explosion, take charge of emergency rescue, and take measures to prevent accidents from expanding and causing secondary accidents;

(3) The person who is directly responsible for the accident is responsible for supervision.

2.2.5 Logistics Support Group

(1) is responsible for providing material support for emergency operations. These include emergency rescue equipment, rescue protection equipment, monitoring and analysis equipment, vehicles, etc.

(2) To be responsible for organizing the implementation of the logistics support and aftermath of rescuers.

3. Prevention and early warning

3. 1 Preventive monitoring measures

3. 1. 1 Prevention and monitoring measures for accidents caused by falling from a height and striking objects:

(1) Seriously implement relevant safety operation procedures;

(2) Lifting workers must hold relevant certificates;

(3) There should be effective and reliable protective facilities for aerial work;

(4) The lifting equipment is equipped with complete and effective limit devices. Before operation, check the safety facilities such as superelevation limit, braking device and broken rope insurance. , the hook should have a safety device;

(5) The hoisting operation shall ensure that the materials are firmly bound and cannot be hoisted;

⑥ It is forbidden to operate faulty equipment.

3. 1.2 Prevention and monitoring measures for mechanical injury accidents:

(1) according to the technical performance requirements of the correct use of mechanical equipment, check whether the safety device failure at any time;

(2) Carry out mechanical operation according to the operation procedures;

(3) Mechanical repair, maintenance or adjustment in operation and operation are strictly prohibited;

(4) timely maintenance, found that there is leakage, disrepair or overload operation, etc. Stop using.

3. 1.3 Fire accident prevention and monitoring measures:

(1) Go to the site, warehouse, living area, canteen, etc. Conduct regular safety and fire prevention inspections;

(2) Configuration and installation of short circuit device and leakage protection device. Install leakage protectors with alarm devices where necessary;

(3) strictly control the open flame operation, put an end to smoking;

④ Explosion-proof devices are used for the electrical equipment in the warehouse where combustible gases and combustible materials are stored.

3. 1.4 electric shock prevention measures

(1) The design, installation and use of electrical equipment and devices conform to relevant national standards;

(2) Non-electricians are forbidden to install and disassemble electrical equipment and devices;

③ Strictly check the safe voltage in different environments;

(four) between charged bodies, between charged bodies and the ground, between charged bodies and other facilities, between staff and charged bodies, must keep enough safe distance for isolation and protection;

⑤ Set up eye-catching words or graphic signs in places where there is danger of electric shock;

⑥ Protective grounding measures shall be taken for the metal shell of the equipment;

⑦ The power supply system adopts grounding system correctly, and the working zero line and the protection zero line are separated;

Today, the leakage protection device must be checked regularly.

3. 1.5 Prevention and monitoring measures for fire and explosion accidents caused by inflammable and explosive dangerous goods:

(1) The distance between the welding and cutting operation point and dangerous goods such as oxygen bottles and acetylene bottles shall not be less than 10m, and the distance between the welding and cutting operation point and inflammable and explosive articles shall not be less than 30m.

(2) Various gases shall be stored in different categories, and the distance shall be more than 5 meters. Empty bottles and gas cylinders shall not be mixed.

3.2 Early warning actions

After receiving the alarm, the police should immediately report to the head of the headquarters, including the unit, time, place, nature, type, injured personnel, accident losses, emergency measures to be taken and the route to the scene. The headquarters started the emergency plan and informed the relevant professional groups to rush to the scene to carry out rescue.

3.3 Information Reporting and Disposal

3.3. 1 information reporting and notification

(1) Security personnel are on duty 24 hours a day. The duty room clearly indicates the contact person and telephone number of the emergency organization;

(2) When a sudden safety accident occurs, the relevant personnel at the scene of the accident immediately report to emergency headquarters;

(3) After receiving the alarm, the personnel on duty shall immediately report the danger to the superior.

message passing

The first person found at the scene of the accident → emergency headquarters office → part-time emergency rescue personnel → emergency organization for production safety accidents → relevant personnel and departments.

4. Emergency response

4. 1 response program

The emergency response process of this device includes alarm reception, emergency start-up, control and emergency action, extended emergency, emergency termination and post-event disposal.

4.2 Disposal measures

(1) After each sudden accident of the unit, the on-site emergency headquarters shall command and coordinate the emergency rescue work according to the accident situation, and notify the on-site personnel, departments and emergency rescue teams to rush to the accident site for emergency rescue work;

(2) Call and mobilize rescue forces. After receiving instructions from emergency headquarters, all teams and units immediately responded and dispatched accident rescue personnel, materials and equipment. Quickly arrive at the designated place to assemble and obey the arrangement of the on-site commander;

(3) According to the basic principles established in this plan and experts' suggestions, the field headquarters will quickly organize emergency rescue forces to carry out emergency rescue, and keep smooth communication with the teams and departments involved in emergency operations;

(4) When the existing emergency forces and resources on site can't meet the requirements of emergency action, report to the superior competent unit for support in time;

⑤ When the accident happens, the site must be protected, and the surrounding area of the dangerous area should be closed, and the wounded should be rescued, given first aid and property protected according to this plan. In case of special danger, the emergency command center will take emergency measures in time according to law on the basis of fully considering the opinions of experts and relevant parties;

4.3 Disposal of the accident site

4.3. 1 On-site disposal of electric shock accident

In case of electric shock injury accident, firstly, make the electric shock victim leave the power supply quickly (the method is to cut off the power switch and unplug the power cord from the electric shock victim with insulation or unplug the electric shock victim from the power supply), and secondly, move the electric shock victim to a place with good air circulation. In severe cases, artificial respiration and cardiac compression were performed on the spot and sent to a nearby hospital.

4.3.2 On-site disposal of falling from a height

Paramedics were escorted to the nearest hospital during the rescue.

4.3.3 Site Disposal of Collapse Accident

Once an accident occurs, the extrusion should be released as soon as possible. In the process of releasing extrusion, do not pull hard to avoid further injury, and deal with various injuries on the spot, such as cardiopulmonary resuscitation. At the same time, send it to the nearest hospital for rescue. In severe cases, the whole body may be buried, leading to suffocation and death. When giving first aid, you should first remove the dirt on your head, quickly remove the dirt on your nose and mouth, and keep your breathing smooth.

4.3.4 On-site Disposal of Mechanical Injury Accidents

① For some minor injuries, emergency personnel can simply stop bleeding, diminish inflammation and bandage;

(2) Escort the fractured person to the nearest hospital.

4.3.5 On-site Disposal of Food Poisoning Accidents

In case of food poisoning accident, stimulate the patient's throat to make him vomit, immediately send him to the hospital for emergency treatment, report to the local health and epidemic prevention department, and keep the remaining food for inspection.

4.3.6 On-site Disposal of Fire Accidents

(1) Cut off the power supply quickly. In order to avoid the aggravation of the situation, wear insulating gloves and use tools with insulated handles when cutting off the power supply. When the fire is far from the customs, cut the wires. The live wire and the zero wire should be cut off alternately and separately to avoid short circuit at the jaw and prevent the power cord from landing and causing short circuit and electric shock.

(2) When the power cord cannot be cut off in time for other reasons, on the one hand, send someone to connect the power terminal, and on the other hand, when putting out the fire, all parts of the human body should keep a certain enough distance from the charged body;

(3) When extinguishing electrical fires, use fire extinguishing agents with good insulation performance, such as dry powder fire extinguishers, carbon dioxide fire extinguishers, 12 1 1 fire extinguishers or dry sand. It is forbidden to use conductive fire extinguishing agent.

(4) During gas welding, when the oxygen hose is on fire, the hose shall not be bent or expired, and the oxygen valve shall be quickly closed to stop oxygen supply. When the acetylene hose is on fire, the torch fire should be turned off first, and the front hose can be bent to put out the fire;

Generally speaking, if there is a fire, put it out with a fire extinguisher first. If the situation is serious, call "1 19" immediately and explain the fire location, situation, informant and unit.

5. The state of emergency is over

After the emergency treatment, when the emergency rescue command center of the unit confirms that the termination conditions of the special plan are met, it can issue an emergency termination instruction. After an emergency, report the accident; Hand over the required relevant information and documents to the accident investigation and handling team; Write a summary report on accident emergency rescue work.

6. Post-processing

6. 1 After the accident is handled, the competent department shall write a report (summary): accident course, accident cause, handling process, experience and lessons, casualties, losses, direct losses, indirect economic losses, list of rewards and punishments personnel, etc. , and reported to the higher authorities, in the administrative department for the record.

6.2 After the accident investigation report is approved, the person responsible for the accident shall be dealt with according to the accident investigation report, and the accident prevention measures shall be actively implemented. Before restoring production order, it is necessary to deal with pollutants, repair necessary equipment and facilities, calm personnel's mood, and immediately carry out emergency rescue capability assessment and emergency plan revision.

Selected emergency plans for production safety in 2022 (II) I. General rules

L, all employees of our company must seriously study and implement the policy of safety in production, abide by the relevant national laws and regulations on safety in production, and conscientiously implement the provisions of the enterprise on safety in production and fire management to ensure the personal safety and physical and mental health of employees in the production process. Ensure the safety of state property and collective property.

2, do a good job in production safety and fire safety work must be based on prevention. Safety in production and fire safety must be talked about every year, every month and every day. Make all employees fully realize the importance of doing a good job in safety production and fire safety, and fully realize the importance of doing a good job in prevention, put an end to all kinds of accidents and nip them in the bud! Strengthen the education and training of workers' safety production, and form a good situation that everyone knows safety knowledge and everyone is in charge of safety.

3. In order to deal with all kinds of sudden major accidents, we must formulate practical spiritual principles and deal with these accidents in an orderly manner, so as not to be in a hurry and delay the fighters. Therefore, this book is specially formulated.

4. All employees of our company are required to be familiar with the specific requirements of this book, and everyone can command flexibly as required to properly handle all kinds of accidents.

Second, the general provisions

1. When a major accident occurs, the top leader (referring to the squad leader of the accident team and cadres above) is the on-site commander responsible for handling the accident.

2. The on-site commander-in-chief must be cool-headed, deal with things resolutely and decisively, and immediately organize employees to follow. Don't drag your feet and delay the best time for rescue.

3. On-site commander-in-chief should, based on the principle of "rescue first, then report", first organize on-site employees to carry out rescue work, and report to the enterprise leaders immediately after the situation is controlled.

4. In the case that the site situation is uncontrollable and the enterprise leaders cannot be contacted at the same time, the site commander-in-chief has the right to deal with all kinds of emergencies:

(1) In case of fire, you should immediately ask 1 19 for help.

(2) If you are alone and can't find a car at the moment, you should go to the 120 emergency center immediately.

5. In the event of an accident, all on-site employees should take an active part in the rescue work under the leadership of the on-site commander-in-chief, and never retreat, become deserters, or refuse to obey the leadership and delay the fighter plane. In the event of such incidents, corporate responsibility will be investigated and dealt with seriously.

Third, the fire accident emergency rescue plan

1. After a sudden fire accident, the monitor of the accident team shall immediately organize the employees of the team to put into fire fighting work, and shall not delay the fire fighting work for any reason.

2. After a sudden fire accident, the non-accident team operators should, depending on the severity of the fire at that time, send some personnel to assist in the fire fighting under the unified dispatch of the on-site fire fighting commander, or take emergency power-off measures, and the police station has personnel to assist in the fire fighting.

Four, personal injury accident emergency rescue plan

1, sudden major personal injury accident, team monitor and on-site operators should take decisive measures, immediately stop or power off, and quickly rescue the victims from mechanical equipment or electric shock parts.

2. If the victim loses a lot of blood, the on-site commander should immediately organize employees to temporarily bandage and stop bleeding.

3. If the victim's breathing and heartbeat stop, the victim should be immediately moved to an open area for artificial respiration and cardiac resuscitation, without delay for half a minute.

4. At this point, the on-site commander should race against time, make a decisive decision and urgently ask 120 emergency center for help.

5. The on-site commander shall report to the enterprise leaders in time.

6. When a general personal injury accident occurs, the on-site commander-in-chief should immediately report to the enterprise leaders, and find a car in time to send the victim to the hospital for treatment.

7. When dealing with personal injury accidents, on-site commanders should deal with them immediately on the principle of fast and steady, and don't delay time! Never delay the best opportunity to treat the victims! !

Five, equipment accident emergency rescue plan

1, sudden, the team leader should take prompt measures to stop power supply and prevent the accident from expanding.

2. If personal injury accidents occur due to equipment accidents, people should be saved immediately. After the victim is rescued, the procedure of Emergency Treatment and Rescue Plan for Personal Injury Accidents should be started immediately to deal with equipment accidents quickly.

3. After the accident, if it is not because of special circumstances such as saving people, try not to move all kinds of objects at the scene and protect the scene so as to analyze the cause of the accident.

4. If the "moving" and "supporting" measures are not taken quickly after the accident, which may lead to the expansion of the accident or personal safety crisis, the on-site commander can take these measures to deal with it. However, it is necessary to make detailed records and explain to the accident investigators in order to accurately determine the cause of the accident.

5. After a major equipment accident, the on-site commander shall immediately report to the enterprise leaders in case of emergency treatment.

Sixth, the composition of the system.

When an accident occurs, the implementation of the accident plan is completed by the system. The emergency rescue system is divided into two parts: the headquarters and the professional team. The commander-in-chief of the headquarters is the legal representative of the enterprise. Command members should include production, equipment, fire fighting and medical treatment in the factory, which have the ability, responsibility, power and resources to complete a certain task. The members of the headquarters directly lead the subordinate emergency professional teams and are responsible to the commander-in-chief, who coordinates the work of each team.

Telephone number of enterprise leaders:

General Manager: Chief Commander: Tel:

Deputy commander of the headquarters, telephone:

Command member:, telephone:.

Composition of professional team: composed of workshop supervisors. Professional team: once an accident happens, organize to rush to the scene and the front line to implement the emergency rescue plan.

It can be divided into communication groups according to tasks: to ensure the smooth broadcast communication between professional groups and the general dispatching room and headquarters; Instruct personnel to evacuate and save themselves by broadcasting.

Number of people: 5. Captain:

Membership list:

Equipment: walkie-talkie, telephone, mobile phone, tweeter, alarm.

Public security team: maintain public security in the factory area, and evacuate people and vehicles in a planned way according to the development trend of accidents.

Number of people: 4 people. Captain:

Membership list:

Equipment: walkie-talkie, telephone, mobile phone, tweeter, signs.

Emergency repair team: members of the team should be familiar with the accident site, equipment and technology, and repair the equipment under the premise of protective measures to prevent the accident from expanding, reduce the accident loss and curb the expansion of the hazard scope.

Number of people: 2. Captain:

Membership list:

Equipment: protective gloves, repair tools, etc.

Composition of professional team: composed of workshop supervisors. Professional team: once an accident happens, organize to rush to the scene of the accident and implement on-site and first-line emergency rescue plans.

Seven, this "major accident emergency rescue plan" is the basic principle of all employees in our enterprise to deal with sudden major accidents. All cadres and workers of the enterprise are required to follow this example and resolutely implement it. If there are amendments and supplementary opinions to this plan, they should be put forward to the enterprise leaders as soon as possible, so that the enterprise can revise this plan in time after summarizing the opinions.