Brief description of the block wall construction method
1. Block wall construction before the wall foundation treatment: the requirement of the substrate surface is flat, dry, mud-free, vertical, horizontal foundation, in the wall structure certification before construction. Walls need to be painted putty before construction in order to adhere to the block wall.
2. Wall block wall construction needs to be done at the same time as the unit inside and outside the window opening reservation, excavation of the equipment piping mouth, protruding corner of the lap and other work. Pay attention to accurately grasp the size of the hole and the direction of the entrance. The protruding corners should be cut.
3. The exterior of the wall requires the removal of the tower crane and its equipment, and the workers set up scaffolding, using brick walls and stones to put together tighter.
4. Block material stone cleaned up, find out the good side of the stone, heat treatment with LPG lamps to prevent water inside the stone, placed in the heat oh and then cleaned with paraffin wax.
5. Block wall construction sequence in turn: swing line - find the right center - positioning - reserve window and door openings - opening ink line - leveling the horizontal surface - find contour lines - paste brick wall stone.
6. After applying the cement mortar with thickness of about 2mm, put in the block stone or brick wall and leave appropriate gap. Place the block wall or stones flat on the cement mortar with each row of blocks placed horizontally.
7. After the wall internal and external holes are punched, the wall should be inspected, including whether the height and level of the wall are up to standard, and the thickness and verticality of the wall need to be opened.
8. External walls to make moisture-proof measures, internal walls to make decorative treatment.
Precautions:
1. Wall construction requirements for brick wall stone external surface flat, the brick should be joints tight, flush, the stone shall not have a large area of voids, bending, tooth missing and other defects.
2. Brick and stone need to remove dust and moisture in order to bond together with cement mortar. The quality of materials used for cement mortar and the strength grade of cement should meet the design requirements. Use naturally dry materials as much as possible during construction.
3. Determine the placement and deviation of bricks and stones to avoid top and bottom misplacement and misalignment. The upper limit of each row is not more than 3 deviated bricks.
4. Need to take moderate breaks at the right time during the construction process to avoid wall construction deviation due to the fatigue of the craftsmen. Need to pay attention to open windows and ventilation to ensure that the construction site in the personnel adequate supply of oxygen.
- Previous article:English Composition on Christmas with Translation
- Next article:The composition of hot pot is 400 words
- Related articles
- Recommendation of classic Chongqing nursery rhymes
- How does the legendary hero DeKay of Altman hold the sword?
- Xingyi Sunshine College Admissions Office Tel
- Indian food culture
- Top Ten Brainstorming Mobile Games
- Product Experience Report | "New" Dangdang and "Old" Empty Network
- Geography teaching plan of 8th grade in three northeastern provinces
- What are the good places to go in China?
- The day of the month of the Northeast Steamed Buns
- Which is better, pressed soybean oil or leached soybean oil?