Traditional Culture Encyclopedia - Traditional festivals - General test flow
General test flow
Demand analysis stage
Analyze business requirements.
Test planning stage
Write a test plan, including personnel, software and hardware resources, test points, integration sequence, progress and risk identification.
Test design stage
Design the test plan, including the introduction of demand points, test ideas and detailed test methods. Need to review the test plan.
Test planning stage
Design test cases and processes, and write test cases, including test items, use case levels, preset conditions, operation steps, expected results, etc. Test cases need to be reviewed.
Test execution stage
Execute test cases and submit quality defects, test daily reports, test reports and other relevant documents in time.
- Previous article:How to make popcorn with air fryer
- Next article:Traditional manufacturing big data
- Related articles
- Excerpts from the story of the Cowherd and the Weaver Girl (1)
- What is concurrently fragrant liquor?
- What is UI user interface design?
- Manufacturing process of canned sugar-coated haws
- Speech by the host of Double Ninth Festival
- Clothing characteristics of snowflake pants
- How to practice internal energy in Mantis Fist?
- Fried biscuits are a common practice. How to make authentic fried biscuits?
- What are the applications of fermentation engineering in human production and life?
- In the past, women liked to pin a silver hairpin on their hair bun. What was the original function of the hairpin?