Bathroom waterproofing the correct construction method

Bathroom waterproofing the correct method is as follows:

1, to ensure that the grass-roots level of the ground and clean, and then waterproofing coatings will be smeared to every corner.

2, wait for the first dry, start painting the second waterproof coating.

3, waterproof layer curing, in the waterproof coating surface covered with a layer of protective layer, covering the waterproof layer.

4, after the end of maintenance, do a water closure test, to ensure that later will not appear seepage phenomenon.

Bathroom waterproofing precautions

1, bathroom waterproofing, first to ensure that the ground is neat, flat, there will not be the presence of some impurities. If the ground is uneven, you need to repair, if there is uneven place, must be fixed before construction, so as to play a better effect, not because of some waterproofing materials applied unevenly, which may lead to waterproof layer puncture, there is also a leakage phenomenon.

2, the bathroom is the focus of the project is waterproof to do a good job, bathroom corners, as well as its ground at the joints, etc., these positions are more difficult to paint, the probability of problems is also relatively large, not only in these places to brush waterproofing materials, but also coated evenly. Be sure to deal with it, so as to prevent leaks.

3, bathroom wall waterproofing can not be too bad, and waterproof height is also to do about 30cm, this is also to prevent the accumulation of water through to the wall. If there is a bathtub installed in the toilet, then the waterproofing of the wall around it should be more than 180cm high.