Air conditioning installation safety protocol

In the real world, many occasions are inseparable from the agreement, and signing the agreement can make the result of the transaction more perfect. How will we draft the agreement? The following are eight safety protocols for air conditioning installation that I have carefully compiled. Welcome to read the collection.

Article 1 of the air-conditioning installation safety agreement 1, before the project starts, it is necessary to determine the layout position, tiling, mosaic and texture layout with the designer.

2, after the material comes into play, to count the number, check for damage and quality problems, if you have any questions, you should contact the company in time. You are not allowed to take the on-site materials without permission. Once found, compensation will be tripled.

3. Bricks should be selected before paving. If there is a waistline, it is necessary to determine the height of the arrangement. Ceramic tiles must meet the vertical and horizontal requirements, without color difference, empty drum and cracked bricks. If drainage is required, the slope must be 0.5%- 1%. If there is accumulated water that needs to be reworked, all materials and labor costs for rework shall be borne by itself.

4. When the tiles are stuck to half, check whether the number of tiles is enough in time, and notify the project leader in time if it is not enough. Keep the site clean and tidy every day, and regularly transport the garbage to the designated garbage dump downstairs.

5. Don't charge customers. Any change, size change, addition or deletion of drawings must be approved by our company before construction. Without permission, all consequences shall be borne by our company.

6. Handle carefully during construction, do not damage other finished products, and always pay attention to construction safety, and be responsible for any industrial accidents.

7, in strict accordance with the provisions of the "construction plan" time limit for a project is completed, delay 1 day fine 50 yuan.

8. The company will withhold 5% of the project deposit. During the warranty period of 1 year, any quality problems must be dealt with on site in time. If there is any delay or delay, the project deposit will not be refunded.

The above rules are not fully recorded, and strict self-discipline is expected. If there is no liability accident in the whole year and it can be completed on time or ahead of schedule, the company will reward it at the end of the year.

Project name:

Signature of person in charge: date

Air conditioning installation safety agreement Chapter II Dear owners and friends:

In order to standardize and unify the air-conditioning installation in residential areas and prevent personal injury and property loss accidents caused by improper air-conditioning installation, the service center reminds you of the following matters:

1. Entrust personnel qualified for aerial work to install air conditioners;

2. Safety protection measures should be taken when installing air conditioners, including but not limited to wearing safety ropes, safety helmets and rubber shoes;

3. Place the outdoor air conditioner in the location designated by the property service center;

4, air conditioning installation must be fixed outdoor machine and air conditioning shutters;

5. The air conditioning drain pipe must be connected with the special condensate drain pipe;

6, need to change the location of air conditioning holes must submit an application to the property center, through the examination and approval process before construction;

7. In the process of construction and installation, the facade of the main building shall not be damaged.

In addition to the above matters, the installation of air conditioners should also meet the safety and quality requirements of all other air conditioners.

I have read the above tips and promise to install the air conditioner according to the above requirements, and I will be responsible for the personal and property losses caused by improper installation of the air conditioner.

Owner of the building: air conditioner installer: MM DD YY.

This dunning is made in duplicate, one for the owner and one for the service center.

Air conditioning installation safety protocol

Party a: XX

Party b: XX

In order to ensure the safety of air conditioning installation project, this agreement is signed by both parties through consultation.

Rule number one. Party A's Safety Responsibility

Before Party B installs the air conditioner, Party A shall give oral safety education to the person in charge of Party B's site, and the person in charge of Party A's site safety shall (after oral education. Party A has no relevant safety responsibilities), and the main content of its education is the safety precautions related to installation.

Article 2. Party B's Safety Responsibility

1. Party B shall be responsible for any accident caused by falling objects during installation.

2. In the later period (within 6 years), Party B shall bear all the responsibilities for the accidents caused by the falling of foreign equipment.

3. Party B shall provide machinery, equipment, tools and materials required for air conditioning installation, and shall be responsible for providing safety belts and other labor protection articles for installers.

4. Party B is responsible for educating the installers on safety and public security, installing in strict accordance with relevant national safety operation regulations, and taking safety measures to ensure safe and civilized construction.

5. Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..

6. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has carried out the construction without authorization, and the consequences will be borne by itself.

7. Party B shall be legally employed with complete relevant certificates. If Party B employs illegally, Party B shall bear the losses.

8. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

9. Party B shall do a good job in the protection of finished products and shall not pollute the original decoration, equipment and facilities; Otherwise, Party B shall clean up, restore to the original state or make compensation until Party A is satisfied ... The losses caused by poor protection of finished products shall be borne by Party B. ..

10. Party B shall do a good job in labor protection. Party B shall fasten the safety belt and hang it in a reliable place when working on the external wall, near the edge or at high altitude. It is forbidden to hang high and use low. It is forbidden to install air conditioners without wearing seat belts.

1 1. Party B shall protect the buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, so as not to hurt others, otherwise the losses caused shall be borne by Party B. ..

12. The waste residue, waste liquid and waste materials generated by Party B during the installation process are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time to achieve clean and civilized construction.

13. Party B shall abide by the law and shall not steal, otherwise it will be punished. Article 3 This Agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties, with the same legal effect.

Party A (signature):

Address: XX

Authorized Agent: XX

Tel: XXXXXX

Date: XXXX, xx, xx, xx, xx.

Party B (signature): XX

Address: XXXXXX

Authorized Agent: XX

Tel: XXXXXX

Date: XXXX, xx, xx, xx, xx.

Air conditioning installation safety protocol

Central air conditioning system installation protocol

Party A: Xuancheng Baihui Real Estate Co., Ltd.

Party B: Hebei Kang Ming Electromechanical Equipment Co., Ltd.

Through friendly negotiation between Party A and Party B, the following agreement is reached on the installation of air conditioning project in Xuancheng Baihui Commercial Logistics Park Phase I:

1. Party A entrusts the air-conditioning installation project of Zone A (centrifuge part of the Grand Hall) of the first phase air-conditioning project of Xuancheng Baihui Commercial Logistics Park to Party B, and Party B will provide high-quality and fast installation services for the air-conditioning project.

Two. Responsibilities and obligations of Party A and Party B

The first party

1. Cooperate with Party B, the supervision unit and the general contractor to ensure the smooth construction and timely completion;

2. Cooperate with Party B to provide water, electricity and materials needed for the project construction in place;

3. Guide and supervise the relevant technical links in the construction process, and notify Party B in time if there is any scheme change;

4. Pay the project cost to Party B in time according to this agreement;

5. Abide by other relevant provisions of this Agreement,

party B

1, organize the construction team and construction equipment to enter the site on schedule, closely cooperate with Party A in the construction of the project to do a good job in total quality management related to this type of work, abide by various systems on site, and maintain the overall image of the company;

2. Make a reasonable material mobilization plan, actively cooperate with on-site material procurement, properly classify and keep mobilization equipment and materials, and make detailed written records on the use of phased materials;

3. Collect and save the operating instructions and relevant inspection data of air conditioning equipment and main materials;

4. Use and save installation materials reasonably, and put an end to waste and loss. Material losses caused by intentional damage and mismanagement shall be borne by Party B;

5, fire prevention, theft prevention, civilized construction, strengthen safety management and bear the costs caused by bad safety measures;

6, engineering installation in strict accordance with the relevant national standards, to ensure the quality of the project;

7. Effectively control the construction progress, report the progress of the project regularly, and ensure that the project is completed on schedule. Party B shall take full responsibility for the losses caused by the delay of the construction period due to Party B's own reasons;

8. Cooperate with equipment manufacturers in debugging, data recording and data collection of air conditioning systems;

9. Party B responds to Party A's promise to the owner about the quality guarantee period of the installation project.

Third, the project construction scope and time limit for a project requirements

The construction scope of this project is: installation of air-conditioning water system (terminal air cabinet, air-conditioning water pipeline, main engine room and system electricity) in the area covered by centrifugal refrigeration unit, that is, all the installation of air-conditioning water system in the first to fourth floors of shopping mall and basement air-conditioning room including shaft and cooling tower. And the manufacture and installation of air systems.

The installation period of this project is 80 days, counting from the date of receiving the installation notice from Party A (that is, the water system at the end of the business area of Daguan has been tested, cleaned, insulated and distributed). The installation progress of the computer room has completed more than 80% of the total workload. The installation of control box and host of terminal air cabinet shall be coordinated with the decoration unit to determine the date)

If the construction period is delayed due to Party B's reasons, Party A shall pay RMB 5,000.00 as liquidated damages for each day of delay, and the delay time shall be 30 days. Party A has the right to terminate the contract unilaterally and will not bear the losses caused to Party B. Party A requires Party B to bear a penalty of RMB 500,000 after the termination of the contract.

Iv. Installation fee and payment method

1. The installation fee of this project is the lump sum price for manual cleaning, and it is not included in other expenses during construction. The total installation fee is RMB (in figures) 78 yuan. 480 thousand yuan. (in words: seven hundred and eighty-four thousand eight hundred yuan only), of which 540,000 yuan is in Daguan Area A; 244,800 in Zone B of the Grand Pavilion.

2. Payment of installation fee:

(1) The installation of auxiliary materials, water pipes, thermal insulation materials and other related auxiliary materials shall be carried out according to the air conditioning drawings. After the indoor air conditioner arrives at the site, Party A shall pay 30% of the total installation fee to Party B..

(2) After the installation and debugging are completed and accepted by Party A, Party A shall pay Party B the installation labor cost to 92% of the total installation cost of this project, that is, 72%. 20xx ten thousand yuan (including Area A 49). 680,000 yuan; Section 22 B. 52 1.6 million yuan);

(3) 5% of the final payment * * * shall be used as the installation quality deposit, which shall be paid within two years after the end of the warranty period.

(4) 3% of the installation fee is the total package cooperation fee.

Verb (abbreviation of verb) What both parties need to supplement.

6. This agreement is made in triplicate, one for Party A and Party B respectively, and one for the record of the equipment supplier, which shall come into effect as of the date of signing. This agreement, as an annex to the Purchase and Installation Contract of Central Air Conditioning System Equipment in Zone A and Zone B of Xuancheng Baihui Commercial Logistics Park Phase I, shall abide by the provisions of the main contract. In case of any inconsistency, this agreement shall prevail and have the same legal effect.

Signature of Party A (representative): XX

XXXX,XXXX,XX,XX

Signature of Party B (representative): XX

XXXX,XXXX,XX,XX

Air-conditioning installation safety agreement Article 3 In order to ensure the safety of air-conditioning installation works, both parties agree to perform the following responsibilities and obligations through consultation.

Article 1 Party A's Safety Responsibility

Before Party B installs the air conditioner, Party A shall give oral safety education to the person in charge of Party B's site, and the person in charge of Party A's site safety shall be Party B (after oral education. Party A has no relevant safety responsibilities), and the main content of its education is the safety precautions related to installation.

Article 2 Party B's Safety Responsibility

1. Party B shall be responsible for any accident caused by falling objects during installation.

2. Party B shall take full responsibility for the accidents caused by the falling of external equipment during and after installation.

3. Party B shall provide machinery, equipment, tools and materials required for air conditioning installation, and shall be responsible for providing safety belts and other labor protection articles for installers.

4. Party B shall be responsible for the safety and public security education of the installers, carry out the installation in strict accordance with the relevant national safety operation regulations, and take safety measures to achieve safe and civilized construction.

5. Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..

6. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has constructed without authorization, and the consequences will be borne by itself.

7. Party B shall be legally employed with complete relevant certificates. If Party B employs illegally, Party B shall bear the losses.

8. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

9. Party B shall do a good job in the protection of finished products and shall not pollute the original decoration, equipment and facilities; Otherwise, Party B shall clean up, restore to the original state or make compensation until Party A is satisfied ... The losses caused by poor protection of finished products shall be borne by Party B. ..

10. Party B shall do a good job in labor protection. Party B shall fasten the safety belt and hang it in a reliable place when working on the external wall, near the edge or at high altitude. It is forbidden to hang high and use low. It is forbidden to install air conditioners without wearing seat belts.

1 1. Party B shall protect buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..

12. The waste residue, waste liquid and waste generated by Party B during the installation process are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time to achieve clean and civilized construction.

13. Party B shall abide by the law and shall not steal, otherwise it will be punished.

Article 3 Precautions for Party A's Installation

1. Prevent freon leakage when installing air conditioner. After the air conditioner is installed, the installer must check whether there is leakage at the air conditioner connection port to prevent freon leakage.

2. Prevent rainwater from flowing backwards into the room through the hole in the wall. During the installation of air conditioner, a slightly higher hole through the wall must be made indoors. After the installation is completed, the gap in the wall hole must be plugged with putty. If you use the drainage holes in the corridor, you should also pay attention to similar problems.

3. The outdoor unit of air conditioner can't be installed everywhere, so the location should be selected for future maintenance. The outdoor unit (compressor) must be installed correctly, and the installer must level it with a level. The outdoor unit bracket should be equipped with expansion bolts, and the high-rise installation must be fixed through the wall with long screws, which must be sufficient. Beware that workers omit several expansion bolts for the convenience of construction, which will cause a lot of trouble in the future.

Air conditioning installation safety agreement Article 4 Party A: ID card:

Party B: ID card:

In order to strengthen the management of decoration personnel, Party A and Party B have reached the following terms through consultation:

1. Party B is responsible for educating the decoration workers on safety construction, supervising the construction safety operation procedures, and taking necessary safety protection measures according to regulations.

2. Party B shall be responsible for repairing the pipeline blockage, water leakage and other accidents caused by decoration construction. If other economic property losses and casualties are caused, Party B shall bear all economic and other responsibilities.

3. This agreement is made in duplicate, each party holds one copy, which shall come into effect as of the date of signature and have legal effect. I hope all workers can work safely and ensure the safety of others and themselves.

Party A:

Party B:

date month year

Air-conditioning installation safety agreement Chapter V Party A:

Party B:

In order to ensure the safety of air conditioning installation project, this agreement is signed by both parties through consultation.

Article 1 Party A's Safety Responsibility

Before Party B installs the air conditioner, Party A shall give oral safety education to the person in charge of Party B's site, and the person in charge of Party A's site safety shall (after oral education. Party A has no relevant safety responsibilities), and the main content of its education is the safety precautions related to installation.

Article 2 Party B's Safety Responsibility

1. Party B shall be responsible for any accident caused by falling objects during installation.

2. In case of accidents caused by the falling of foreign equipment (within 6 years), Party B shall take full responsibility.

3. Party B shall provide machinery, equipment, tools and materials required for air conditioning installation, and shall be responsible for providing safety belts and other labor protection articles for installers.

4. Party B shall be responsible for the safety and public security education of the installers, carry out the installation in strict accordance with the relevant national safety operation regulations, and take safety measures to achieve safe and civilized construction.

5. Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..

6. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has constructed without authorization, and the consequences will be borne by itself.

7. Party B shall be legally employed with complete relevant certificates. If Party B employs illegally, Party B shall bear the losses.

8. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

9. Party B shall do a good job in the protection of finished products and shall not pollute the original decoration, equipment and facilities; Otherwise, Party B shall clean up, restore to the original state or make compensation until Party A is satisfied ... The losses caused by poor protection of finished products shall be borne by Party B. ..

10. Party B shall do a good job in labor protection. Party B shall fasten the safety belt and hang it in a reliable place when working on the external wall, near the edge or at high altitude. It is forbidden to hang high and use low. It is forbidden to install air conditioners without wearing seat belts.

1 1. Party B shall protect buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..

12. The waste residue, waste liquid and waste generated by Party B during the installation process are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time to achieve clean and civilized construction.

13. Party B shall abide by the law and shall not steal, otherwise it will be punished.

Article 3 This Agreement is made in duplicate.

Party A and Party B each hold one copy, which shall come into effect after being signed and sealed by both parties and have the same legal effect.

Party A (signature): Party B (signature):

Address: Address:

Authorized Agent: Authorized Agent:

Tel: Tel:

Date: Year Month Day Date: Year Month Day

Air-conditioning Installation Safety Agreement Chapter VI Party A: XX

Party B: Beijing Limited

In order to do a good job in the safety of air-conditioning installation project, this agreement is signed by both parties through consultation.

Rule number one. The agreement is as follows

Annex to the contract (ContractNo.:).

Article 2. Party A's Safety Responsibility

Party A shall give oral safety education to the person in charge of Party B's site before Party B installs the air conditioner. The person in charge of site safety of Party A is

The main content of education is the safety precautions related to installation.

Article 3. Party B's Safety Responsibility

1. Party B shall provide machinery, equipment, tools and materials required for air conditioning installation, and shall be responsible for providing labor protection articles such as safety belts, safety helmets and masks for installers.

2. Party B is responsible for educating the installers about safety and public order, installing in strict accordance with the relevant national and Beijing safety operation regulations, and taking safety measures to achieve safe and civilized construction.

3. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has carried out the construction without authorization, and the consequences will be borne by itself.

4. Party B shall be legally employed with complete relevant certificates. If Party B employs illegally, Party B shall bear the losses.

5. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

6. Party B shall do a good job in the protection of finished products, and shall not pollute or damage the original decoration, equipment and facilities, otherwise it shall clean up, restore to the original state or compensate to the satisfaction of Party A.. The losses caused by poor protection of finished products shall be borne by Party B. After the installation is completed, the infrastructure department will arrange professional engineers to check the restoration of the original facilities. If the requirements of Party A cannot be met, the deduction will be made according to the actual situation.

7. Party B shall do a good job in labor protection. Party B shall fasten the safety belt and hang it in a reliable place when working on the external wall, near the edge or at high altitude. It is forbidden to hang high and use low. It is forbidden to install air conditioners without wearing seat belts.

8. Party B shall ensure that there are no casualties and fire accidents. All losses and responsibilities caused by fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents.

Any appointment shall be undertaken by Party B and has nothing to do with Party A. ..

9. Party B shall protect the buildings, pipelines and indoor articles, and do a good job in safety warning equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..

10. The waste residue, waste liquid and waste generated by Party B during the installation process are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time, so as to clean up the site after the work.

1 1. Party B is forbidden to smoke after entering the gate of Party A's unit, and each person will be fined 500 yuan.

12. Party B shall abide by the law and shall not steal, otherwise it will be punished.

Article 4. This agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties, with the same legal effect.

Party A (seal): XX

Party B (seal): Beijing Co., Ltd.

Address: XXXXXXXXXX

Address: XXXXXXXXXX

Legal representative or entrusted agent:

Legal representative or entrusted agent:

Tel: XXXXXX

Tel: XXXXXX

Date: June 3rd, 20xx

Date: June 3rd, 20xx

Article 7 Safety Agreement for Air Conditioning Installation Party A: Xikong 18 Neighborhood Project Department of Shaanxi Shi Ye Construction Co., Ltd. Party B:

In order to ensure the safety of installation of air conditioning protective fence in Building 3 of Xikong 18th Street shantytown renovation project, both parties agree to sign this agreement through consultation.

Article 1: Party A's safety responsibility

Before Party B installs the air-conditioning guardrail, Party A shall give oral safety education to the person in charge of Party B's site and construction personnel. The person in charge of Party A's on-site safety is Zhou Kai (after oral education, Party A has no relevant safety responsibilities), and the main content of the education is "Safety precautions related to the installation of air-conditioning guardrail".

Article 2: Party B's Safety Responsibility

1. Party B shall be responsible for any accident caused by falling objects during installation.

2. Party B shall provide the machinery, equipment, tools and materials needed for installing the air-conditioning guardrail, and shall be responsible for providing safety belts and other labor protection articles for the installers.

3. Party B is responsible for educating the installers about safety and public order, installing in strict accordance with relevant national safety operation regulations, and taking safety measures to achieve safe and civilized construction.

4. Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..

5. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has carried out construction without authorization at its own risk.

6. Party B shall be legally employed with complete relevant certificates. If Party B employs illegally, Party B shall bear the losses.

7. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

8. Party B shall do a good job in the protection of finished products, and shall not pollute the original decoration, equipment and facilities, otherwise it shall clean up, restore to the original state or compensate until Party A is qualified. The losses caused by poor protection of finished products shall be borne by Party B. ..

9. Party B shall do a good job in labor protection. Party B shall fasten the safety belt and hang it in a reliable place when working on the external wall, near the edge or at high altitude. It is forbidden to hang high and use low. It is forbidden to install guardrails without wearing seat belts.

10. Party B shall protect buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..

1 1. The waste residue, waste liquid and waste materials generated by Party B during the installation process are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time to achieve clean and civilized construction.

12. Party B shall abide by the law and shall not steal, otherwise it will be punished.

Article 3 This Agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties, with the same legal effect.

Party A (signature): Party B (signature):

Authorized Agent: Authorized Agent:

Tel: Tel:

Date: Year Month Day Date: Year Month Day

8 1 air conditioning installation safety agreement. Before the project starts, it is necessary to determine the position of lamps, sockets and sanitary ware with the designer and accurately calculate the materials used.

2, after the material comes into play, to count the number, check for damage and quality problems, and protect yourself, stored in a safe place. You are not allowed to take the on-site materials without permission. Once found, compensation will be tripled.

3, in the case of construction without destroying the structure, if you need to play load-bearing beams and columns, you must reflect the situation in time, and you are not allowed to construct on your own. Line pipe into the wall not less than 5mm, slotting must use a cutting machine, concealed pipe, cassette buried firmly, cassette and surface must be straight and consistent. Water pipes entering the wall should be sealed after testing and pressing. If rework is caused by water leakage, the person in charge of construction shall be responsible for all reworked materials and labor.

4. Install sanitary ware with a spirit level. If the sanitary ware is not level, it will be reworked, and all the materials and labor costs for rework will be borne by yourself. Installation tools should be put away centrally, not on furniture, marble countertops and floor tiles. If the tool is misplaced and the finished product is damaged, compensation shall be investigated.

5, to actively cooperate with other types of work, can't delay affect other construction progress. Always pay attention to construction safety and be responsible for any work-related accidents. Keep the site clean and tidy every day, and regularly transport the garbage to the designated garbage dump downstairs.

6. Do not charge any fees to customers. If drawings change, dimensions change, or items are added or reduced, construction can only be carried out with the consent of the company. If the construction is carried out without authorization, all consequences will be borne by yourself.

7, in strict accordance with the provisions of the "construction plan" time limit for a project is completed, delay 1 day fine 50 yuan.

8. The company will withhold 5% of the project quality deposit. During the warranty period of 1 year, any quality problems must be dealt with on site in time. If there is any delay or delay, the project quality deposit will not be refunded.

The above rules are not fully recorded, and strict self-discipline is expected. If there is no liability accident in the whole year and it can be completed on time or ahead of schedule, the company will reward it at the end of the year.

Project name:

Signature of person in charge: date