Traditional Culture Encyclopedia - Traditional festivals - Construction organization design scheme of a decoration project?
Construction organization design scheme of a decoration project?
Section 1 Site Organization Chart
Section 2 Construction Deployment
In order to ensure that the decoration project is organized and deployed in the construction process, so that the decoration project can be carried out in an orderly manner from beginning to end, we will set up an engineering project department to be responsible for the comprehensive management of the construction technology, quality, progress, safety, materials and civilization of this project. Company leaders and technicians are responsible for unified command, directly assisting the project department to coordinate all construction links in the process of decoration engineering construction, reasonably arranging the construction flow section, and coordinating the construction of various disciplines and sub-disciplines.
According to the characteristics of this project, during the renovation, other construction units cannot be affected. So the faster the construction, the better. In the process of construction, dust pollution and noise should be minimized as far as possible. At present, the construction deployment is as follows:
Segmented flow construction (1) surface.
(2) Overpass construction: In each flow rhythm, several areas are constructed at the same time, forming a mode of plane flow, overpass, synchronous operation and step-by-step advancement.
Section 3 Construction Organization
1) Main functions:
Once this decoration project wins the bid, our company will set up a decoration project management department. Appoint a first-class project manager with rich on-site leadership and management experience as the project manager (project leader) of this project, and provide a strong project management team such as technical director, project quality engineer, project safety officer, material engineer and equipment manager. As the functional organization of this project, the Project Management Department, under the leadership of the Project Manager, is fully responsible for the construction management, production command and scheduling, technical quality and safety of the whole process from commencement to completion of this project. It is the authorized agent of our company in this decoration project, and has the functions of management and service to the operation layer, so as to ensure that the quality and construction period of this project meet the requirements of the owner.
① Project Manager
Implement lifelong quality responsibility system and safety production leadership responsibility system for the project of this project department, and be directly responsible for the contract; Carry out the company's quality policy, organize the implementation and implementation of the company's quality system documents in the project department, assign quality management objectives, and be responsible for the completion of project quality indicators; Organize the balanced construction and process management of the project, rationally allocate various resources, and take full responsibility for the quality, progress, cost, safety and civilized construction of the project; Responsible for the implementation and implementation of corrective and preventive measures formulated by the company and its branches in this project department; Organize all kinds of original records and statistics of production process to ensure the integrity, accuracy and traceability of all kinds of original data; Participate in project return visit and be responsible for project maintenance; Organize the quality education of the staff of this project department and actively carry out various quality activities.
② Project builder
Assist the project manager to sign contracts with customers to achieve the project quality objectives; Responsible for the organization and implementation of the company's quality system documents on the project; Participate in the preparation of construction organization design, optimize construction scheme, be responsible for implementing various technical saving measures and provide technical saving measures plan; Responsible for technical disclosure to professional foreman, and organize construction according to disclosure requirements; Responsible for the preparation and revision of the construction plan for special process, and organize special personnel to continuously track, supervise and record the implementation of the construction plan during the construction process; Organize relevant personnel of this project department to review drawings and submit written drawings review opinions; Be responsible for the summary evaluation of the quality records of this project; Prepare various construction progress plans and semi-finished products processing plans; Participate in the report, investigation and disposal of nonconforming products.
③ Project documenter
Strictly implement the document and data control procedures, control the documents and data under the jurisdiction of this department, and ensure that the documents used in relevant places are valid versions; Responsible for receiving, classifying, numbering, registering, distributing, filing and keeping the documents of the department, handling the formalities of sending and receiving documents in time, identifying the controlled documents in time and forming a list; Responsible for the timely recovery and submission of invalid documents after changing or changing editions, to ensure that invalid documents are not used in all relevant workplaces; Supervise the document holders of this department not to borrow documents from others at will, not to copy documents at will, and regularly check the use of controlled documents; Strengthen the management of file lending, and handle the file lending formalities with the borrower in time; Strictly abide by the confidentiality system, and do not lend or transfer documents to others without approval; Be responsible for the identification, collection, cataloging and storage of the quality records of this project, so as to be timely, complete, accurate and clear; Compile the construction scheme related to the project, as well as the written disclosure of technology, quality and safety; Organize and participate in QC activities, and complete the results report of QC activities: according to the construction progress, fill in the commencement report, concealed engineering acceptance record, process inspection list, project quality common fault pre-control list, sub-project inspection record and sub-project evaluation data in time, and complete the daily construction log; Collect the certificates and quality certificates of raw materials, finished products and semi-finished products in time.
④ Accounting
Correctly grasp the relevant professional budget quota, and conscientiously implement the relevant national, provincial and municipal engineering cost policies and decrees; Issue and accept the construction task list, check and issue the workload according to the quality of the team, strictly control the employment, provide manual analysis forms, distribute wages and bonuses, subcontract accounts payable and establish ledgers; Responsible for the preparation of monthly project progress inspection report, cost report and ledger, correctly and timely calculate the actual cost of the project, calculate the cost overrun, investigate the reasons for the overrun, and put forward suggestions and methods for corrective measures to be taken; Carry out cost forecast, put forward project cost forecast report regularly according to the requirements of project manager, monitor the change of project cost, and report the main factors affecting cost to project manager in time; Collect and sort out the economic data of each stage in the construction process, and make the final accounts of the project in time.
⑤ Project Material Officer
According to the contract, project budget and construction progress, responsible for the preparation of material data plan; Be responsible for the verification and inspection of incoming materials, and collect relevant technical documents in time; Responsible for on-site material stacking and identification management; Report the unqualified materials to the leaders of the competent department in time, and the materials to be inspected should be clearly marked to prevent confusion, and be responsible for submitting the application for emergency release of materials, making clear marks and making records; Earnestly do a good job in material consumption subsidiary ledger and monthly subsidiary ledger of unit engineering materials and components, strictly adhere to the principle of "first in, first out", make a good record of recipients, ensure that accounts, cards and materials are consistent, and conduct physical inventory and inventory work on a regular basis; Keep the marks and related records of various substances properly, fill in the material tracking form in time, and keep the traceability of substances; Supervise the team to do as you do, do it every day, clear the materials after work, and create a civilized scene; For the storage of materials with environmental requirements, we should be familiar with the performance of materials and create necessary conditions to prevent losses caused by improper storage.
⑥ Project equipment personnel
According to the construction organization design (quality plan), prepare and fill in the equipment use allocation form in time; Meet the safety conditions to ensure that the equipment enters (exits) the site, participate in the installation, debugging, test and acceptance of the equipment entering the site, urge the mechanical operators to abide by the safety technical operation procedures, fill in all kinds of original records and materials in time, and do a good job in collecting and reporting; Supervise the machine operators to work with certificates and technical business training; Responsible for the civilized construction, daily maintenance and safe use of electricity of on-site mechanical equipment.
⑦ Project quality director
Strictly implement the company's quality policy and objectives, actively assist the project manager and project builder to do a good job in project quality management, and ensure the realization of quality objectives; Participate in the inspection and review of engineering elevation and size; Be responsible for the inspection and visa of subdivisional work, participate in the inspection and evaluation of subdivisional work, and strictly implement the stipulation that unqualified items shall not be transferred to the next working procedure. Conduct a comprehensive inspection and tracking of the project quality, and notify the project department for rectification in time when quality defects are found, and follow up the inspection. Assist the project material engineer to mark the inspection and test status; Assist the project department to deal with the minor nonconformities found in the construction process in time, and report the general or serious nonconformities in time; Have the right to veto or issue a quality rectification notice for unqualified processes or materials; Participate in the project quality meeting held by the project department and keep a quality diary every day; Participate in the analysis and treatment of engineering quality accidents.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Related articles
- Can you introduce the relevant rules of F 1?
- What are the themes of poster design? What are the poster design ideas for Chinese New Year?
- Wuhan Hanyang District Moving Company Tel
- What do you mean by the characteristics of crosstalk?
- What are the traditional festivals in Guizhou?
- Sketch landscape painting course
- What are the main problems existing in China's economic development road
- Civilization 5 French tradition or autonomy
- What's delicious in Shilong?
- What are the cultural characteristics of foreign countries?