Carpentry process and construction process
I, construction content
Wooden doors (casement and sliding doors)
Two, the construction process
1, casement installation procedures: determine the installation position - pop-up installation position line - the door and window frames in place - temporary Temporary fixing - with a line drop - the door frame correction - fixed doors and windows - pre-embedded in the wall - the door and window fan hanging on the frame - according to the size of the doorway after the planing and repair of the hinge groove -Position should be accurate - installation fit.
2, hanging sliding wooden door installation procedures: determine the installation position → fixed door at the top → side frame plate fixed → hanging pieces set on the I-beam slide → I-beam slide fixed → fixed lower rail → loaded into the door on the top of the head of the special hole → the door down the rail pads flat → hanging bolts and hangers are fixed → checking the door edge and the side frame plate coincide with the door → fix the door → installation of the face.
3, the lower bearing sliding window installation procedures: determine the installation position → lower frame plate fixed → side frame plate fixed → upper frame plate fixed → pick repair and steel thickness of the wood groove → steel slide groove glued to the wood groove → special wheel box glued to the lower end of the window sash in the reserved holes → window sash mounted on the track → check the window edge and the side frame plate gap → adjust → install the veneer.
Three, the construction process
1, in the construction of wooden doors and windows set, first of all, should be in the grass-roots level within the wall holes, under the wooden mold. Wooden mold up and down spacing is less than 300 mm, each row spacing is less than 150 mm.
2, and then according to the design of windows and doors paste face width and doorway width saw cut large core board, with round nails fixed in the wall and door opening, round nails to be nailed to the wooden mold. After checking the bottom matting firmly and safely, you can do fire retardant coating treatment.
3, door and window sets of veneer should be selected pattern pattern beautiful, flat surface plywood, plywood species should meet the design requirements.
4, cut the panel, should be first according to the width of the door opening and face pop-up cutting line, cut with a sharp knife, 45 ° angle planing at the seam, the back of the latex liquid brush pasted on the substrate, the surface with a nail gun nailed into the non-cap nails to reinforce the straight.
5, door openings and wall interface joints require straight, 45 ° angle to the seam. Decorative panels pasted and installed with wood corner line sealing edge, corner line horizontal and vertical interface planing 45 ° angle joints.
Four, wooden curtain box construction process
1, construction content
Curtain box has two forms:
One is the room has a ceiling, curtain box should be hidden in the ceiling, in the top of the ceiling together with the completion.
The other is the room is not ceiling, curtain box fixed on the wall, and the window frame set to become a whole.
2, construction points
1, curtain box specifications for the height of about 100 millimeters, single-rod width of 120 millimeters, double-rod width of 150 millimeters or more, the length of the shortest length should be more than the width of the window of 300 millimeters, the window on both sides of the 150 millimeters beyond the longest length with the wall.
2, the production of curtain boxes using large-core board, such as the finish for the varnish painting, should be done with the window frame set of the same material veneer paste, paste the surface for the outer side of the curtain box and the bottom surface.
3, through the curtain box can be fixed directly on both sides of the wall and the top surface, non-through the curtains should use metal brackets, to ensure that the installation of the curtain box level, both sides of the window from the opening length is equal, the installation should be bounced before.
- Previous article:What is the development direction and prospect of the electrical industry?
- Next article:Dehua food strategy
- Related articles
- Can you plant dictyophora with wooden sticks?
- Where is Chun Hu Village located?
- How to get from Baojiang Bridge to chenghua district Panda Base and how to take a bus to support the ecological park?
- Buddhist precepts of today's era
- How many 12 traditional villages are there in Shanxi?
- Model essay on environmental research report
- Summarize a custom and explain its meaning in one sentence.
- Are the traditional buildings in Beijing good?
- Youth volunteer action embodies what with modern collectivism
- The new era of good youth advanced deeds material (general 8)