Traditional Culture Encyclopedia - Traditional festivals - Difference between monitoring scheme and permanent monitoring method for high slope of water conservancy and hydropower during construction period
Difference between monitoring scheme and permanent monitoring method for high slope of water conservancy and hydropower during construction period
Different monitoring purposes: The main purpose of the monitoring scheme during the construction of high slope of water conservancy and hydropower is to ensure the safe and smooth progress of the construction process and to find and deal with the slope stability problems in time. The purpose of permanent monitoring mode is to monitor the stability of slope for a long time and provide basis for operation management and maintenance.
Different monitoring facilities: The monitoring facilities of the monitoring scheme for high slope of water conservancy and hydropower during construction are temporary equipment, such as inclinometer and displacement meter. The permanent monitoring mode has relatively perfect monitoring facilities, including monitoring stations, monitoring instruments and data transmission equipment.
- Previous article:Measures to protect the environment
- Next article:Master Li Shubao's Chinese Painting Works
- Related articles
- What is Xiuqiang glass foundry?
- What are the festival traditions in Mianyang?
- Why vigorously carry forward and cultivate national spirit
- The view of informal organizations comes from
- The Works of Yi Man-Made
- What are the auspicious words that begin with four words?
- Satellite map of the United States (showing the physical features and urban distribution of the country)
- mysql no developer mode installation
- What are the specialties of Turkey?
- Traditional automobile sales in China.