How to determine crosswalk data in building structure construction organization design?
The crosswalk data is the number of man-days required to complete each division of work (continuous or intermittent), and the date sequence of entry and exit. The date sequence is decided based on the possible entry timing of the process overlap; the number of man-days required is calculated based on the input labor and machinery, according to the labor quota. Scientific organizational design is based on familiarity with process overlaps and the adoption of advanced methods, rather than the use of 'man-o'-war tactics'. Most of today's crosswalk scheduling is based on the reference to the duration quota and the existing experience, and the duration is set first, and the schedule is inverted. Each sub-projects according to the 'allocated' to the number of working days to maximize the input of labor, machinery; as far as possible to use the 'parallel operation', 'section flow', 'cross-construction' and other construction techniques.
- Previous article:What are the commercial banks?
- Next article:Citation of master's thesis of modern geomantic omen.
- Related articles
- How to set up the classic desktop of vivo mobile phone
- Is Zhong An a Ping An owned company?
- For marketing website SEO optimization planning what are the strategies?
- What are the delicacies in Baoji?
- How to make firecrackers with paper
- What are the common words in restaurant English?
- What are the estrogen drugs?
- Folk festivals of Japanese festivals
- What strange or rare diseases are there in the world?
- The performances of TCR, TSC and SVG are compared.