Traditional Culture Encyclopedia - Traditional stories - 2021 Engineering Project Planner Template

2021 Engineering Project Planner Template

For this project planning, I personally am also more confident, because my major is planning book, the following is my carefully planned plan. The following is a "2021 engineering project plan template", which is only for reference, welcome to read.

2021 engineering project plan template a

2021 anticorrosion insulation waterproof engineering project business plan is to follow the international practice of common standard text format written, a comprehensive introduction to the company and the project operation, describes the product market and competition, risk and other future development prospects and financing requirements.

The summary part of the anti-corrosion, thermal insulation and waterproofing project concentrates the essence of the business plan, covers the main points of the plan, and explains the business purpose at a glance, which makes it easy for the reader to review the plan and make judgments in the shortest possible time.

Anticorrosion insulation and waterproofing project product (service) description of this part of the project is one of the most concerned about investors, we comprehensively analyze the extent to which the product, technology or service can be a solution to real-life problems, to help customers save money and increase revenue.

The personnel and organizational structure section of the anti-corrosion, thermal insulation and waterproofing project describes in detail the composition and background of the core management team. And the key management personnel focus on the elaboration of the management capabilities they have, their positions and responsibilities in the enterprise, their past detailed experience and background. At the same time, the functions and responsibilities of each department of the company, the heads and members of each department, the company's remuneration system, the list of shareholders, the proportion of shareholding, etc. are also explained.

Anti-corrosion, heat preservation and waterproofing project market forecast for the product (service) whether there is a demand, the degree of demand, whether it can bring the desired benefits to the enterprise, the size of the market, the development trend of the future, what are the factors affecting the enterprise is currently facing the competitive landscape, what are the main competitors, and so on, were elaborated in detail.

The anti-corrosion insulation and waterproofing project marketing strategy combines the characteristics of consumers, product features, the company's own situation and the market environment, fully consider the feasibility of the implementation of the strategy line, and the choice of marketing channels, marketing team management, promotional programs, advertising strategies and price setting fully developed.

Anti-corrosion insulation and waterproofing project financial plan and the enterprise's production plan, human resources plan, marketing plan, etc. are inextricably linked, need to be built on the basis of the cost of the product (service), the output of the scale of the full analysis of the basis of the real situation of the enterprise, we have a detailed calculation of the cash flow statement, the balance sheet and profit and loss account.

2021 Project Plan Template II

Project Name: xx

Starting Time: xx

Preparation of Registered Capital: xx

Progress of the project: (explain the progress since the start of the project to the present)

Major Shareholders: (list the name of the current shareholders, capital contribution, form of capital contribution, units, and contact phone number. )

Organizational structure: (use the diagram to represent)

Main business: (the main business to be operated.)

Profit model: (Detailed description of the business profit model of the project.)

Development strategy and business objectives for the next three years: (industry position, sales revenue, market share, product brand.)

2.1 Establishment of the company's board of directors: (director members, name, title, work unit and contact phone)

2.2 Profile of senior management: chairman, general manager, the main technical leader, the main marketing leader, the main financial leader (name, gender, age, education, specialty, title, graduation school, contact phone, the main experience and performance, the main description of the management experience and success in the industry. management experience and successful cases in this industry.)

2.3 Incentives and constraints: (What incentives and rewards the company will adopt for management and key personnel.)

4.1 Technical feasibility and maturity analysis of the project

4.1.2 Discussion of the technical innovation of the project

(1) Fundamentals and key technical content

(2) Technical innovation points

4.1.2 Analysis of the maturity and reliability of the project

4.2 R&D achievements of the project and the main technology Competitors: (Whether the products have been appraised by international and domestic industry authorities and institutions at all levels; domestic and international situation, the project's domestic and international competitors in technology and product development, and measures taken by the project to improve competitiveness).

4.3 Follow-up R & D program: (Please explain the project's R & D focus, new products being developed or to be developed in the next three years in order to ensure product performance, product upgrading and maintain the advanced level of technology.)

4.4 R & D investment: (as of now the project's total investment in technology development, the number of development funds planned to be invested again, a list of the annual purchase of development equipment, staff costs and other costs related to development.)

4.5 Technical resources and cooperation: (the project's existing technical resources and technical reserves, whether to seek technology development and cooperation, such as universities and colleges, research institutes, etc., and if so, please explain the mode of cooperation).

4.6 Technical confidentiality and incentives: (Please explain the project to take those technical confidentiality measures, what kind of incentives to ensure the security of the project's technical documents and the stability of the key technical personnel and technical team.)

5.1 Industry status: (development history and current status, which changes have a greater impact on product profits and profitability, technical barriers to entry into the industry, trade barriers, policy guidance and restrictions, etc.).

5.2 Market Outlook and Forecast: (Industry-wide sales development forecast and indicate the source or basis of information.)

5.3 Target Markets: (Please provide a detailed description of the major types of users for which the product/service is intended.)

5.4 Major Competitors: (Describe the major competitors in the industry, mainly describing the competitors in the main sales market, their market share, competitive advantages and competitive disadvantages)

5.5 Market Barriers: (Please indicate whether there are any industry controls on market sales, the difficulty of entering the market for the company's products and the countermeasures)

5.6SWOT (please explain the establishment of sales network, sales channels, advertising and promotion, the establishment of agents, distributors and after-sales service strategy and implementation of the approach)

6.3 incentive mechanism: (explain the establishment of a good quality of the sales team's strategy and approach to the sales force to take what kind of incentives and constraints on sales staff)

7.1 product production (product production mode of their own production or commissioned, the scale of production, production sites, process flow)

7.1 product production (production), (production), (production) and (production). scale, production site, process, production equipment, quality management, raw material procurement and inventory management, etc.)

7.2 Production staffing and management

9.1 Equity in the number of SMEs financing and equity: (the number of equity participation in the project by the venture capital fund, other sources of funds and the amount of money, and the equity of each investment participant in the company)

9.2 Purpose of funds and use plan: (Please list the project implementation plan after the SME financing, including the progress of capital investment, the effect and the starting and ending time, etc.)

9.3 Return on investment: (State the average annual return on investment in the next 3-5 years after SME financing and the relevant basis.)

9.4 Financial Forecast: (Please provide the balance sheet, profit and loss statement, cash flow statement of the project forecast for the next 3 years after the financing of SMEs, and explain the basis for the preparation of the financial forecast data.)

11.1 Main Risks: (Please explain in detail the policy risks, R&D risks, operation and management risks, market risks, production risks, financial risks, exchange rate risks, risks of relying on the key personnel of the project that may be encountered in the course of the implementation of this project.)

11.2 Risk Countermeasures: (If the above risks exist, please explain the control and prevention countermeasures.)

2021 Engineering Project Plan Template III

System Overview:

The piping of this project is concealed within the walls and floor slabs of PVC pipes, and the power supply pipes are galvanized steel pipes.

1, construction sequence

According to the conventional construction method bottom-up with civil construction. Concrete slab, wall, beam, column pipeline with the main construction progress, masonry pipeline with the masonry construction progress, part of the pipeline can not be buried in advance, in the masonry to achieve a certain strength after chiseling buried.

2, construction process

1, concealed pipe laying process: construction preparation → prefabricated processing → pipe, wire box marking → pipe, wire box positioning → pipe connection → pipe, wire box reinforcement.

2, open pipe laying process: construction preparation → prefabricated processing → line marking → pipe connection.

3, construction methods

1, pipe simmering bend: PVC pipe with simmering pipe, steel pipe using stamping elbow welding.

2, pipe cutting: small pipe diameter using hand saws, larger pipe diameter using pipe cutting machine.

3, pipe connection: (PVC pipe): the use of special FST series of fittings, FSJ / Q series of lock nut and special bonding glue.

4, concealed pipe, box fixed: fixed in the board, wooden mold using nails, fine wire to tie the box fixed. The steel mold is fixed with high grade cement mortar. Walls and columns on the line box fixing using tie fixing. Pipes are fixed by wire and steel reinforcement binding, fixed spacing of 1 meter, within 150mm next to the line box for strengthening a binding. Explicit distribution pipe card fixed spacing: pipe card and the middle, the middle of the turn, the distance between the edge of the appliance or wire box for 150 ~ 500mm, the middle of the pipe card spacing according to the "building electrical engineering construction quality acceptance specification" GB50303-2002 Table 14.2.6 settings. Into the light box, switch box, the number of wires more than 4 choose a large box.

5, dark distribution of gas piping: piping should pay attention to the pipe bending radius is not less than 10 times the outside diameter of the pipe. The length of the pipeline without a bend ≥ 30m, a bend ≥ 20m, two bends ≥ 15m, three bends ≥ 8m to add a junction box. Four bends cannot occur in a single section of pipeline arrangement. Buried in the concrete wall or the ground when the pipe laying should be close to the inside of the steel and steel reinforcement binding fixed to minimize the overlap height, pay attention to the pipeline at least 15mm protective layer.

6, open distribution of gas pipeline laying: open distribution of pipes should pay attention to the bending radius should be greater than 6 times the outer diameter of the pipe. Piping arrangement should be smooth, straight.

7, ground connection: power pipe piping pipe and box connection, do across the ground line. Welded steel pipe ground connection using ≥ φ6 round steel span, welding length of not less than 6 times the outer diameter of the steel pipe, double-sided welding.

4, construction quality control focus

1, the focus of the project electrical piping pre-buried bathroom floor concrete slab in the piping pre-buried, because of the project bathroom water pipeline all use the ground within the concealed buried, once there is a board pipeline does not work, the second piping is bound to affect the laying of water pipeline. Therefore, we must ensure that the penetration rate of piping in the board reaches 100%. Construction should pay attention to the firmness of the piping and the quality of the joints, welding connections should pay attention to ensure that the casing length of 2.2 times the diameter of the pipe, the casing diameter should be matched with the diameter of the pipe, counterparts should be set in the middle of the steel pipe. Wire pipe and plastic pipe joints connected and then wrapped with tape.

2, dark distribution of gas piping layout: the plate piping to avoid giving, drainage or other professional risers through the floor position, especially the bathroom floor piping. Piping on concrete walls and columns, in order to ensure the accuracy of the same indoor elevation, use the second takeover, reserve the corresponding groove in the concrete wall, to be completed after the construction of civil engineering and then the work of piping. Pay attention to the protection of the finished products of the ground dumping pipe and the switching dumping pipe of the roof slab to prevent the pipe from being blocked. When piping on the masonry structure, try to piping with the masonry construction at the same time, do not have the same time piping can be in the case of masonry strength up, with a cutting machine slot laying. Pay attention to the width of the groove is not greater than the outer diameter of the pipe 5mm. pipe laying good with higher than the masonry mortar grade cement mortar sealing groove.

3, switches, sockets, light box layout: the location of the light box should pay attention to the center of the room layout, switch box location should pay attention to the distance from the door window edge to consider the decoration of the back door (window) set of the installation size, the location of the socket box should pay attention to whether the impact of the radiators or radiators. The same room in the same category of wire box pre-buried height to be consistent. In concrete walls, columns buried box, pre-buried before you can consider appropriate enlargement of the size of the pre-buried hole to prepare for the installation of the adjustment.

4, electrical piping connection: dark piping with PVC pipe should be careful to ensure that the casing length of 2.2 times the diameter of the pipe, casing diameter should be matched with the pipe diameter.

5, more than one piping side by side into the box, spacing should be uniform, neat and consistent arrangement; tube into the box, box outside should be equipped with lock nut fixed; into the floor-standing distribution box cabinet of the pipeline, the arrangement should be neat, the mouth of the pipe is suitable for higher than the foundation ground 50 ~ 80mm.

6, the construction of the professional and technical staff in accordance with the design drawings and the content of the drawing review of the preparation of the system of the special The technical submission, by the project engineer, quality inspector approval after the implementation. The whole process of electrical piping construction, professional technicians and quality inspectors in accordance with the construction drawings and "Building Electrical Engineering Construction Quality Acceptance Code" GB50303-2002 requirements for inspection. Inspection of qualified sticker quality checklist and indicate the inspection data reported to the supervisory unit acceptance.

5, conduit wiring installation

1 construction sequence

pipe threading in the piping project or trunking installation project is completed after construction.

2 process

The process of wiring in conduit: cleaning the pipeline → threading lead wire → selection of wire, phase color → placement → lead wire and wire binding → threading → disconnection → insulation test.

3 construction method

1, clean the pipeline: before threading with a cloth head will be in the pipe and wire groove water and debris clean.

2, threading in the pipe: use a steel wire through the wire introduced into the pipe, pay attention to the wire in the pipe do not appear kinks, joints, broken wires, back buckle.

3, wire phase: according to the design drawings and GB50303-2002 15.2.2 requirements of the phase color.

4, disconnection: wire box wire reserved length of 150mm, distribution box wire reserved length of 1/2 of the perimeter of the distribution box.

5, wire connection: shabu-shabu winding method of connecting the head, winding to ensure that the contact area and mechanical strength, at least 5 circles. The solder should be full, the surface should be smooth, there should be no false soldering, slag, and the soldering should be even. The joint parts should be clean, the humidity of tin-shabbling should be controlled to minimize burning the wire insulation layer, and the gap between them should be wrapped with insulating tape. The gap between them should be wrapped with insulating tape. After shabu-shabu, it should be wrapped immediately with rubber insulating tape inside and black tape outside to wrap it tightly.

6, insulation test: after the completion of threading, the line for insulation shaking test, selection of 500V, range 1 ~ 500MΩ megohmmeter measurement, lighting line insulation resistance value is not less than 0.5MΩ, the power line insulation resistance is not less than 1MΩ.

4 construction quality control focus

1, pipe threading should pay attention to the cleanliness of the box, the box, don't have sundries. Protective mouth, wire sheath should be complete and firmly installed, wire wrapping should be tight, good insulation, not hurt the core.

2, wire threading is completed after the wire connector disk into the box, box, to do a good job of protecting the finished product, the distribution box door lock, wire box before the installation of panels on a good temporary cover.

3, before the construction of professional and technical staff in accordance with the design drawings and drawings of the content of the review to prepare the system of special technical briefings, by the project engineer, quality inspector for approval after the implementation. The whole process of wiring installation in conduit construction, professional technicians and quality inspectors in accordance with the construction drawings and "building electrical engineering construction quality acceptance norms" GB50303-2002 requirements for inspection. Inspection of qualified sticker quality checklist and indicate the test data reported to the supervisory unit acceptance.

6 electrical lighting and appliance installation

1 construction sequence

ceiling, wall decorative coatings and ground cleanup near the end of the work, the end of the pipe threading work, the installation can be fully carried out when.

2 lighting installation process

lighting inspection → assembly → lighting installation → power test run

3 construction methods

1, lighting inspection: lighting installation before the appearance of the inspection, to ensure that the lamps and lanterns intact. The direction of the emergency lights should be correct, and reliable and sensitive.

2, the lamp wiring is strictly prohibited exposed, lamps and lanterns accessories are complete, no mechanical damage, deformation, paint peeling, lampshade, light box rupture, crooked warping and other phenomena.

3, the installation of lamps and lanterns: Where the installation height from the ground is less than or equal to 2.4m lamps and lanterns its metal shell with BV-2.5mm2 wire PE protection line. Lamp installation should be firm and upright, with ceiling lamps and lanterns or weight more than 3Kg lamps and lanterns, in the top plate with an independent boom or buried parts to bear the full weight of the lamps and lanterns. Lamps ceiling mounted wooden platform to be installed after the civil construction brush once, the wooden platform should be installed firmly, no gaps, do not reveal the black edge. Installed in rows of said light, in the pre-buried head box, the first line, according to the lamp type to leave the spacing position. Row installation of lamps and lanterns centerline allowable deviation of 3mm.

4, before the construction of professional and technical staff according to the design drawings and drawings of the review of the content of the project to prepare a special technical brief, by the project engineer, quality inspector for approval after the implementation. The whole process of installation of electrical lighting and appliances, professional technicians and quality inspectors in accordance with the construction drawings and "building electrical engineering construction quality acceptance specification" GB50303-2002 requirements for inspection. Inspection of qualified sticker quality checklist and indicate the inspection data reported to the supervisory unit acceptance.

7 switches, sockets and user terminal installation

1 construction sequence

ceiling, wall decorative coatings and ground cleanup near the end of the work, the end of the pipe threading work, the installation work can be carried out in full swing.

2 construction process

wire box cleaning → wiring → installation → power test run

3 construction methods

1, switches, sockets, user terminals installation: switches, socket installation according to JD8-108 page, concealed installation. Switch wiring should be correct, the switch must cut off the phase line. Switch position should be consistent with the lamp position, the same unit of engineering its seesaw switch on, off direction should be the same. Switch edge from the door frame l50 ~ 200mm from the ground 1.4m, the same indoor ≤ 5mm side-by-side installation ≤ 0.5mm, perpendicularity ≤ 0.5mm installed in rows ≤ 2mm socket concealed height from the ground according to design requirements, the same indoor installation requirements are consistent.

2, single-phase two-hole socket in the horizontal installation, facing the socket for the "left-zero right-fire", vertical installation, facing the socket for the "zero on the fire", single-phase three-hole and three-phase four-hole protective grounding wire are in the upper.

3, all socket protection line should be used with the phase line cross-sectional area, insulation of the same level of copper core wire. All kinds of wires in the distribution circuit, are not allowed in the switch, socket terminals to connect other branches by socket pressure line.

4, switches, sockets, user terminals, installation height, spacing control should be consistent. Switch wiring should be correct, the switch must cut off the phase line. Switch position should be consistent with the lamp position, the same unit of engineering its seesaw switch on and off direction should be consistent.

5, the construction should pay attention to, the panel of the screws using galvanized parts, the installation of tightly attached to the surface of the building, do not eat the wall, there is no black edges, gaps, the depth of the wire box is greater than 150mm, it is necessary to carry out edge treatment.

6, before construction by professional technicians according to the design drawings and drawings of the content of the meeting to prepare the project special technical briefings, by the project engineer, quality inspector approval after implementation. Switches, sockets and user terminals installed throughout the process, professional technicians and quality inspectors in accordance with the construction drawings and "building electrical engineering construction quality acceptance specification" GB50303-2002 requirements for inspection. Inspection of qualified sticker quality checklist and indicate the inspection data reported to the supervisory unit acceptance.

8, distribution box (cabinet) installation

1 construction sequence

concealed distribution box in the civil construction before plastering.

2 process

Low-voltage distribution box installation process: equipment unpacking and inspection → equipment handling → bullet line set → distribution box installation → grounding installation → open (concealed) distribution box (disk) fixed → secondary control line adjustment and simulation test → power supply operation acceptance.

3 construction method

1, according to the design requirements of the order, reserved distribution box hole size, and find a good elevation, level, vertical, the box will be filled with mortar around.

2, concealed distribution box fixed: in the reserved hole to install the distribution box, the box to find a good elevation and horizontal dimensions. After stabilizing the box, arrange the pipes into the box, fill the periphery with cement mortar and smooth it out, and then install the disk and paste the face after the cement mortar is solidified. If the bottom of the box is flush with the outer wall, the wall plastering should be done after fixing the metal mesh on the outer wall. No direct plastering on the box bottom plate. The mounting disk surface is required to be flat. Peripheral clearance uniform symmetry, paste the face (door) square, not crooked, screws vertical force uniformity, stabilize the box, piping straight.

3, each phase of the conductor color separation is clear, the color distinction is consistent, multi-stranded wire shabu shabu parts with and wire color consistent insulation tape winding, winding length is consistent, the wire pipe into the line, need to bring plastic mouth guard.

4, before the construction of professional and technical staff in accordance with the design drawings and drawings of the review of the contents of the preparation of the project special technical briefings, by the project engineer, quality inspector approval after the implementation. Distribution box (cabinet) installation of the whole process, professional technicians and quality inspectors in accordance with the construction drawings and "building electrical engineering construction quality acceptance specification" GB50303-2002 requirements for inspection. Inspection of qualified sticker quality checklist and indicate the test data reported to the supervisory unit acceptance.

9 grounding construction and installation

1 system overview

This project adopts the TN-S joint grounding body mode, equipment protective grounding, various metal piping equipotential grounding, etc. *** with grounding devices, grounding resistance is not greater than 1 Ω. Equipment protective grounding, various metal piping equipotential grounding, etc. *** with grounding devices, grounding resistance is not greater than 1 Ω. < /p>

2 construction and installation

1 system overview

This project adopts TN-S joint grounding body mode, equipment protective grounding, various metal piping equipotential grounding, etc. *** with grounding devices, grounding resistance is not greater than 1 Ω. /p>

2 construction sequence

The project lightning protection and grounding system according to conventional construction methods according to the progress of civil construction. Foundation grounding network and lead wires with the main body of the bottom-up laying. Local equipotential connection in the drainage pipe installation is completed for installation

3 construction process

Basic grounding network installation → lightning protection lead wire installation → flashover, horizontal lightning net installation → equipotential connection → grounding resistance test

4 construction methods:

1, the basic grounding network, lightning belt (net) welding: all welding work by a qualified welder, flat steel and lightning belt (net), the welder is a qualified welder, the welder is a qualified welder. Welders with welding qualifications, flat steel and round steel connection using lap welding, flat steel lap length of 2 times the width of the flat steel, three side welding. Round steel lap length is 6 times the round steel, both sides of the welding. Flat steel and round steel welding, lap length of round steel 6 times. Flat steel and steel pipe (angle) welding, the flat steel bent into an arc or right-angle shape, close to the steel pipe or angle and then welded on both sides. Remove the welding slag from the welding place and paint it.

1, foundation grounding network: according to the design requirements, the column of two adjacent Φ16 or more steel bars and base plate reinforcement lap welding. And the main bar in the column is marked. Install the grounding test disconnecting card between 0.3 and 0.5m from the ground on each lead wire. When the use of concrete reinforcement, steel columns as a natural lead and the use of foundation grounding body at the same time, may not set the disconnection card, but the use of steel for the lead should be indoors and outdoors at the appropriate location to set up a number of connecting plate, the connecting plate can be used to measure and do equipotential connection. Its upper end should be welded with the connection plate or steel column welding connection plate should have obvious signs, do a good job of hidden acceptance records.

2, equipotential practice: this project adopts the total equipotential coupling, the total equipotential plate made of TMX-500 × 25 × 4 copper plate, located in the total distribution box, all the buildings in, out of the metal piping are connected to the equipotential system. Total equipotential linkage line using -40 × 4 hot dip galvanized flat steel, total equipotential linkage are used in a variety of models of special equipotential special card, not allowed to weld on the metal pipe.

5, the ground within the reinforcing steel mesh must be connected to the equipotential box connection line, pre-embedded connection plate and lead out of the wiring board need to cooperate with the civil engineering professionals, pre-embedded connection plate is set in the corner of the concrete columns, the lead out of the wiring board through the wall lead out.

6, equipotential bonding line and sanitary appliances metal part of the connection using metal hoop, hoop and pipe contact with the contact surface must be scraped clean, after installation and brush protective paint. Pre-embedded parts in the installation of sanitary equipment near the location, with more than BV-4mm2 wire to the pre-embedded parts and sanitary equipment installation of galvanized bolts connected to the copper wire in the wall or the ground need to be protected by wearing a pipe, and connected to the LEB terminal board.

7, local equipotential connection: equipotential connection practice should be in strict accordance with the requirements specified in the drawings, pay attention to the welding quality and flatness of flat steel. Connection with the equipment grounding should be in place.

8, the project before the start of the professional and technical staff to prepare the system of special technical briefings, by the project engineer, quality inspector for approval after implementation. The whole process of construction, professional technicians and quality inspectors in accordance with the construction drawings, "Building Electrical Engineering Construction Quality Acceptance Code" GB50303-2002 and "Electrical Installation Engineering Grounding Device Construction and Acceptance Code" GB50169-92 requirements for inspection. Inspection of qualified sticker quality checklist indicating the inspection data reported to the supervisory unit acceptance.15 equipment system debugging

1, lighting system debugging: test the insulation resistance of the circuit should be not less than 0.5MΩ. Lamps and lanterns can not withstand the pull of the lamp line, the lighting switch must be sensitive and reliable.

2, switches, sockets, user terminals should be installed in accordance with the design requirements, the switch installed in the same area of the opening direction should be the same, and the operation is flexible, reliable contact contact. All sockets need to be checked in full with a calibrator to meet the specifications, and simulate the reliability of the leakage protector. User terminal connection line must be reliable, contact contact is correct.

5, installed in rows of lamps and lanterns with an elevation error of not more than 3mm. switch must control the phase line, the system check is qualified before powering up the test light, public lighting and through the load of a continuous line of test run test 24h. and every 2h to record the operating status, continuous time without failures.

6, low-voltage distribution boxes, cabinets, circuit insulation resistance of 10MΩ, the voltage test needs to be 2500V megohmmeter shaking test 1min, and no flashback breakdown phenomenon.

7, test run 24h without anomalies, reported to the supervising engineer, while submitting the relevant electrical product certificates, manuals, change negotiation records, test reports and user instructions for electricity prepared by the contractor.

8, equipotential connection test: after the installation should be conducted conductivity test, test power supply can be used no-load voltage of 4 ~ 24V DC or AC power supply. Test current should not be less than 0.2 A. When the measured equipotential connection terminal board and equipotential connection range of metal pipes and other metal bodies between the end of the resistance does not exceed 3 Ω, it can be considered that the equipotential connection is effective. If you find poor conduction of the pipeline connection, should be re-tested across the line.

9, grounding device test: grounding device should check the material specifications, materials, installation location, connection quality, spacing, quantity, depth of burial, grounding electrode connection method, corrosion prevention. The use of structural steel to do grounding lead wire should check the number of steel, specifications, lap length, welding quality, and grounding pole and other connections such as welding. And check with the grounding resistance tester, to reach the design 1 Ω, and then hidden.