Traditional Culture Encyclopedia - Traditional stories - safety protocol
safety protocol
In life, men, women and children may need to use the agreement, and signing the agreement can ensure the happy cooperation between the two parties. Do you know the format of the agreement? The following are seven security protocols that I have collected, which are for reference only and I hope to help you.
Security Agreement 1 Party A: Qinhuangdao Dinghao Electronic Mall Co., Ltd.
Party B:
Through full friendly negotiation between both parties, based on the principles of equality, mutual benefit, fairness and justice, in order to clarify the responsibilities, rights and interests of both parties and ensure that the service items can be completed on time and with high quality, this contract is hereby signed as follows:
1. Party A designates Party B to engage in external wall cleaning construction, and the construction period is: MM DD YY to MM DD YY. Under special circumstances (in case of force majeure, such as storm and lightning, etc.). ), the construction period will be postponed.
2. Construction site: Qinhuangdao Dinghao Electronic Mall Co., Ltd.
Service content: cleaning the external wall (the first floor is not included in the cleaning scope), removing led tubes,
Total project price: RMB four thousand Yuan only (¥ 4,000.00, excluding tax tickets).
Third, the operation requirements:
Party B carries out the construction by lowering the hanging board, and uses professional tools, exterior wall cleaning agents and glass cleaning agents to clean the exterior wall and glass, so that a protective film is formed on the glass surface, and the glass is not easily corroded by dust and acid rain.
Service standard:
The whole glass is smooth, free of offset printing, stains and building material residues; The external wall should be clean, free of dark colors, stains and building material residues.
Dismantling the LED tube shall not cause great damage to the external wall, and shall not leave obvious stains on the surface.
Four. mode of payment
On the day of completion, Party A and Party B shall conduct on-site acceptance. Party A shall pay a one-time cleaning fee to Party B within three days after the acceptance on that day.
Verb (abbreviation for verb) Rights and obligations of both parties:
1, Party A's responsibility
Party A arranges a special person to be responsible for contacting, coordinating, inspecting and supervising Party B's work;
Party A has the responsibility to verbally explain the safety matters to the person in charge of Party B before entering the site for high-altitude construction, including: safety precautions related to this project.
Because there are dogs on the roof, for personal safety, Party A is responsible for enclosing the dogs to avoid personal injury. If personal injury is caused by accident, Party A shall be responsible.
2. Party B's safety responsibility
1) The person in charge of Party B is the first person in charge of safety and is fully responsible for the daily safety management of this project.
2) Before starting work, safety education must be given to subordinates, and safety precautions and measures should be disclosed. Personnel without safety education are not allowed to enter the workplace.
3) The use of Party A or the machinery, electrical appliances and other facilities related to Party A must be approved by Party A, and Party A shall be responsible for its safety protection measures and undertake safety responsibilities.
4) Education and supervision personnel are not allowed to enter places outside the construction project area without authorization, touch and start machinery, electrical appliances, control valves and other equipment, otherwise Party B will bear all the responsibilities for the accidents caused thereby.
5) Be responsible for the safe construction of the project and the safety of all personnel involved in the project.
6) Any personnel of Party B shall not fight in the construction area, and it is forbidden to go to work after drinking.
7) If any safety accidents, casualties or all losses are caused to Party A and the third party during Party B's construction, Party B shall bear all the responsibilities, and Party A shall not bear any responsibilities;
8) If Party B causes personal or property damage to Party A or a third party during the cleaning service, it shall compensate.
Party A and Party B shall strictly abide by the terms of this contract, perform their respective duties and do a good job in civilized construction.
7. This agreement is made in duplicate, each party holds one copy, and both copies have legal effect. This agreement shall come into force as of the date of signing. Matters not covered herein shall be settled by both parties through friendly negotiation.
Party A (signature of representative): Party B (signature of representative):
Party A (Contract Seal): Party B (Contract Seal):
Party A's telephone number: Party B's telephone number:
Date: Year Month Day Date: Year Month Day
Acceptance signature of Party A:
Date: Year Month Day
Recipient: Ma Ying
Payer: Zhou Ming
Site Coordinator: Zhou Ming
Part II of Security Agreement Party A (Employer): ID number:
Party B (contractor): ID number:
In order to clarify the rights and obligations of both parties in the process of building private houses, Party A and Party B voluntarily reach the following construction agreement through consultation:
First, the contracting method: the contractor does not include materials.
2. Contract price: ¥/㎡, and the total construction area is the sum of the top areas of each floor.
Three. The contracted building covers the interior and exterior decoration of the house, and Party B completes the building to ensure that Party A can sweep the floor and sit in the house.
Four. Responsibilities of Party A and Party B:
1. Party A's responsibilities:
(1) Before construction, Party A shall make good preparations for foundation and water and electricity.
(2) After the construction, Party A shall provide building materials (including bricks, cement, sand, doors, windows, steel bars, floor tiles, wall tiles, etc.). ) According to Party B's construction requirements.
(3) Party A provides accommodation for Party B. ..
2. Party B's responsibilities:
(1) Party B's construction must be carried out according to the drawings and shall not be changed without authorization. In case of any change, both parties shall settle it through consultation.
(2) All tools, templates, shelves and other equipment required for construction shall be solved by Party B itself.
(3) Party B shall follow the principle of economy in construction and shall not waste raw materials. If Party B wastes materials, Party B shall compensate Party A for the expenses exceeding twice the value of the wasted materials.
(4) The wages of Party B's workers shall be borne by Party B and have nothing to do with Party A. ..
(5) Party B is responsible for the accommodation of Party B and construction personnel.
Verb (abbreviation for verb) safety responsibility
Party B shall manage the construction personnel by itself, and Party B shall carry out standardized and standardized construction. In case of construction safety accidents, Party B shall bear all legal responsibilities by itself.
Quality assurance of intransitive verbs
Party B shall ensure that the built houses conform to the specifications, and there shall be no column inclination and exposed steel bars. If the quality of the completed house is not up to standard, Party A may refuse to pay for the project, and Party B shall also compensate Party A for the losses according to the price.
Seven, project payment
1. Before the commencement of construction, Party A shall pay RMB to Party B. ..
2. After the first floor is capped, Party A shall pay RMB to Party B. ..
3. After the second floor is capped, Party A shall pay RMB to Party B. ..
4. After the third floor is capped, Party A shall pay RMB to Party B. ..
5. After all the projects are completed. After acceptance and settlement by both parties, Party A will pay the final payment in one lump sum, but Party A will withhold 10000 yuan as the project quality deposit. After half a year, the house has no quality problems, and Party A will pay it to Party B in time.
Eight. Liability for breach of contract: Any party's failure or incomplete performance of all terms of this agreement constitutes a breach of contract, and the breaching party shall bear all losses caused thereby.
9. In the process of construction, Party A and Party B should communicate with each other to ensure that the project is completed on time. Matters not covered in this contract shall be settled by both parties through consultation.
X this agreement is made in triplicate, one for each party and one for the witness.
Witness: Party A: Party B:
date month year
Safety Agreement Article 3 In order to ensure the fire safety during the decoration, the fire prevention responsibility system shall be implemented step by step in the decoration project area in accordance with the relevant regulations of xx municipal government. At present, the Property Management Office (Party A), the owner (user) and the decoration construction unit entrusted to carry out the decoration project (with Party B) have entered into a power of attorney on fire safety as follows:
Party A's responsibilities:
1, supervise the decoration project according to the design scheme approved by the fire department;
2. Coordinate Party B's construction mobilization;
3. Be responsible for introducing the residential fire protection facilities and relevant laws and regulations related to this project to Party B;
4. Be responsible for coordinating the electricity, water and heat work of Party B during the construction period;
5. Have the right to supervise the fire safety during Party B's construction, and have the right to order Party B to make corrections until it is ordered to stop working, and report to the relevant departments for handling according to law.
Party B's responsibilities:
1, responsible for the fire safety responsibility of the renovation project of residential units to ensure that no fire accident occurs.
2. Set up the person in charge of site safety (name:) to learn about the fire safety of construction from Party A and be responsible for the fire safety of construction.
3. Electricity, water and hot work shall be approved by Party A before:
3. 1 The electrical operator shall hold the electrician operation certificate, show the original and copy to Party A for the record.
3.2 When hot work is carried out, Party A's hot work permit shall be obtained in advance, and it shall be operated by a certified welder. Illegal operation is strictly prohibited.
4. Party B shall abide by the management systems of Party A..
5. When Party B needs to use flammable materials in the construction, it must keep the flammable materials well in advance and report to Party A by a special person. It can only be brought in after Party A's approval, and the designated counter is responsible for it. Don't store too many items, limited to the amount used that day. After the construction is completed, the remaining items must be taken away from the site.
6. Smoking is prohibited in the construction area.
7. The construction area should be equipped with fire fighting equipment, and the number of portable fire extinguishers should be at least two.
8. Deal with the fire accident in time, notify Party A in time and call 1 19 to truthfully report the cause of the accident, protect the site and cooperate with the investigation.
9. On-site decoration garbage should be cleaned up to the designated area in time, especially shavings and sawdust should be cleaned up every day, and designated persons should be responsible for it. It is forbidden to block the fire escape with construction waste or garbage, and it is forbidden to block, damage or misappropriate fire control facilities to ensure the cleanliness of the site.
10. When off duty, Party B's construction personnel should carefully check the construction site to prevent fire hazards and cut off the power supply of electrical equipment when leaving.
1 1. Party B shall conduct safety education for construction personnel, actively cooperate with Party A's supervision and inspection, and formulate a safety system. This agreement is made in triplicate, one for each party.
Party A (property service enterprise):
Party B: (Owner) (Decoration Construction Unit)
Year and day
Article 4 1 of the security agreement. The tower crane driver who enters the construction site must strictly abide by the operation procedures and various rules and regulations of the site, and implement them according to the requirements put forward by Party A. ..
Party A: xxxxxxx
Party B: the correspondent of Tass news agency.
Second, the responsibilities of both parties.
1 Party A's responsibilities
(1) Party A shall seriously implement the policies, regulations, rules, specifications, standards and requirements of the state and Beijing regarding safe and civilized construction.
(2) Party A shall perform the construction management functions for Party B, be fully responsible for the management of the construction site, implement the relevant regulations of the state and Beijing, and the contract terms and agreements of this contract, and shall not give orders in violation of regulations.
(3) Party A shall carry out unified management on the construction site, and the technical department shall be responsible for the construction organization design, the preparation and examination and approval of sub-projects and the overall planning of the construction site. Both parties shall provide safety education to the new construction personnel and make detailed records.
(4) Party A has the right to severely punish the personnel of Party B's construction unit, the person in charge of construction and the construction personnel who work without education or technical disclosure, and immediately stop the operation.
(5) Party A shall sign this responsibility letter for safety and document management before Party B enters the site.
(6) When Party A discovers various hidden dangers in the construction site, it has the right to send a written notice of hidden dangers to Party B, and Party B shall rectify and pass the standard acceptance within the specified time limit; If the rectification fails or the rectification is incomplete within the time limit, Party A will impose a 300 yuan -20xx penalty on Party B according to the Provisions on Punishment for Determining the Nature of Construction Project Site Management Problems. 500 yuan will be fined -3000 yuan if the danger is serious. Party A has the right to order Party B to stop work, and Party B shall bear the consequences.
(7) For those who command and operate for many times, violate labor discipline, fight, stir up trouble, insult others, fight, disobey management, have potential safety hazards, refuse to rectify and stop violations, Party A has the right to send a written notice to Party B, and give a notice of punishment above 500 yuan to force Party B to replace and clean up the site; Relevant teams and construction personnel; If the problem is serious, Party A will replace the whole team or team. Application for liquidation within a time limit; During the replacement of Party B's personnel and personnel, the person in charge of Party B's unit shall bear all responsibilities and consequences for all personal injuries, public security incidents, criminal incidents and economic losses.
(8) Party A adheres to the original "four no-misses". That is, the cause of the accident is unclear; Those responsible for the accident and the masses were not educated; Failing to implement preventive measures; The person responsible for the accident has not been dealt with.
Three, rigger (hook, bell man) construction safety requirements:
1. The rigger of Party B shall be in good health, with binocular vision not less than 1.0, and free from diseases and physical defects that affect the lifting operation, such as color blindness, hearing impairment, hypertension, heart disease, epilepsy, dizziness and sudden fainting.
2. Party B must receive safety technical training and hold relevant certificates. Do not work after drinking.
3. Party B must check the working environment, slings and protective equipment before operation. There are no idle people in the hoisting area, and obstacles have been removed. The sling shall be free from defects and securely tied, and the hoisted object shall not be connected with other objects. Confirm safety before operation.
4. When the wheeled or crawler crane is working, it is necessary to determine the hoisting area, set warning signs, and send someone to monitor it when necessary.
5. In severe weather such as heavy rain, heavy snow, fog, and wind above level 6 (including level 6), the open-air hoisting operation must be stopped. It is forbidden to work under live high-voltage lines.
6. Under the following circumstances, Party B is prohibited from carrying out lifting operations:
(1) The mass of the suspended object exceeds the allowable range of mechanical properties;
(2) the signal is not clear;
(3) There is someone under the lifting object;
(4) people standing on the lifting objects;
(5) Vertical members and large formwork do not need snap rings;
(6) Cable-stayed objects;
(7) Loose objects are not fastened;
(8) There is no container for holding odds and ends;
(nine) the quality of the hoisting object is unknown;
(10) The sling does not meet the requirements;
(1 1) The light at the work site is dark.
7. Party B must operate according to the technical disclosure. Obey unified command.
8. When using the crane, Party B must correctly select the location of the lifting point, wear the rigging reasonably, and lift it only after the trial hoisting is correct. Except the commanding and hooking personnel, other personnel are strictly prohibited from entering the hoisting operation area.
9. When using two cranes to lift large components, the performance of the cranes should be consistent, and the load of a single crane should be reasonably distributed, and it should not exceed 80% of the rated load. At work, we should have unified command and act in unison.
10. When lifting material containers (earth buckets, concrete buckets, mortar buckets, etc.). ), must be carried out according to the following requirements:
(1) The load (including dead weight) shall not exceed 5000kg;;
(2) It must be designed by professional technicians and reported to the chief engineer of the project management department for approval;
(3) When welding, choose a welder with high technical level for welding, and the quality management personnel will follow up and check to ensure the production quality;
(4) After the production is completed, it must be checked and accepted by the chief engineer of the project management department, and hoisting shall be carried out after it is confirmed to be qualified;
(5) At the time of acceptance, the design drawings and calculations must be submitted to the competent department of the project management department for archiving, which will be included in the management category and regularly checked and maintained. If it is damaged, it will be repaired in time and kept in good condition;
(6) Before use, it must be checked by the operator to confirm that there is no crack in the weld, no skew and crack in the rings, and the container is in good condition.
Fourth, the basic safety operation
Length threading: determine the center of gravity of the lifting object and select the position of the lifting rope. The rope should be put on with an iron hook, and the arm should not reach under the hanging object. When lifting objects with hard edges and corners or easy to slide, pads and lassos must be added.
2. Rope hanging: Ropes shall be hung in sequence, and shall not be squeezed, crossed, kinked or twisted during rope hanging. Generally, hanging objects can be hung in pockets, so be sure to keep the balance of hanging objects. For goods that are easy to roll, slide or are too long, pull the rope and lock the hanging rope O with a snap ring.
3. Trial lifting: The lifting rope should be hung firmly and lifted slowly. Tighten the lifting rope for a while, and do not lift it too high. During trial hoisting, the bell man, the hook man and the driver must be coordinated. If it is found that the center of gravity of the hoisted object deviates or is connected with other objects, the lifting must be stopped immediately, and measures must be taken to confirm the safety before lifting.
4. Take off the rope: put down the rope, stop, hold it tightly and then loosen the lanyard. For hangers that are easy to roll, slide and disperse, use safety hooks to remove ropes. The hook shall not stand on the hanger. If it is difficult to remove the rope manually, other machines and tools should be used to assist. It is forbidden to climb lifting objects and ropes.
5. Pull rope: The hook should be perpendicular to the center of gravity of the suspended object, and the pull rope should be slow. It is not allowed to pull or force the pull rope obliquely, nor to rotate the boom pull rope. If the lifting rope is pressed, it should be stopped immediately, and the rope can be pulled by lifting. Crane rope shall not be used for lifting fragile, rolling and falling objects.
6. The suspension operation shall meet the following requirements:
(1) When hanging the rope, the lifting point position should be accurate, the rope should not be offset, and the objects should be balanced.
Disclosure:
(2) The suspension of the lock rope should be easy to take off the rope.
(3) When hoisting the fixture, collision with the fixture during hoisting should be avoided.
(4) When lifting the pole, the lifting point should be symmetrical with the center of gravity of the hoisted object.
7. Binding operation shall meet the following requirements:
Binding must be firm; When lifting containers and other box-shaped objects for loading, the box-shaped objects should be firmly connected with the car with binding tools, and padded with anti-skid; Pipes, components, etc. It must be fastened with a tightener.
8. The new spreader and spreader shall be inspected according to the instructions, and can be officially used only after the trial hoisting is correct.
9. Hoisting machines and tools that have not been used for a long time must be tested and tested, and can only be used after being confirmed safe.
10. The safety factor of wire rope and stay cable shall not be less than 8 ~ 10.
Five, tripod hoisting
L Before operation, machines, tools, slings, ropes and supporting materials must be selected according to the requirements of technical disclosure.
2. Before operation, the operation site shall be leveled and compacted. The bottom of the tripod should be well padded.
3. The protruding length above the binding rope at the top of the tripod shall not be less than 60em, the length of the three rods below the binding point shall be equal, and they shall be firmly connected with steel ropes, and the spacing between the three legs at the bottom shall be equal, which is 1/3 ~ 2/3 of the height of the frame. Two adjacent poles are connected by rows of wood, and the spacing between rows of wood shall not be greater than l.5m
4. The lifting operation must be commanded by designated personnel. During trial hoisting, all components shall be inspected and confirmed to be safe before formal operation.
5. When moving the tripod, there must be a special person to command and more than three people to operate.
The promotion of intransitive verb components and equipment
Before the length operation, check the hanging objects, site, working space, etc. , and confirm the safety before operation.
2. During operation, slow lifting, slow turning and slow moving shall be carried out, and the suspended object shall be kept stable with the control rope.
3. When moving parts and equipment, the parts and equipment must be firmly connected and kept stable. The road should be solid and smooth, and the operators must obey the unified command and coordinate. When using a crane to move parts or equipment, a slow crane must be used.
4. The site for stacking components should be solid and flat. Post-mode should support firmness and stability.
5. When lifting large components with jacks and adjusting them in place, it is forbidden for jacks at both ends to rise and fall at the same time; When two jacks are used at one end, the landing speed should be consistent.
6. When transporting super-long members, the suspended part shall not be greater than 1/4 of the total length, and anti-overturning measures shall be taken.
7. When the operation is suspended, the parts and equipment must be driven out smoothly, and they can only leave the site after the connection is firm.
Seven, sling
1. Proper slings must be selected according to the weight, volume and shape of the hoisted object during operation.
2. It is forbidden to repair welding and punch holes on the hook. The surface of the hook must be smooth and free from cracks. It is forbidden to use the hook with the abrasion degree of the dangerous section reaching 10% of the original size, the opening size of the hook mouth increasing by 15% compared with the original size, the torsional deformation exceeding 10%, and the plastic deformation of the dangerous section or neck. When the wear of the plate hook bushing reaches 50% of the original size, the bushing should be scrapped. When the wear of the plate hook mandrel reaches 5% of the original size, the mandrel should be scrapped.
3. Wire rope rigging should use 6X 37 wire rope. The length of the insertion section shall not be less than 20 times the diameter of the wire rope, and shall not be less than 300ram. The strength of braided wire rope shall be calculated as 70% of the original strength.
4. The horizontal included angle of the sling shall be greater than 45. .
5. When using the snap ring, transverse force is prohibited, and whether the closing pin is tightened must be checked before lifting. Cracked and deformed snap rings shall not be used. It is forbidden to repair the snap ring by welding repair.
6. Wire rope in any of the following circumstances shall not be used again.
(1) When in use, the speed of broken strands or wires is accelerated.
(2) The number of broken wires in a pitch exceeds 10% of the total number of wires.
(3) Twisting, dead bending, flattening, obvious strand looseness, wave shape, steel wire flying out, rope core squeezing and strand breaking occur.
(4) The diameter of steel wire rope is reduced by 7% ~ 10%.
(5) The steel wire on the surface of the steel wire rope is worn or corroded to the extent that the diameter of the steel wire on the surface is more than 40%, or after the steel wire rope is corroded, the surface pits are clearly visible and the whole steel wire rope is obviously hardened.
(6) Before using the newly purchased slings, the certificate of approval shall be checked, and trial hoisting shall be conducted to confirm the safety.
This agreement is made in triplicate, one for the signalman of the project department and one for the signalman of the tower. This agreement will come into effect after being signed.
Party B must strictly abide by the above requirements.
Signature of the person in charge of Party A and signature of the person in charge of Party B.
Year, month, sun, moon, sun.
Article 5 of the Security Agreement Party A:
Party B:
On * * * *, Party A (* * Experimental Kindergarten * * Class Committee) organized parent-child activities in Pipawan Ecological Farm, and Party B was the guardian (father or mother) to accompany the children in Party A's garden. In order to clarify the rights and obligations of both parties and ensure the safety of children, the following agreement is reached with Party B:
1. Party A shall undertake the following responsibilities when organizing kindergarten parent-child activities in Pipawan Ecological Farm:
(1), supervise and guide Party B. ..
(2) Provide appropriate means of transport to ensure the safety of the means of transport.
(3) Provide suitable sanitary conditions.
(4) Assist Party B in managing and educating children.
(5) Provide Party B with appropriate contact information so as to contact each other in case of emergency.
2. As the guardian (father or mother) of * *, Party B shall always participate in parent-child activities organized by Party A, protect the health of children, take care of their lives, and be responsible for the safety of children's participation in activities. Party B shall perform the following guardianship obligations during the activity:
(1), away from rivers, ponds and other places, especially places without any protective facilities;
(2) playing near the road without children;
(3) Pay attention to whether there are obstacles on the ground. If there are steps, stones, bricks, plastic bags and other things that are easy to trip children, take them with you;
(4) Whether the ground is slippery, whether there is moss or stagnant water, tell the child to detour;
(5) If children want to play with water, Party B must always take care of them.
(6) Tell the children where to go and what to pay attention to before leaving;
(7) Not all games are suitable for your children. Parents should be able to judge that if you feel unsafe, you must stop your children.
(8) After arriving at the destination, parents should not only take photos and talk, but also keep their eyes on their children even on the flat ground with wide vision; When playing with children, always remind them to manage and educate them.
(9) Party B shall wear mobile phones and other communication tools, and inform the contact person of the number. Party B shall obey the management and requirements of Party A, keep a proper distance from Party A's teachers and keep in touch in time.
3. Responsibility:
(1). The guardian shall be responsible for any injury or loss caused to the child due to the guardian's violation of guardianship duties and safety agreement.
(2) If there is evidence to prove that children's rights and interests have been infringed by intentional acts of Party A or its employees, Party A shall bear relevant responsibilities.
* * Experimental Kindergarten * * Class Family Committee
**-**-**
In order to strengthen school management, ensure students' safety and create a safe campus, we have signed the following safety guarantee agreement with car owners or drivers who have not played in school for a long time:
1. If the personal vehicles (including motorcycles) of the school staff or their families need to be parked on campus for a long time, they must sign this agreement and obey the management.
2. All vehicles must be parked at the location designated by the school, and they are not allowed to stop and put them anywhere. The school is not responsible for the safety and protection of any vehicles parked in the school.
3. The faculty and staff who drive private cars must avoid the peak hours when students go to school. Students are not allowed to follow when going to work. First, they can park their cars outside the campus gate and then drive in after all the students have entered. Second, you can get to school before school, and you must wait until the students are quiet.
4. The owner and driver of any vehicle should take full responsibility for any student safety accident or other property loss in the school.
During class, no motor vehicle is allowed to enter the campus. If there are special circumstances, the doorman can only let them in after obtaining the consent of the relevant school leaders. It is forbidden to whistle and start at will on campus to ensure the normal teaching order of the school.
6. Any vehicle entering or leaving the parking lot must obey the management of the school doorman security personnel. If it does not obey the management personnel, the doorman has the right to stop the vehicle from parking and entering or leaving.
7. School teachers and drivers should always keep in mind traffic safety, drive in a civilized way, do not drink and drive, abide by the regulations of the school and the transportation department, and consciously set an example of obeying traffic rules. It is hoped that all motor vehicle owners will consciously implement the above regulations, sign safety agreements with schools, actively support school work, be responsible for the safety of teachers and students, and do their part to create a safe campus.
This agreement is made in triplicate, one for Party A's school office and security officer, and one for Party B's car. This agreement shall come into effect as of the date of signature by both parties.
Party A: (official seal)
Party B: Owner's license plate number:
Owner: (signature or seal)
Kangxian county Taishi school district
20xx June 14
Chapter 7 of the Security Agreement Dear Parents:
Caring for children's physical and mental health and ensuring their safety are the common responsibilities of kindergartens and parents. In order to achieve the good effect of consistent education at home, the following safe transportation agreement is formulated, and parents are expected to understand and cooperate.
1. Parents are requested to send their children to the garden at 7:30-8:30 in the morning and 1:30-2:30 in the afternoon. For the safety of children, when entering the park, children must be sent to the class or the teacher on duty for face-to-face handover. Don't let children play alone in the park to prevent accidents. Parents should be responsible for all safety issues before handing over their children to teachers.
For the sake of safety, parents are requested not to let their children bring valuables and dangerous goods into the park. Parents should check their pockets before their children come to the park. If dangerous goods (such as knives, pills, nails, small particles, nail cones, marbles, broken glass, etc. ) if it is found, it should be taken out immediately and educated in time.
Third, children should be sent to the health care teacher for morning check-up after coming to the park in the morning. If you need to take medicine for half-day care of children, please give the medicine to the health care teacher, indicate the usage and dosage, ask parents to sign and get the notice from relevant departments. The park refused to take antibiotics and supplements.
Fourth, under normal circumstances, don't let children be absent and late for no reason. Children can't come to the park for various reasons. Please submit the leave slip to the teacher in advance, and do a good job of asking for leave, so that the teacher can know fairly well.
Verb (abbreviation for verb): In principle, parents pick up and drop off their children themselves. If it is difficult to entrust others to pick up and drop off children, the person entrusted to pick up and drop off children should be a person with full capacity for safety (/kloc-a normal person over 8 years old). Please contact the teacher in advance and tell the teacher the name, gender, age, characteristics, clothing and relationship between children. Parents are requested to inform the teacher in advance and sign the power of attorney, and the teacher of the interest group outside the park will pick up the children with the power of attorney.
6. After the child is taken over from the teacher by the shuttle bus, the shuttle bus is responsible for all safety issues.
Seven, in order to ensure the safety of children when they leave the park, please pay attention to parents:
(1) When leaving the garden, children and parents were too crowded. In order to ensure the safety of children, please leave the park as soon as possible when you pick them up. If you need to take your children to play in outdoor venues, please do a good job of safety protection. If an accident happens during this period, you are responsible for everything.
(2) When walking through the corridor, educate children to take care of the facilities in the corridor, remind them to walk step by step, don't run and jump, and don't slide down the handrail of the stairs to avoid safety accidents.
Eight, without permission, parents are not allowed to enter the kindergarten classroom; Parents should not visit their children when they are half-breasted, without special circumstances.
Nine, children come to the park, leave the park and all the safety responsibilities outside the park are all the responsibility of parents.
Parental Opinions: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Parent's signature: _ _ _ _ _ _ Child's name: _ _ _ _ _ _ _ _
Teacher's signature: _ _ _ _ _ _ _
- Previous article:What is the process of going to the hospital for examination?
- Next article:What secondary schools are there in Nanchong, Sichuan in 2022?
- Related articles
- What impact will internet plus have on traditional industries?
- Morals and Symbols of the White-headed Bulbul Bird
- Dual-WAN Router Setup Methods
- What are the advantages of China's traditional cultural resources?
- How to make a vase craft
- The Artistic Features of Zibo Lantern Festival
- How about fishing in rainy days?
- What are the international logistics modes of cross-border e-commerce?
- Can Chinese medicine treat hepatitis B?
- The theme of China handwritten newspaper Mid-Autumn Festival is simple and beautiful.