How much does woodworking renovation cost

How much does it cost for carpentry renovation? The rise in prices is not only the high prices of housing, renovation prices are rising every year, this is an indisputable fact, there are many reasons for the rise in the price of decoration, the rising cost of materials, the rise in the cost of labor, resulting in annual renovation prices into inevitable, then carpentry renovation of how much money is the labor? We bring you the carpentry decoration to how much money? What are the steps to renovate the house?

A, carpentry decoration how much money?

1, carpentry decoration how much money? Most of the 300 yuan -400 yuan a day, but now home improvement in the carpentry work less and less, closet, bed everyone buy finished furniture, wooden doors also buy finished products, and even the ceiling has integrated ceiling, so carpentry work in the home improvement is less and less, to find the work of the carpentry income on the higher, can not find the work, the craft can not find the income of carpentry is lower, but also pulled down the average wage of the entire carpentry. And more and more carpenters said it is often difficult to find work.

2, carpentry decoration how much money? General decoration, carpentry part of the big head, accounting for about 70% of the total volume of work, of which the cost of carpentry part of the 40%; can only tell you, how much money for carpentry decoration? Workers' fees: skilled workers (commonly known as big workers) more than 300 yuan per day, small workers (that is to say, miscellaneous, carpentry decoration to how much money? To the skilled workers to help) daily wages of 200 yuan or more.

Two, what are the steps to renovate the house?

1, tools in place, ready to go

Before the renovation, a few things that must be ready to put in your bag. Tape measure (buy 5m, do not 3m), calculator, large board clip (clip sheets, receipts with); in addition, early in the site ready to old towels (soft cotton kind, paste the brick wipe brick with), plastic bags (wrapped around the pipeline interface, can be prevented from clogging the dirty.

2, choose a good day, cannon start

Before the workers into the field, the corners of the home to personally measure once, take a pen and ruler to write down, mark clear, must not be lazy. Measurements mainly include: clear area involved in the decoration process. Especially the tile area, wall paint area, wallpaper area, floor area; clear main wall size. Especially later need to design the placement of furniture wall size.

3, the main body demolition, make the space more practical

The main body demolition is on a project, mainly including demolition of walls, masonry walls, shoveling wallpaper, demolition of heating, plastic windows and so on. After the demolition of the garbage, to clean out in time to ensure the cleanliness of the interior, but also to facilitate the construction. At this time, it is time to finalize the finished door at this time the cabinet, hood, stove, water heater shopping through, and can be determined.

4, water and electricity remodeling, arrange the use of each space

Water and electricity remodeling, there is no regret medicine to eat. Brick on the wall, ceiling a letter, and then want to add sockets can be difficult. Therefore, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines and so on. Before the transformation of water and electricity, cabinet designers should come to the door to measure, to help you determine the power, water transformation program. Water heater, also send someone according to the model you identified, design the location of the power supply, interface. Remind you oh: the wall under the water basin, stay power outlet, easy to install KitchenAid. Air conditioning hole and power try to put on this wall at the head of the bed, to avoid future air conditioning blowing directly at people. Strong and weak power to maintain 20 centimeters of spacing, for example, between the socket and the network cable to leave a distance of 20 centimeters.

5, package riser, the unsightly pipe package

Considering the kitchen bathroom is easy to damp and humid environment, package riser material must not use wood keel! We must be careful, even if the wood keel on the brush anticorrosion coating does not work. Remember, the package riser with light steel keel, or red brick. Light steel keel to save space, but solid good with red brick. At this time you need to buy good tiles, hooking agent and other furniture to be set early, leave a good period of time, usually at least 15 days or so to add, the package pipeline should not have access to the mouth of the place wrapped, in case of water seepage can not find the cause.

Fresh new home, furniture bears the brunt. Bed, mattress, closet, shoe cabinet, sofa, dining table and so on. Furniture into the field before, should be prepared for the following items: disposable shoe covers (do not buy poor quality, step on the broken), a few boxes of activated charcoal, ladders, floor protection film (handling closet, TV cabinets, etc. on the floor to do a protection). If you buy a fabric bed, remind you to see if the fabric can all be taken down. Appliances hurry delivery, tight or not in a hurry to wait and then say okay. Anyway, appliances are getting cheaper and cheaper.

The above is a small introduction to the carpentry decoration how much money? What are the steps to renovate the house? The first thing you need to do is to get a good deal on the price of the product. Renovation of the house for most people are very confused, we can be ready to renovate the house before you look at these processes and steps, so that a simple understanding of the process of renovation of the house.