Traditional Culture Encyclopedia - Traditional stories - Guangxi Housing and Construction Department introduced measures to promote steady economic growth.
Guangxi Housing and Construction Department introduced measures to promote steady economic growth.
These measures are as follows:
First, fully safeguard and promote the construction of key projects for epidemic prevention and control.
(a) to promote the construction of the autonomous region and some cities at full speed. According to the requirements of the leading group headquarters for epidemic prevention and control in COVID-19, autonomous region, we should adhere to the principle of "unified command, unified design and unified construction", handle special affairs and accept vacancies, make overall plans to promote the establishment, site selection, design, construction, equipment procurement and fund management of standby emergency hospitals in autonomous regions and some cities, speed up the construction progress, strengthen quality control and strive to build high-quality emergency hospitals.
(two) to ensure that the key projects are started (resumed). For projects that are necessary for urban operation, epidemic prevention and control, important for the national economy and people's livelihood, and urgently needed for enterprise production and operation, all localities should strengthen guidance services, give priority to the deployment of personnel, and give priority to ensuring the opening (resumption) of key projects.
Second, promote the development of housing and urban and rural construction, and promote steady economic growth.
(3) Promoting enterprises to resume work and production in an orderly manner. Simplify the project start-up (resumption) requirements and procedures, and promote enterprises to resume work and production in an orderly manner. In low-risk areas, under the premise of effective prevention and control, the local housing and urban and rural construction industries should be accelerated to resume production; In medium-risk areas, under the premise of continuing to do a good job in epidemic prevention and control, promote the local housing and urban and rural construction industries to resume production and work in an orderly manner; High-risk areas should focus on epidemic prevention and control, and actively take measures to ensure that key projects involving the overall situation resume work and production, and other projects will gradually resume work and production according to the development situation of the epidemic. Local housing and urban-rural construction departments should keep abreast of the resumption of work and production in various industries, and guide and coordinate to solve the difficulties and problems encountered by enterprises.
(4) Accelerate the disbursement of subsidy funds. The local housing and urban-rural construction departments should guide and urge the projects that have been subsidized by the central and autonomous regions to resume work in time, understand the progress and existing difficulties of the projects, actively assist the construction units to strengthen communication and coordination with the local financial departments, and speed up the progress of project subsidy funds.
(five) the opening of the "green channel" for the approval of engineering construction projects. For general enterprise investment and construction projects that need to be started in 2020, the competent administrative examination and approval department should accept the vacancy according to the situation, speed up the examination and approval procedures for project commencement, and the quality and safety supervision, urban management and other departments should further take the initiative to follow up services. For the engineering construction projects necessary for epidemic prevention and control, the construction unit can start ahead of schedule when the engineering quality and safety guarantee measures are in place, and report to the competent department of housing and urban-rural construction where the project is located in time, and then go through the relevant formalities after the epidemic situation is lifted. Honest and caring enterprises that have made positive contributions during the epidemic prevention and control period will take measures such as opening up a "green channel" to give priority to handling, delaying the closure of the declaration channel, and guiding the declaration by special personnel, and actively help enterprises to do a good job in qualification declaration and other matters. Appropriately relax the conditions for enterprise credit repair.
(6) Accelerate the construction of affordable housing projects. Under the premise of strict implementation of epidemic prevention and control measures, projects with opening (re-opening) conditions should pay close attention to the organization of public rental housing infrastructure construction and shantytown renovation projects that are in urgent need of relocation and resettlement; Do not have the conditions to start (return to work), to prepare materials in advance, improve the relevant preliminary procedures, strengthen the coordination of engineering projects, and accelerate the project. The shantytown renovation project that started in time (resumed work) will be tilted when allocating the central subsidy funds for supporting infrastructure of affordable housing projects, and will be given priority in the scope of special bond issuance support for shantytown renovation.
(7) Adjust the phased policy of public rental housing. From June 5438+ 10 in 2020 to two months after the epidemic prevention and control was lifted, families who pay the rent for public rental housing overdue will not be treated as overdue and will not be included in their personal credit records. Conditional areas can appropriately expand the scope of monetized resettlement of public rental housing, include employees who have recently resumed renting social housing into the scope of protection, and issue housing rental subsidies during the epidemic prevention and control period; Give priority to providing affordable housing and public rental housing for qualified employees of honest and caring enterprises and those who participate in the frontline work of epidemic prevention and control. Support all localities to rent public rental housing in medical, sanitation, public transport, property and other industries involved in the front-line work of epidemic prevention and control, and reduce the rent by 1 to 3 months; If you receive the rental subsidy, you can pay an additional rental subsidy of 1 to 3 months; High-risk areas can appropriately extend the time for rent reduction or additional subsidies. We will continue to strengthen housing security for people in need, and appropriately reduce or exempt rents for families with financial difficulties. The above specific rules shall be formulated by all localities themselves.
(8) Keep the real estate market stable and healthy. Accelerate the pre-sale approval of commercial housing and the online signing of housing for the record, and maximize the efficiency of approval; Further optimize the filing process of housing online signing and reduce the filing time limit of housing online signing. During the epidemic prevention and control period, real estate development enterprises and intermediaries are encouraged to carry out sales and intermediary business through online sales platforms. Real estate development enterprises and intermediaries can make one-on-one appointments and sign contracts after they resume work according to regulations and implement epidemic prevention and control measures.
(nine) vigorously promote the construction of underground pipe network for three years. Vigorously implement the construction of urban underground pipe network projects such as water supply and drainage, municipal gas and underground common ditch. Accelerate the general survey and planning revision of underground pipe network. Vigorously implement the transformation of old, damaged and misplaced mixed pipe networks, as well as the diversion transformation of rainwater and sewage confluence pipes, strengthen the construction of pipe networks in blank areas of urban pipe networks, improve the efficiency of sewage collection, and meet the requirements of urban drainage and flood control. Actively promote the construction of the second and third batch of town-level sewage treatment facilities in the 13 th Five-Year Plan.
(10) Start the transformation of old urban communities in an all-round way. In 20 19, 27,800 renovation projects of old urban residential areas that received central subsidies were managed in advance, and the promotion measures and responsible subjects were clarified to speed up the project construction. For the167,000 urban old residential projects included in the 2020 renovation plan, all localities should go through the formalities before the project starts and investigate the residents' wishes, ensure that the annual renovation task is completed on time and with good quality, and complete the installation of 657 elevators and the construction of barrier-free facilities during the year.
(eleven) to ensure the normal production and operation of municipal public utilities. During the epidemic prevention and control, all localities should further strengthen supervision to ensure the stable operation of various municipal public facilities. Actively coordinate with relevant departments to actively protect the means of production and protective materials of municipal public facilities such as water supply, gas supply, domestic sewage treatment, domestic garbage treatment, sanitation and cleaning, and landscaping; If the cost and input cost are increased due to epidemic prevention and control, it is necessary to actively coordinate the fiscal and taxation departments to implement relevant financial subsidies and tax reduction and exemption policies, and allocate relevant service fees in full and on time. On the premise of ensuring the functionality and safety of municipal public facilities such as urban roads, bridges, tunnels, public lighting, landscaping, etc., the maintenance performance evaluation standards can be appropriately lowered, the maintenance operation methods and processes can be optimized, and maintenance units are encouraged to carry out inspections by means of information technology.
(twelve) to strengthen the collection and transfer of urban sewage treatment and domestic garbage. All localities should urge urban sewage treatment plants to do a good job in disinfection and sanitation and epidemic prevention, ensure that the effluent indicators meet the relevant discharge standards, and actively cooperate with the ecological environment and health departments to do a good job in the collection and disposal of medical wastewater. Further strengthen the supervision of the collection, transfer and disposal of municipal solid waste, prohibit medical waste and other garbage from mixing into the municipal solid waste treatment system, and resolutely prevent the secondary pollution caused by the untimely treatment of municipal solid waste.
(thirteen) decisive battle to win the battle against poverty and housing security. We will comprehensively verify the housing security situation of poor households who have set up a file to establish a card, and complete the task of rebuilding dilapidated houses in rural areas in 2020. Conduct on-site supervision, establish a normalized unannounced visit mechanism, continue to do a good job in rectifying the feedback from the central poverty alleviation special inspection, deepen the special governance of corruption and work style in the field of rural dilapidated housing renovation, and ignore the rectification of violations of the interests of the people. Issue policy documents to strengthen the management and control of rural housing construction, and improve the design and construction level of rural housing.
(fourteen) to carry out the three-year action to improve the rural appearance. The overall goal of the three-year action to improve rural appearance is to continue to carry out "three clean-ups and three demolition" environmental improvement, and build a number of rural appearance demonstration areas and demonstration villages with basic improvement, perfect facilities and excellent products. Taking epidemic prevention and control as a breakthrough, we will effectively strengthen the cleaning, collection, transportation and treatment of rural domestic garbage during epidemic prevention and control, and keep the environment clean and hygienic. Establish and improve the collection, transportation and treatment system of domestic garbage, and build 200 village-level collection, transportation and treatment facilities. Promote the establishment of four demonstration counties for rural domestic waste classification and resource utilization, and complete the remediation of all informal garbage dumps. 450 public toilets in more than 300 natural villages were renovated. Strengthen the protection and utilization of traditional villages.
(fifteen) to strengthen the law enforcement of urban management. Strengthen urban management law enforcement inspection, implement the "72 1" work law, and solve the problems reflected by the masses within a limited time. Actively cooperate with market supervision, commerce, forestry and other departments to crack down on illegal wildlife trading and ban illegal business outlets. Relying on the grid management mode, actively coordinate and solve the difficult and hot issues of urban management.
Third, fully support the development of the industry and reduce the pressure on enterprises.
(sixteen) properly handle the project delay. Construction units, construction enterprises, general contracting, municipal and fire control construction enterprises can apply the relevant provisions of force majeure in accordance with the law, properly handle the risk of construction delay caused by epidemic prevention and control, and reasonably extend the construction period according to the actual situation. If the tax cannot be paid on schedule due to the epidemic situation, it can actively coordinate the tax authorities to postpone the tax payment.
(seventeen) to provide a basis for the adjustment of project cost in a timely manner. If the price of labor and materials in construction projects has changed significantly due to epidemic prevention and control, and the corresponding adjustment method is not agreed or specified in the construction contract, the construction unit, the construction enterprise and the general contracting enterprise can apply the situation change according to the actual situation, and share the risk reasonably according to the principle that the price risk of labor and single material equipment is within 5% and the excess part is borne by the employer. For the projects that continue to be built during the epidemic prevention and control period, the special funds for epidemic prevention and control can be listed separately in the project cost, and the epidemic prevention and control expenses generated by the construction unit during the epidemic prevention and control period should be included in the project cost to be fully added. Construction project cost management institutions should increase the collection and calculation of construction labor, materials and equipment prices, timely release market price information and price warning, shorten the release period when necessary, and provide a basis for reasonably determining and adjusting the project cost.
(eighteen) to reduce the financial burden of enterprises. Construction enterprises that undertake new business temporarily do not charge bid bond. Encourage construction units to strengthen mutual assistance with construction enterprises and general contracting enterprises, share the loss of shutdown reasonably, increase the proportion of project payment through consultation, and speed up the progress of project payment; Conditional, through consultation between the two sides, can advance the project payment. Coordinate and arrange the surplus funds of Jian 'an labor insurance fee to subsidize the construction enterprises in our region for purchasing medical supplies, protective equipment and other necessary protective expenses.
(nineteen) reduce the cost of water and gas for enterprises. Local housing and urban-rural construction departments should implement the policy of "temporary price reduction of industrial and commercial service water in our district, with the price reduction range of 10% of non-resident water price (excluding sewage treatment fee) for 5 months". During the epidemic prevention and control period, the key supply enterprises stipulated by the state and the autonomous region shall strictly implement the "non-stop arrears supply" of water and gas.
(twenty) to relax the housing provident fund policy. Before June 30, 2020, enterprises affected by the COVID-19 epidemic can apply for holdover of housing provident fund according to regulations, and the deposit time during the holdover period is calculated continuously, which does not affect the normal withdrawal and application of housing provident fund by employees; After discussion and approval by the workers' congress or the trade union, the housing accumulation fund can be paid for the workers according to the local minimum wage standard. Workers affected by the COVID-19 epidemic will not be allowed to handle overdue treatment if they cannot repay their housing provident fund loans normally before June 30, 2020; For employees who have great pressure on renting houses, the withdrawal amount of renting houses can be appropriately increased and the withdrawal time can be flexibly arranged. Depositors who can't handle the deposit business normally due to the epidemic can make up for it within 3 months after the prevention and control of the epidemic is lifted.
(twenty-one) preferential policies for property service enterprises. Local housing and urban-rural construction departments should actively help property service enterprises involved in epidemic prevention and control to obtain corresponding subsidies from local governments, such as incorporating the first-line epidemic prevention and control in property communities into public fund management and introducing temporary financial subsidy policies. , and actively strive to enjoy preferential tax policies according to the standard of living service.
Fourth, improve the efficiency of administrative examination and approval.
(twenty-two) optimize the project administrative examination and approval and bidding services. Vigorously promote electronic tendering and bidding to ensure that the whole process of electronic tendering and bidding for engineering construction projects will be realized before May 30, 2020; Increase the intensity and scope of remote remote bid evaluation pilot, and strive to realize the normalization of remote remote bid evaluation of municipal housing projects in the whole region before 65438+ on February 30, 2020. Vigorously promote the online processing of relevant administrative examination and approval business, reduce the processing time limit, and improve the efficiency of administrative examination and approval. During the epidemic prevention and control period, the government service window of the Housing and Urban-Rural Development Department of the autonomous region provides telephone reservation service. Due to the epidemic situation, enterprises can't bring the original relevant materials to the site for handling, but they can submit the application materials by express delivery and implement "approval without meeting". Tel: 077 1-5595535, 077/kloc-077 1-5595842; for the appointment of administrative examination and approval of the housing and urban-rural development department of the autonomous region; Mailing address: the window of the Housing and Urban-Rural Development Department of the Autonomous Region on the third floor of Guangxi Government Affairs Service Center (address: No.6 Yibin Road, Nanning, zip code: 530028).
(twenty-three) the validity period of industrial enterprise qualifications and personnel qualifications can be extended. The validity period of the qualifications of real estate development, survey, design, construction, supervision, cost consultation, quality inspection and other enterprises and related personnel approved by the competent departments of housing and urban-rural construction at all levels in the region is 65438+120 to September 29, 2020, and enterprises can voluntarily apply for an extension to September 30, 2020.
- Previous article:What's a dog neck thingy?
- Next article:Four stages of Internet development
- Related articles
This year's English college entrance examination essay topic is what
- Which foods have better effects of potassium supplementation?
- Introduction of Li Deyin Wudang Taiji Sword
- JIYI belongs to what class of school
- What is the most dynamic area of development in our time
- Are people who engage in traditional culture artists
- How long is the shelf life of rice?
- What are the advantages and disadvantages of pure cotton quilts?
- How is The Book of Songs classified?
- What are the lovers' festivals in 2023?