Traditional Culture Encyclopedia - Traditional stories - Precautions for delivery of new houses: specific procedures and precautions for delivery.
Precautions for delivery of new houses: specific procedures and precautions for delivery.
Step: receiving the check-in notice
Usually, the time limit agreed by the developer is within 30 days after the notice is issued, and the buyers will arrange their own time. The notice of closing the house includes the time of closing the house, the payment of fees, and the handling of failing to close the house on time. Property buyers must pay attention to the inspection and don't miss the date of repossession.
Step 2: Check the information to ensure that the house meets the delivery conditions.
1 Completion Acceptance Record Form
The record form for the completion acceptance of housing construction projects and municipal infrastructure projects is the most important document in the process of housing expropriation. This form is formulated by the Ministry of Construction to standardize the record management of project completion acceptance, and will be completed within 15 days after project completion and filed with the construction administrative department.
In the Record Form of Project Completion Acceptance, as long as it is sent to the competent department for the record, the employer must be responsible for the property for life. Every item on the list must be reported to the relevant competent department for the record. If something is missing, is it property? Black building? Property buyers have the right to refuse.
2, "residential instruction manual"
Instructions for the Use of Residential Buildings is a description of specific technical indicators in the design, construction and acceptance of houses, such as seismic indicators and wall structure types, and matters needing attention.
3, housing "residential quality guarantee"
"Residential quality guarantee" is the developer's commitment to housing quality and warranty period and scope. It must be an annex to the purchase contract and have the same effect as the purchase contract. So remind me to check the specific terms carefully and pay special attention to the warranty period.
4, the measured area table/surveying and mapping units measured area list (can be a copy but should be stamped with the official seal).
5. Completion drawing of pipeline distribution (water, strong electricity, weak electricity, structure)/project completion drawing or design unit construction drawing (can be taken away).
6. Construction engineering quality certificate.
7, "real estate development and construction project completion comprehensive acceptance certificate".
Step 3: House inspection
Property buyers must accept the house before acceptance, and never sign the "House Key Receipt" before acceptance. According to the provisions in the Interpretation of Several Issues Concerning the Application of Law in the Trial of Commercial Housing Sales Contract Disputes, the house has been delivered even if it is turned over. If the house is inspected only after the key is taken, even if there is a problem, the developer only needs to bear the responsibility for the quality of the house.
1, house area detection
Property buyers require developers to issue a survey report on the measured area, and check whether there is an error and the range of error rate between the measured area and the sales area according to the professional measurement unit affiliated to the Housing and Land Administration Bureau. If the measured area error exceeds 3%, the house can be closed.
2. Check the quality of the house
Property buyers in the inspection of housing quality, specifically to check the quality of the house itself, but also to see whether the landscape greening, residential facilities, facilities standards and other supporting facilities meet the contract, in addition to checking whether the decoration quality meets the standards or agreements.
Step 4: Sign the house acceptance handover book.
Property buyers to check the housing and property rights, that meet the agreed conditions, you can sign the "Housing Acceptance Handover" with the developer.
Property buyers still have questions or dissatisfaction, should be recorded in the housing acceptance handover book, as a written basis. If the relevant forms are not reserved for filling in the house acceptance handover book, the buyers should send their opinions to the developers in another written form.
- Related articles
- Different styles of ceilings at the top create different styles of living rooms.
- New Energy Vehicle Industry Development Plan" is released, supporting the transformation of new energy electrification
- What will be the employment situation of various industries in the next few years?
- Characteristics of Northeast Yangko
- Why doesnĄ¯t Korea have a large kitchen knife?
- What were the names of the ancient sun and moon? There are several names.
- Understanding of Poetry and Poetry of Love
- 10 coupe and SUV models at once!
The cheapest one starts at 120,000 yuan and the most expensive one is 1.35 million yuan. Which one is best for you?
- Characters experience, Zhou Lei
- What principles and methods should be followed in the protection of historical and cultural cities?