Traditional Culture Encyclopedia - Traditional stories - What are the contract management modes of construction projects?
What are the contract management modes of construction projects?
That is, design-bidding-construction mode. This management mode is the most common in the world, and it is adopted by the World Bank, ADB loan projects and projects based on FIDIC contract conditions.
2.CM mode:
Also known as stage contract method, the owner hires a consultant with rich construction experience at the beginning of the project, that is, CM manager, to participate in the project and be responsible for the management of the whole design and construction process. It broke the continuous construction mode of bidding after the design drawings were completed.
3. Design-construction method:
That is, after the principle of the project is determined, the owner only chooses the only entity to be responsible for the design and construction of the project. The design and construction contractor is not only responsible for the cost of the design stage, but also can select subcontractors through bidding or use the company's professionals to complete the project, including design and construction.
4. Turn-key mode:
It is a special design and construction method, that is, the contractor provides the owner with a full set of services including project feasibility study, financing, land purchase, design, construction and handover to the owner after completion.
5. Transfer mode of construction and operation (BOT mode):
The build-operate-transfer model is called BOT model. BOT mode is a project management mode that arose abroad in 1980s and relied on private capital to carry out government infrastructure projects or privatize state-owned infrastructure projects.
6. Project contracting mode:
PMC mode for short. That is, the owner hires a professional project management company to manage and serve the whole process or several stages of project organization and implementation on behalf of the owner.
Legal basis: Article 33 of the Building Law of People's Republic of China (PRC) * * * Before the implementation of construction project supervision, the construction unit shall inform the supervised construction enterprise in writing of the entrusted project supervision unit, supervision content and authority.
- Previous article:Introduction of one-day tour in Suzhou
- Next article:Classic quotations from Soros's famous sayings
- Related articles
- Deer ginseng peptide solid drink is real or fake
- You'll never believe how beautiful western Sichuan is in winter.
- Teacher Shen Liming of Liming Hall: Digital Informatics: Carry forward the classics of Chinese studies and inherit the traditional culture!
- Suggestions on evaluating the advantages and disadvantages of old teachers' lectures
- Can you give us an example from your life to illustrate your understanding of the "Middle Way"?
- Is Kunming Miss Karen Beauty School reliable?
- What are the scenic spots in Hubei Hubei top ten attractions introduced
- What are the sentences describing the Youth League?
- Learn traditional skills to promote entrepreneurship and employment
- Comments on the difficulty of Chinese test questions in Chengdu senior high school entrance examination in 2022