Traditional Culture Encyclopedia - Traditional stories - Installation of clothes hangers on balcony side
Installation of clothes hangers on balcony side
The installation of clothes hangers on the balcony plays an important role in life. It is one of the furniture with high frequency in modern home use, and can be placed directly indoors or outdoors, which is very convenient. The installation and sharing of drying racks on the balcony are as follows.
Install the balcony side hanger 1 1. Disassemble the hanger first, check whether the parts of the hanger are complete, and prepare to install tools. Use a measuring tool to confirm how long the cross bar of the hanger is, and the width of the clothes is generally between 30 and 45 cm. One cross bar is about 30 cm away from the wall, the distance between two cross bars is about 45 cm, and the right cross bar is about 30 cm away from the wall.
2, but this still depends on the specific installation location. Clothes hanger should be installed in the whole space, in the middle, left and right, front and back symmetry, so it will be more beautiful to install. However, pay attention to the spacing of the above distance, at least to reach the above space, which is convenient to use after installation. After determining the left and right positions, we need to measure the front and rear positions. The general clothes rack is 2.4m standard. If it is this length, the front and rear positions are two fixed points, and the distance is1.8m. ..
3, determine the point, determine the position of the front, back, left and right, you can determine the position of the four installation fixed points. When installing the transmission wheel, at the top, pay attention to the fact that the hand crank must be in a straight line within one day, so that the positions of the five components are basically determined.
4. It should also be noted that the above guide wheels are different, and attention should be paid to those with directions. Finally, we have to wear steel wires to fix the crossbar.
How to install the balcony drying rack?
1. Install the balcony ceiling drying rack. When installing the top seat, we need to know the diameter of balcony lighting, then make an installation mark on both sides of 15-30 cm, and then measure the distance from the number to the balcony edge.
Then use this distance to determine the width of the top seat, then measure the length of the balcony with the lamp as the center, and then determine that the two sides of the lamp are equally divided into 80- 100 cm according to the length of the clothes rack, and then there are four intersections with the measured distance of the width, which is the installation position of the top seat of the clothes rack.
2. After the position is determined, start drilling with an electric drill, and then fix the four top seats with expansion screws, which can be adjusted according to the actual length. Two top seats near the crank angle are movable ends, and the other two top seats are fixed seats. The difference between them is that they are connected with movable seats, which must be installed in the front.
There is a steel wire on the hanger. You can take out a steel wire first, first pass one end of the steel wire through the bearing steel wire groove at the corner, then pass through the steel wire groove of the rotating shaft of the movable end top seat, then pass through the bearing steel wire groove of the fixed end top seat to be vertical to the ground, and then insert the top cover from the steel wire.
4. The next step is to install the corner of the balcony drying rack, which can be installed on the balcony roof or on the top of the wall. The corner is 50-70cm away from the movable top seat, but it must be triangular in the middle of the movable top seat and keep a unified vertical line with the position of the installation hand. You can refer to the drawings if you don't understand.
As for the threading method of the second steel wire, it is almost the same as the first steel wire. Thread a hanging ball at the head end of each steel wire, tie a knot on the hanging ball, then pull the hanging ball to the top seat, tighten it, and finally install plugs at both ends of the drying rod.
A clothes rack 2 is installed on the balcony side. Installation method of sunshine clothes drying rod
1, installation of hand crank
The hand shake is generally installed on the right side of the balcony, which is convenient for habitual use. The distance from the ground is generally 120cm, depending on the user's height. Fix with expansion screws.
2. Installation of the top seat
At the top of the balcony to be installed, measure the diameter of the lighting lamp at the top of the balcony with a steel ruler, and then mark the installation between the two sides of the lamp 15cm-30cm (the length depends on the size of the balcony). Then measure the distance from the mark to the balcony edge, and determine the width of the top seat installation according to this distance. Then measure the length of the balcony with the lamp as the center. According to the length of the clothesline, it is determined that the two sides of the lamp are equally divided into 80 cm- 100 cm, and there are four intersections with the measuring distance of the width.
These four intersections are the installation positions of the hanger top seat. After the position is determined, drill a hole with an electric drill. After drilling, fix the four top seats with expansion screws (if the rod length exceeds the normal size, adjust the distance accordingly).
Note: The two top seats near the crank angle are movable ends. The other two top seats are fixed seats. The difference between the two is that the movable seat is two-wheeled, and the movable seat must be installed in the front.
3. The installation angle can be installed on the roof or wall of the balcony. The corner is 50-70 cm away from the movable top seat, and it must be triangular (45 degrees) in the middle of the movable top seat, keeping the same vertical line with the installation position of the hand. Please refer to the drawing.
4, steel wire connection
A coat hanger has two steel wires. Take out a wire first. First, pass one end of the steel wire through the bearing steel wire groove at the corner, then pass through the bearing steel wire groove of the movable end top seat (located at the upper part of the top seat), then pass through the bearing steel wire groove of the fixed end top seat, so that the steel wire is vertical to the ground, and then insert the top cover from the steel wire to clamp the top seat cover.
The other end of the steel wire also passes through another hole of the bearing steel wire groove at the corner, and then passes through the bearing steel wire groove of another movable wheel of the movable seat (below the same top seat) so that the steel wire is vertical to the ground, and then the top cover is inserted through the steel wire and clamped. The installation method of other steel wires is the same.
Step 5 dry the connection
At the head end of each steel wire, thread a hanging ball and tie a knot on the hanging ball; Then pull the hanging ball to the top seat, and then pull the steel wire from the corner to form a double-stranded steel wire, which is clamped at one end of the handle; Loosen the steel wire in the crank handle, put down the hanging ball, pass the drying rod through the hanging ball, then tighten and fix it at the hole of the hanging ball, and nail the screw; Finally, plugs are installed at both ends of the drying rod.
Second, the clothes rod installation matters needing attention
1, many people think that the balcony ceiling should be installed first, and then the lifting clothes rack and curtain slide rail should be installed. In fact, this view is wrong The correct way is to install the clothes rack first, and then carry out the balcony ceiling.
2. When installing the lifting clothes rack, if you want to carry out the balcony ceiling, you must first fix the ceiling with steel bars, and ensure that the length of steel bars can expose the ceiling 1 ~ 2 cm.
After hanging, install the hanger on the steel bar to facilitate future maintenance. It should be noted that the ceiling is not load-bearing, and the clothes on the hanger are relatively heavy, so it must be fixed on the floor or beam to be safe. Therefore, no matter what method is adopted, structural bearing must be adopted. The balcony drying rack has been installed.
3. The installation points of the lifting clothes rack are four top pulleys, a corner device and a hand crank, which need to be fixed on the ceiling and wall. Specifically, the four jacking pulleys should be installed on a plane, and there should be no obstacles between them, so as not to affect the sliding of the wire rope. The ceiling plane should be at right angles to the wall where the hand crank is installed, so as to ensure that the wire rope is always in the center of the pulley during the sliding process, so that the pulley is evenly stressed and rotates normally.
- Previous article:What villages are there in Longpan Township, Lijiang City?
- Next article:The difference between Wuliangye and general liquor
- Related articles
- The Development of China Historiography in Qin and Han Dynasties
- Deepen the strategy of "branding" and start brand upgrading from the four generations of new image stores in Wan Ding.
- What festival is autumn?
- What words can be used with the word ship?
- Potato tubers can sprout, take root and grow into new plants. This reproduction mode belongs to () A. Bud reproduction B. Asexual reproduction C. Sexual reproduction D.
- What places make brown sugar? What is the difference?
- Tie-dyeing, art teaching plan for large classes in kindergarten
- What is the development trend of auto parts industry
- What are the connections and differences between children's stories and children's novels?
- Handwritten newspaper related to the third grade festival.