Engineering construction is an art, which requires construction personnel to have rich experience and skills. This paper will introduce the construction process of floor installation and the characteristics of anti-static floor to help readers better understand the skills of engineering construction.

Check whether the foundation is solid.

Before construction, the flatness of the ground and the verticality of the wall must be checked to ensure a solid foundation. This is the foundation of floor installation and the key to ensure the construction quality.

Measure the dimensions and mark the installation height.

In the process of construction, it is necessary to pull the horizontal line, measure the indoor size, and mark the installation height of the floor with ink lines to ensure the overall level. This is the basic step of floor installation and the key to ensure the construction quality.

Select the appropriate reference position.

In order to reduce floor cutting, it is necessary to choose a suitable reference position and locate the mounting bracket with grid lines. This can ensure the overall beauty of the floor and improve the construction efficiency.

Adjust the height of the bracket evenly.

When installing the bracket, it is necessary to uniformly adjust the height of the bracket and place it at the intersection of the ground grid lines. Then use screws to fix the beam on the bracket to ensure that the beam is on the same plane and perpendicular to each other.

Lay the floor carefully.

When laying the floor, you need to put the floor on the beam with a board absorber and lay it carefully. If the wall size is not suitable, you can cut off the floor to make up for it.

Leveling the floor

After the floor is paved, it needs to be leveled block by block with bubble level, and the floor level is adjusted by the height of the bracket. This is the key step to ensure the flatness of the floor.

Add support

When placing heavy equipment in the computer room, it is necessary to install a bracket under the floor of the equipment base to prevent the floor from being deformed. This is a key step to ensure the service life of the floor.

A cut or perforated raised floor.

For the raised floor that needs to be cut or punched, use an electric drill to drill ◎ 6-◎ 8 round holes at the corner of the opening to prevent the veneer from breaking. This is a key step to ensure the beauty of the floor.

Characteristics of anti-static floor

The wear resistance of antistatic floor makes its price higher than other floors. In international standards, products above 4000R are suitable for families with conditions, while public places need to reach10000 r ... the space range of anti-static floor is between 4000R- 18000R, which pays equal attention to safety and convenience.