Traditional Culture Encyclopedia - Traditional stories - Introduction to the management process of the decoration company What are the business processes?
Introduction to the management process of the decoration company What are the business processes?
Generally speaking, homeowners who renovate their houses will hire a renovation company, not only because the renovation company is more professional, but also because it integrates design, budget, construction and materials. The following will introduce you to the business process of the renovation company as well as the management process.
Decoration company management process
Every decoration company management process is not uniform, the following only as a reference:
I. Owners step by step quality recognition system
II. Customer counseling
Three. Visiting projects in progress
IV. Home measurement
V. Remodeling company to draw floor plans and make a preliminary budget
VI. Homeowners modify and identify
VII. Decoration company draws detailed drawings
VIII. Both sides signed a construction contract, the customer delivered the first installment
9. Decoration company to supervise the owner of the project file
X. Design a handover
xi. Design on-site delivery
XII. Construction of money and materials
thirteen. Construction team to enter the site, start the foundation construction
XIV. Supervision of construction quality
xv. Concealed works and water closure test
XVI. Construction of the first half of the project
XVII. Decoration company by the designer to do a midterm budget
18. Doing mid-term preliminaries
XIX. Designer and owner communicate on site
20. The project manager notifies the owner to deliver the interim payment
xi. Conducting the second half of the renovation project
xii. Acceptance of renovation in stages
xiii. Quality inspector notifies customer service department that site visit is available
xiv. Telephone visit to and communication with homeowners
XXV. Decoration project additions and subtractions
XXVI. Settlement of project completion
XXVII. The customer pays the final payment
XXVIII. Decoration company to send the customer warranty
XXIX. Enter the warranty service period
Decoration company business process
Customer consultation → the launch of the transparent offer, out of the basic offer, entrusted to the design → the decoration company door-to-door room measurement deposit collection → out of the design plan and detailed offer → customer review and confirmation of the program → sign the contract for the renovation (pay off the down payment) → preparation for the construction → the site of the delivery → the acceptance of materials into the site → both sides to monitor the Material acceptance → both sides to supervise the construction → for change procedures → hidden works acceptance → overall acceptance → terminate the contract and settle the final payment → into the warranty period
I. Home decoration consulting:
1. Decoration company to negotiate with the owner, the owner informed of their own requirements for the decoration;
2. Decoration company in the receipt of the owner's floor plan, the designer will go to the site, familiarize themselves with the environment and check the feasibility of the owner's requirements, and will be initially selected to give samples of materials.
II. On-site measurement: the decoration company goes to the site to conduct a survey, according to the comprehensive situation to the home furnishing design.
three. Budget assessment: according to the owner's choice of decoration style, the decoration company to design, and then feedback from the owners, and finally the design program, drawings and related budget to determine.
IV. The signing of the contract: homeowners and the decoration company on the house design program and budget confirmation, sign the relevant contract, which specifies the rights and obligations of both parties.
V. On-site briefing: owners, designers, engineering supervisors, construction managers at the site of the renovation, and by the designer of the renovation budget items, drawings, special processes to the construction manager, and coordination of the relevant procedures.
VI. Material acceptance: home improvement materials into the field need to be accepted by the owner, after which the decoration work can be carried out.
VII. Interim Acceptance: This part of the parties involved in the owners, designers, engineering supervisors, construction managers, in the decoration acceptance of the results of the qualified, you need to sign the quality report to confirm.
VIII. Final acceptance: the parties involved are owners, designers, engineering supervisors, construction managers, the need for renovation of materials, design, quality of workmanship overall acceptance, acceptance of qualified after signing the confirmation.
9. Completion of the project: to be completed, need to clean up the construction site, the site will be cleaned up garbage.
The above is about the decoration company management process, business process what all the introduction, I hope to help you! Renovation company management process and business process every renovation company is not uniform, the above content can be used as a reference to understand the management and business process of the renovation company.
Tubapu online free for everyone to provide "each decoration offer, 1-4 local decoration company, 3 sets of decoration design program", and decoration to avoid pit strategy! Click on this link:/yezhu/zxbj-cszy.php?to8to_from=seo_zhidao_m_jiare&wb, you can get it for free Oh~
- Previous article:Virtual Operators (A New Force to Change the Traditional Communications Landscape)
- Next article:What brand should I buy cropped trousers?
- Related articles
- A detailed explanation of what a military commander can do.
What are the roles of military commanders in Heroism of the Three Kingdoms? How much can a military commander improve the battle in th
- Can an allergic person do buried weight loss?
- What's in Jiangmi Guili?
- How are fingerprints identified?
- The network explanation of crosstalk what is the network explanation of crosstalk
- How many miles is a kilometer, how many meters is a mile, what are other units of length, and how to calculate them! ! !
- What is the level of touching the guzheng at the national music ceremony?
- What are the main elements of Chinese style?
- The method of making old bread is simple and delicious. The method of making old bread is simple and delicious.
- How much work can a bow with 50 pounds of tension do when it is fully stretched?