What is the bidding procedure of the project?
First, report to the bidding management agency for construction;
2. Approve the bidding method and scope;
Third, prepare the tender documents;
Four, determine the bidding agency;
Five, issued a tender announcement or invitation to bid;
The qualification examination of intransitive verbs bidders;
Seven, send the tender documents;
Eight, bid opening, bid evaluation, and submit the bid evaluation report;
Nine, determine the winning bidder;
Ten, issued a letter of acceptance;
XI. Signing a contract.
Invite manufacturers who are willing to contract or engage in trade to bid for engineering construction or commodity trade, so as to choose the behavior of contractors or traders. The general procedure is as follows: the tenderer advertises or selectively invites relevant manufacturers, sends bidding documents or attaches drawings and samples; Bidders shall submit bid documents as required; Then, under the auspices of a notary public, the bid opening and evaluation will be conducted in public, and those who fully meet the requirements will be the winning bidder; Finally, both parties sign a contract or a transaction contract.
For simple bidding:
Simple bidding procedures are adopted for projects with small amount, and the bidding requirements can be fully expressed in the bidding announcement; Bidders may prepare bidding documents in accordance with the requirements of the tender announcement.
1, the tenderee sends a bid invitation to more than three qualified potential bidders.
2. The tenderer prepares and publishes the tender documents, and at the same time submits the tender documents to the tender office for the record.
3. Establish a bid evaluation committee. The personnel of the bid evaluation committee shall be composed of more than 5 people in odd numbers, among which the expert judges shall not be less than two thirds of the total number of members, and shall be randomly selected from the bid evaluation expert database half an hour before the bid opening under the supervision of the staff of the bidding office.
4. Bid opening. The tenderer will hold a bid opening meeting in the bidding service center, and the deadline from issuing the bidding documents to accepting the bidding documents is usually 7- 10 days depending on the project situation.
5. Bid evaluation and calibration. The bid evaluation committee conducts bid evaluation according to regulations, recommends candidates for winning the bid, and the tenderer determines the winning bidder according to regulations.
6. Issue a letter of acceptance. The winning result will be publicized in the bidding service center for 2 working days. If no complaints are received, the tenderer may issue a letter of acceptance.
7. sign a contract.
: Information required for public bidding:
1, preliminary design approval or scheme approval (if planning permit is required);
2. Bank capital certificate (original);
3, project construction public bidding approval registration form (in triplicate) (city bidding network download);
4 tender announcement (in triplicate);
5, bidding agency contract (with agent list) or self bidding license;
6, the excavation depth of more than 5 meters, need to provide foundation pit enclosure scheme;
7. Decoration projects need to provide housing property certificates and lease contracts; Without obtaining the property right certificate, the original planning permit, bid-winning notice, construction permit and completion acceptance report of the project shall be provided. If the renovation project changes the facade, it is necessary to provide a planning permit;
8. For a construction project subject to public bidding, if the tenderer prequalifies the bidding applicant, it shall first submit the prequalification application report and prequalification documents, and then enter the construction application procedure after approval.
Legal basis: Article 8 of the Measures for Tendering and Bidding of Construction Projects stipulates that a construction project that must be tendered according to law shall meet the following conditions before it can be tendered: (1) The tenderer has been established according to law; (two) the preliminary design and budgetary estimate shall go through the examination and approval procedures and have been approved; (3) There are corresponding funds or sources of funds that have been implemented; (four) there are design drawings and technical data required for bidding.
- Previous article:Why are there two fried dough sticks? Why can't it be fried?
- Next article:What are the basic norms of family virtue?
- Related articles
- Profit model and sales model of Jingdong Mall
- What do you know about EPE pearl cotton?
- Four-character idioms about Lantern Festival and Spring Festival
- The black leather shorts in the gym are shared by handsome guys.
- Home decoration: the charm of landscape painting
- China ancient art style, tradition
- What ceramic cup is good? How to choose?
- She nationality's spring outing composition
- What three networks does triple play refer to?
- How to disassemble the shell of Vantage water heater?