Traditional Culture Encyclopedia - Traditional culture - How to install a triple track linkage sliding door?
How to install a triple track linkage sliding door?
1, install door hardware. Three linkage glass sliding door before installation, people need to connect their corresponding hardware respectively. People first to the first door and the second door installed on the long base and the base, and to ensure that the extension of the base can be parallel with the entire outer edge of the door, including the long base with a buckle to correspond to the outer edge of the region into and tighten the screws. Installation of the third door of the short base, people need to pay attention to the short base of the screw holes should be 43 millimeters away from the edge of the door with.
2, install synchronous belt. Next, people need to install the synchronous belt, the belt can ensure that people push one of the door, the other door can be synchronized to open and close, thus ensuring that the door can be opened and closed properly. Synchronous belt installed in the top of the three doors, and the size of the synchronous belt must be appropriate, if the size is not adapted to the synchronous belt for cutting, cutting and then installed to the door above.
3, the installation of guide accessories. Guide fittings can ensure that the three linkage sliding door in the closing and opening according to the fixed track movement, which can avoid the door offset and shaking, but also can play a fixed role in the door. Guide fittings installed at the bottom of the door need to be fixed with screws, but if the door has been punched before the holes can be fixed directly, if not, you need to mark the screws and drill holes, and then fixed fittings.
4, slide rail installation. Slide rail installation needs to be fixed according to the width of the door and open the direction of the door beam, generally to the center of the door width fixed on both sides. It should be noted that the height of the left and right sides of the connection between the slide rail and the door beam should be constant, and the center line of the slide rail should be consistent with the size of the color plate outer wall.
5, door installation. After the sliding track installation is completed, people can fix the door fan to the top of the track. Before installing the door, people have to install the roller inside the original track, and then the bolt on the roller is stuck into the base of the door, and fixed in the same way. After the three doors are fixed, guide blocks are installed on the bottom of the doors. After that, people have to connect the three doors, install the base on the edge of the track, install the door stop after the door is installed, the whole three linkage sliding door installation is completed.
People install three linkage sliding door, if it is hanging sliding door, should be installed first guide rail box. When installing the rail box, pay attention to the size, do not exceed the length, do not exceed the width.
- Previous article:How do you say China in Japanese?
- Next article:How do merchants solve the traffic problem in the WeChat ecosystem?
- Related articles
- How to create a good sleeping environment for your baby?
- Nubian Z40 Pro Evaluation: The humanistic photography under Sony's customized lens is more SLR.
- Real Estate Marketing Strategy Essay
- "Wonderful Opera" lecture notes
- Main line of family-friendly two-person New Year pictures
- What does the traditional festival text express?
- What is there to do near Lijiang?
- Talk about your understanding of the paradigm of communication studies research from a methodological point of view.
- What should I pay attention to when I finish body odor surgery? Is body odor easy to recur?
- The most famous marinated beef