Traditional Culture Encyclopedia - Traditional customs - Business environment self-examination report
Business environment self-examination report
Business Environment Self-Investigation Report Sample (Selected 5)
Inadvertently, a period of time has come to an end, reviewing the work over this period of time there are achievements and shortcomings, it's time to properly record in the self-inspection report. Then the general self-examination report is how to write it? The following is my collection of business environment self-examination report model (selected 5), for reference only, welcome to read.
Business environment self-examination report 1
In accordance with the "China *** Kandian County Committee, the county people's government on further strengthening the optimization of the business environment construction of the views" deployment and "xx County to strengthen the optimization of the business environment construction and implementation of the "eight where" requirements for special remediation and implementation of the program" self-checking and rectification stage of the task requirements, the xxx township government seriously against the "eight where" requirement. xxx town government seriously against the "eight is" requirements, in March 19, March 28 were held in the party and government leadership team will be held; meeting and the town town and village cadres conference, to convey the relevant documents and the spirit of the meeting, combined with the actual comprehensive arrangements for the layout of the town to optimize the business environment of the activities of the relevant matters, in March 30 held a meeting of the relevant stations and offices The person in charge of the meeting, according to the actual work, against the list of issues for self-correction, now the relevant information is reported as follows:
A self-checking situation
(a) self-checking, the town is not inconsistent with national laws and regulations of the rules and regulations, documents, and does not exist in the local introduction of policies and regulations and the phenomenon of national legislation contradicts the phenomenon.
(ii) I do not have a legal basis for approval, review, investment restrictions, qualifications, intermediary services, administrative fees. Undertake to decentralize the performance of all in place, there is no enterprise-related project approval scope, pre-conditions, multiple approvals, multi-departmental seal, approval conditions and standards are not clear, the review cycle is long, intermediary services are not standardized, the project record in disguise to become an administrative licensing phenomenon. Approval service windows are in accordance with the "three program" to properly perform their duties, the realization of "one-stop service", the approval of the window units of the service procedures and standards open and transparent, the implementation of the information disclosure system, a one-time notification system, the first system of responsibility, the service commitment system, accountability system and civilized service system, the approval of the system, the approval of the system, the system of accountability and civilized service system, the approval of the system. The system of accountability and civilized service system, the approval of service personnel policy level, business, service in place, no laziness, shirking of responsibilities and other issues.
(3) No barriers to entry that impede the development of the private economy and limit the entry of private enterprises and foreign enterprises into the local market. Bidding for infrastructure projects and government procurement projects are all open and fair, and fair competition among all types of market players has been realized.
(d) No government encroachment on corporate property. The government departments have not abused their power, utilized their public authority, illegally seized and froze the property of enterprises, refused to execute the court's judgment, borrowed funds from enterprises, occupied the funds that should be allocated to the enterprises according to the law, as well as the taxes and fees that should be refunded to the enterprises according to the law, the land premiums, the security deposits, the governmental funds, and subsidized funds.
(e) No violation of the act of increasing the burden on enterprises. No violation of the provisions of the list of administrative fees and charges directory and fee standards, the establishment of additional charges and high charges, mandatory or disguised forced enterprises to pay dues, activities, in violation of the provisions of the evaluation, standardization, appraisal and other activities, no requirement for enterprises to accept paid publicity, no mandatory enterprises to buy designated goods, accept designated services, to the enterprise to ask for the product or mandatory purchase of products at a low price, and other issues.
(F) in the law enforcement process did not have to enterprises do not make plans, not approved, not publicly announced and arbitrarily punished. The administrative law enforcement personnel of the sense of public servants, personal qualities and law enforcement level of training and learning, administrative law enforcement personnel did not abuse their powers, "indiscriminate fines, indiscriminate" "eat, take, card, ask for" and so on.
(VII) no specific industry service irregularities. The service standards, tariffs and related regulations of government departments are open and transparent, and the work rules are implemented in place.
Second, the next step of the work intention
The next step, xxx township government will be in accordance with the requirements of the remediation work, the optimization of the business environment related to the implementation of the work.
(a) Strengthen the organizational leadership, sound institutions and personnel.
(a) Strengthen organizational leadership, sound institutions and personnel. In order to really grasp the business environment, the town party committee and government set up a leading group to optimize the business environment, by the party secretary, the mayor of the town, deputy secretary of the party committee, deputy mayor in charge, secretary of the Discipline Inspection Commission as deputy head of the party and government leadership team members for the group members to implement the responsibility to the person. At the same time, the staff was drawn to set up an inspection team, responsible for the entire activity.
(ii) combined with the actual, good publicity and mobilization. In the future will continue to hold various special meetings, clear to carry out the optimization of business activities of the purpose and significance, time requirements, methods and steps, the need to reach the goal, etc., requiring the majority of cadres to further emancipate their minds, improve the awareness of the service from the party committee, the government's services, guidance and other functions: aspects of the further optimization of the further sound and further improve the quality of service, create a good development environment, promote the town's economic development, good and fast development.
(C) carefully organized to achieve the program specific and practical. Combined with the duties of the xxx town government departments, the town's various stations and offices, departments to further clarify the ideas, clear service content, make a service commitment, the units and departments, combined with their own positions, seriously write "job duties" and "service commitment", posted on the office door to facilitate the work of the mass contact to strengthen the education of administrative law enforcement personnel, improve their sense of public service, personal qualities and law enforcement level, to eliminate interference with Normal production and operation of enterprises and "eat, take, card, want" and other phenomena.
(D) adhere to the "three combinations" to promote the optimization of business activities.
First, combine the activities with accelerated development. The town government requires all units of the town, the village committee should be based on their own reality, to further invigorate the spirit, inspire the earth, creative work, and strive to focus on breakthroughs, the overall work on the level.
Secondly, the activities and maintenance of stability is decided. The current social contradictions are very prominent, there are still many factors of instability. In the activities, we should put the maintenance of stability in an important position, and further strengthen the comprehensive management of social security, further from the basic work, from the root of the measures to start, attach great importance to and do a good job in the work of letters and visits, the full implementation of the party in the rural areas of the ` policies, and actively study and solve the practical problems involving the interests of the masses of farmers, and strive to create a good social environment.
Third, the special activities and grasp the current work, solve practical problems, to ensure the completion of this year's work objectives and tasks combined.
Coordinated arrangements, carefully organized, and correctly handle the relationship between the central work and special activities, to do the work and special activities to promote both.
(E) the implementation of performance appraisal, serious accountability.
In accordance with the requirements of the x superior, to strengthen the optimization of the business environment construction work into the party committee, the government's performance appraisal, into the leadership team and the leadership of the Department of thousands of important performance appraisal. Establishment of accountability mechanism, any violation of the provisions of the optimization of the business environment, all accountability, serious treatment.
Business environment self-examination report 2In order to continue to optimize the business environment, to promote the reform of enterprises and the public sense of access to continuous improvement, Panjin City to create "the province's best business environment city" written into the 20xx government work report, and identified as the goal of this year's task. Recently, the National Bureau of Statistics Panjin survey team on the Panjin city business environment construction situation of field visits and research, now the relevant information is reported as follows.
First, the current situation of the business environment construction
1. The first to participate in the creation of the national integrated online government service platform version 2.0.
First, Panjin is the first city in the province to achieve online government service port coverage to the city, county (economic zone), town streets, village (community) four levels of 600 government centers, and further promote the city's regional government service window flattening, integration of business linkage; secondly, the co-ordination of scheduling of the counties and districts, Liaodong Bay New District and 44 municipal (in the province) departments to focus on the study and completion of the 2 batch of **** Counting 4355 items of government services combing and clerical guide entry work; Third, through the entry of the elements of the matter subdivided into the "smallest granularity", the exhaustive preparation of each scenario of the window acceptance criteria, background approval processing procedures and service recipients guide, the city's online efficiency has been greatly improved.
2. adhere to the national pilot construction of government services standardization, at the forefront of the province.
First, through the persistent implementation of the construction of the implementation of the center to achieve the center of government services for the time limit for the compression rate of 38%, the application for the reduction of the rate of 30%, improve the effectiveness of the service; second, through the preparation of standardized operating manuals, guide the window staff according to the standard to do the work, to put an end to the past, "the mood of the standard" and "experience standards" and "the standard". "Experience standard", the realization of the whole chain of standardized operation of business processing; Third, by carrying out more than 1,500 times of grooming, service norms and business processing and other special training, to achieve the window according to the standard service; Fourth, through the service line according to the reasonable layout of the service area, according to the demand for service reasonable increase in the installation of service equipment, according to the service guide Reasonable configuration of the service mark, according to the service feeling reasonable standardization of service behavior, the comprehensive use of standardized means to improve the quality of government services.
3. Efforts to promote the flattening of government services to implement the nearby "through the office" of the people's livelihood.
First, to let the masses do "not run more than once" as a starting point, borrowing the municipal government work report deployment near the "through the office" of the people's livelihood, the development of "Panjin City," to promote "government matters near the office, to facilitate the masses to do" people's livelihood, the development of the "government matters near the office, to facilitate the masses to do" people's livelihood. Convenient for the public to do" livelihood affairs work program ", and actively promote the city within the scope of breaking the hierarchy, geographical restrictions, change the government services in accordance with the jurisdiction of the traditional mode of application and acceptance, change the" hierarchical examination and approval "for" flattened service ", and strive to achieve enterprises and the masses to do "close to do, more points can be done, less run fast do"; Second, the city's first 211 applications for the proximity of the city's first 211 "through the implementation of the matter has been formally announced, the first to realize the province 17 The first 17 human resources and social security matters in the province to realize the "whole city".
4. Relying on the integration of integrated windows, to promote the high-frequency matters "most run once".
First, actively promote the setting of people's livelihood, social, business registration, engineering and construction, cross-domain acceptance and unification of six types of "integrated window", the city, county and district government halls generally carry out the "foreground integrated acceptance, backend classification examination and approval, the window unification of documents "integrated service model since the trial run, to a certain extent, reducing the number of enterprises and the masses to do things in more than one window to run back and forth; Secondly, the "Panjin City to promote high-frequency matters," the implementation of the work program "is to seek the views of the counties, municipal departments, to be on the city and county areas of each of the 100 The high-frequency "most run once" matters and 30 "do not meet the approval" matters list after the comprehensive argumentation, to be reported to the municipal government office issued and implemented.
5. To create a fair and transparent and predictable business environment.
First, increase the supervision of the business environment and case handling. Panjin city business bureau in conjunction with the municipal government inspection room focusing on grass-roots work "small children difficult to deal with" problems carried out openly and secretly, a number of counties and districts of social and livelihood type of government hall problems in the city notification, and require the responsible units to rectify the situation; Second, actively carry out the government's breach of trust behavior of the special rectification. Third, to build a strong "8890" comprehensive platform to do a good job of people and enterprises. Up to now, the "platform to accept all kinds of complaints and counseling more than 37,000, the completion of the satisfaction rate of more than 90%.
6. Vigorously enhance the convenience of enterprises and the masses to do business.
First, the upgrade of the project stewardship special class service firm business investment confidence. By the business sector at all levels of supervision of the implementation of the project stewardship, through the docking start the "project task force" service, to immediately do, special matters, urgent matters, urgent matters, do not miss things, do not pressure things, do not miss things, the spirit of the project to effectively help solve the development of the project problems. Second, to strengthen the business team building to improve the overall level of business. At present, Panjin City and the counties and districts (Liaodong Bay New Area) have set up an independent business environment construction bureau, are equipped with the management of government services, business environment supervision, the approval system reform, Internet + government services, "8890" and the people's heart network platform construction functions.
Second, there are problems
Due to the Panjim City, the business sector at all levels of the formation of a relatively short period of time, the role of the function is limited, as well as the various regions, departments in the business concept of awareness level is not yet in place, the Panjim City, the construction of the business environment, there are the following problems:
1. Business complaint case processing satisfaction rate is not high.
The main leaders of the regions and departments of the business complaint cases, especially the government defaulted on enterprise payments to deal with the problem of insufficient attention, the lack of belt-tightening to deal with the understanding and determination, resulting in Panjin City, the business case closure rate, the satisfaction rate is not high, and even "false closure", The phenomenon of "being closed".
2. The authority of the business sector at all levels needs to be improved.
Functional departments at all levels of the existence of local thinking, know that there are problems, there are short boards do not dare to expose themselves to the "ugly" knife to the inner problem, coupled with the business sector at all levels of the spirit of insufficient commitment, especially in the face of some of the contradictions and problems have not been "long teeth", the work is not enough to promote the work. The work is not enough to promote the strength.
3. Organizational reform and follow-up of the "first set up and then broken" work constraints.
Individual counties and districts can not follow the follow-up work of institutional reform, which "8890" platform there is a lack of manpower business is not familiar with the case and shirking of responsibilities and other issues, engineering fire review and acceptance of the transfer of the work of the existence of a professional force to support the problem is not in place.
4. Doing business "shirking winding" is still "small ghosts do not scatter".
Through the open and secret discovery of individual counties and districts in the government hall of social and livelihood services window there are set up unreasonable and limited number of "service" phenomenon, individual grass-roots window staff disguised as "eat, take, card and ask" and was asked to open the "strange proof" and "strange proof". "The problem of "strange proofs" and "unreasonable proofs" still exists, and the grass-roots cadres are not thorough in remedying the problem of "being difficult to deal with". "The problem is not completely rectified, the exposure of accountability is not strong enough.
Three, survey recommendations
1. Do a good job of business environment evaluation, to create a quantitative indicator support "the province's best business environment city".
Drawing on the successful experience of the creation of the National Civilization City, the business environment evaluation work to promote the strengthening of training, the introduction of the program, the establishment of the business environment, "a chess" pattern, weaving a good business environment, "someone to do it" the net, strictly implement the responsibility, serious accountability, and comprehensively improve the business environment, the business environment, the business environment, the business environment, the business environment, the business environment, the business environment, and the business environment. The implementation of responsibility, serious accountability, comprehensively improve the evaluation of quantitative results, the city's efforts to create "the best city in the province's business environment".
2. The establishment of a flat processing mechanism for government services, the full implementation of the nearby "through the Office" of the people's livelihood tasks.
Focusing on the regions and departments to establish data ****sharing, business collaboration and "integrated window" non-discriminatory acceptance of government services flat management mechanism for supervision and assessment, in accordance with the principle of maturing a batch, announced a batch of the public security, taxation, health insurance, social security and other line management areas to introduce more and more high-quality The cross-level cross-regional "city-wide" matters, and actively promote the popular and high-frequency matters in the county district cross-level integrated acceptance, county level cross-regional integrated acceptance, and constantly improve the administrative service matters close to the "through the office" people's livelihoods practical work effect.
3. Seriously carry out "business environment construction outstanding problems" series of special rectification.
First, in-depth public reflection, complaints about the concentration of problems in the region and the industry to carry out open and secret; second, focusing on the rectification of grass-roots "can be done not to do, can be done to slow down," such as the "little boy difficult to deal with" problem; third, to improve the government's failure to act on the work of the ledger The government's failure to do so, and strive to ensure that no new problems in the government's breach of trust, the stock of problems have been effectively resolved; four is to increase the supervision and inspection of the construction of the business environment, the backward units and counter-typical timely exposure, urging rectification; five is to establish and improve the construction of the business environment and the issue of the interview mechanism.
Business environment self-examination report 3
In order to conscientiously implement the district party committee, the district government on the optimization of the region's business environment of the work of the deployment of the Bureau of closely around the optimization of the business environment, enhance the level of transportation services, to take four specific measures, precise force, rapid action, and strive for the optimal transportation business environment, for the economic revitalization and development of the whole region to provide strong transportation security.
First, the work carried out
First, improve the construction of transportation infrastructure. Continuing to promote the xx to xx324 line xx section of the reconstruction and expansion of urban road project construction, the project for the alleviation of xx urban traffic pressure, improve the city's external image has a major role. I constantly strengthen the coordination, in accordance with the requirements of this year's implementation, next year's completion, a clear time frame, scheduling, to ensure that the construction task is completed on time. At the same time, good service xx city to Shika industrial park level road, root bamboo to Pingtianshan forest field secondary road, Ju Shi to Zhangmu three road and precise poverty alleviation road and other projects, to optimize the business environment in my area escort.
The second is to regulate traffic law enforcement behavior. The implementation of traffic road law enforcement power list system, the implementation of sunshine law enforcement, in accordance with the law to the community to disclose the regulatory basis, work procedures, penalty standards, penalties and other relevant content, to ensure that the law enforcement object to enjoy the "right to know"; to strengthen the supervision and inspection of administrative law enforcement, supervision of administrative law enforcement officers of the law enforcement behavior and consciously accept the law enforcement object and the public supervision. Public supervision.
Third, to enhance the transportation window service level. In the district government service hall traffic service window to implement the "first-responsibility system", "time-limited completion system", "one-time notification system" and other processing systems, simplify the process, realize the "One-stop" service, truly convenient for enterprises and the public to do business. Window staff dressed for duty, the use of standard civilized language, strengthen business training, and constantly improve efficiency and service level.
Fourth, strengthen the water transportation safety supervision. Continuously strengthen the supervision and management of the region's 11 ferry terminals, strengthen the training and education of boat personnel, and constantly improve the level of service and image of the industry. xx ferry was named 20xx "safe, convenient and civilized" demonstration ferry.
Second, there are difficulties
1, highway construction and maintenance funds gap. Highway construction, security projects, narrow road widening and other projects require district-level supporting funds are more, especially rural road security projects, this level of support accounted for most of the upper level of subsidies only 30%, the district level need to support 70% of the financial difficulties of my district, supporting funds are not in place, the work is really difficult to carry out. Highway maintenance, the situation is grim, heavy task, a large number of heavy vehicles into the rural roads, resulting in serious damage to the road surface, while the maintenance mileage continues to increase, and maintenance funds did not increase accordingly, resulting in increased pressure on highway maintenance; daily maintenance of rural highways, large and medium-sized repairs and water damage and other emergencies invested in the large amount of money is difficult to keep up.
2, I do not currently have the transportation function of the Bureau, the transportation business service work is inconvenient to carry out.
Business environment self-examination report 4
According to the Dongying Economic and Technological Development Zone Approval Service Department "on the implementation of the implementation of the business environment in the field of outstanding issues of special rectification program," the requirements of the Department of my department closely around the optimization of the business environment, combined with the actuality of the work, and seriously against the content of the rectification and special rectification program to carry out self-examination and self-correction, is now reported on the relevant information is as follows:
First, the situation of the self-examination and self-correction of the business environment.
Second, the work carried out
(a) refined oil retail business license
First, in order to optimize the layout of the development zone gas station, to strengthen and standardize the construction and management of refined oil retail outlets, scientific guidance on the construction of the refined oil circulation system, the preparation of the drafting of the refined oil retail outlets " Fourteenth Five-Year Plan, to optimize the business environment in our region.
The second is to strengthen the staff's business training, to enhance the level of service to the refined oil retail enterprises, the use of standardized civilized language, and constantly improve the efficiency and level of service, and truly convenient for enterprises and the public to do business.
Third, strictly in accordance with the approval procedures and processes, strengthen the supervision of refined oil retail operations, attach great importance to the annual inspection of refined oil, the use of information technology, take the online annual inspection, according to the requirements of the Municipal Bureau of Commerce, the petrol stations of refined oil retail business approval certificates and other submission of materials for careful and detailed verification, and to strengthen the comprehensive law enforcement, ecological and environmental protection, emergency management, public security, taxation and other departments. Information communication **** enjoy, strict verification of refined oil business enterprises in the quality, measurement, fire, safety, environmental protection, tax and other aspects of the existence of illegal, irregular situation.
(B) direct marketing enterprise service outlets program review, e-commerce development guidance and documentation
These two are currently idle matters, the next step in my department will continue to expand government service channels, enhance the level of service facilitation, through the continued combing and optimization of authority and responsibility for matters and processing links, reduce the process, compressed time frame for processing, and improve the efficiency of processing, in order to contribute to the optimization of the business environment.
Business Environment Self-Inspection Report 5Since this year, the county water bureau to "put in place" reform as the core, focus on improving administrative efficiency, optimize the level of service, and strive to create a civilized, orderly, efficient and convenient business environment. Since the optimization of the business environment since the start of the work, I focus on the key, clear direction, firmly grasp the work objectives, and vigorously improve the efficiency of the work, the quality of service excellence, and promote the optimization of the business environment in the work of the implementation.
First, the business environment work carried out
Grasp the internal management, optimize the business environment. First, I will be involved in the x administrative approval matters all into the county administrative approval bureau office hall, and all into the online processing, and fully promote the water system of government services matters "a network of one door a" reform, to achieve all the government services matters "do it right away, do it online, do it nearby, do it once! "The second is to continue to regulate official behavior, strict work discipline and integrity discipline, improve the level of government services; third is the implementation of "double random, a public" regulatory measures, to achieve regulation in accordance with the law, fair and efficient, open and transparent; fourth is in the enterprise-related charges, in strict accordance with the province, state on the Water resources fees and soil and water conservation compensation fees and other fees standard provisions of the charges; five is to strengthen the standardization of law enforcement team, standardized management, improve law enforcement level and capacity.
I accept, handle administrative licensing matters, in strict accordance with the "put in place"
reform requirements, simplify the process, maximize the combination of put in place, optimize approval services. First, the streamlining of application materials to improve the level of service. Such as river sand mining license, application materials only need to provide three to four kinds of materials, and at the same time in the processing to assist the applicant to fill out the relative professionalism of the technical materials, reduce the difficulty of the applicant to provide materials. Second, the combination of release and management, fully consult the relevant departments and do a good job of public announcement, to maximize the elimination of possible misunderstandings and disputes in the administrative licensing. In the river sand mining processing, the applicant may be triggered by sand mining activities lead to third parties have an interest in the full consultation and publicity to eliminate doubts and misunderstandings.
Do a good job of water-related services to ensure the safety of water supply. First, the implementation of the Yiwu Township township water supply project, the current trunk pipe network has been constructed, the water plant and other supporting pipe network is under construction. After completion to meet the Yiwu town and the surrounding water supply security; Secondly, I am building the Guanlei town Najia River Reservoir, after the completion of the water supply to protect the Guanlei port and the Guanlei town town of production and living water. The third is to carry out the Mengman Tianfang Reservoir and Menghuang Hui Li River Reservoir construction of the preliminary work, after the completion of the Menghuang Industrial Park and the Menghuang town production and living water security, Menghuang town and the surrounding production and living water tension single problem has been solved.
Second, there are problems and deficiencies
First, confined to the lack of conditions in all aspects of the quality of staff and work capacity. Business environment work, including the work mechanism, network and information means need to be based on the existing work, efforts to improve and enhance the existing staff's knowledge of the work is insufficient, the relevant business knowledge training is not enough.
Secondly, the progress of the "put in place" is inconsistent, affecting the promotion of the business environment work. At present, the "put" work through the approval system reform and decentralization work, progress is relatively smooth. Progress in "management" and "service" is lagging behind. "Double random one open" due to the work mechanism has not been rationalized, personnel and processes have not been fully operational; "service" initiative and mobility is not enough, the overall level of government services is still at a low level.
Three, the next step in the work of the intention
First, to strengthen the learning and education, enhance the work of the executive. Enrich the number of business environment staff, through training and learning to continuously improve the business quality of the relevant staff, according to the work to promote the situation, to strengthen the pilot zone approval bureau, the city supervisory bureau and other departments of business exchanges and learning, to improve the relevant leadership and staff of the business environment work cognitive and business level.
The second is to optimize the water investment environment, to provide a strong guarantee for the development of private enterprises. Optimize the investment and development environment, standardize the government investment category water conservancy project construction bidding activities, strict implementation of the project owner responsibility system, bidding system, construction supervision system and completion and acceptance of the system, in strict accordance with the requirements of the infrastructure procedures to run, to achieve openness, fairness and transparency. Social capital into the development and utilization of water resources, if necessary, to provide guidance and policy support; enterprise investment projects involving water environment management and flood safety, in the water conservancy infrastructure construction planning program to give priority to arrangements. In the work carried out to strengthen the sense of service, service for management.
Third, actively promote the water source, water supply project construction. Water supply is guaranteed is the basic conditions for the development of private enterprises, I continue to increase the efforts of engineering construction, the implementation of a series of water sources and water supply protection project, mainly Yiwu town water supply project, Tianfang reservoir, back to the Lee River reservoir, salt pond reservoir expansion and renovation projects.
- Previous article:What did you think of Red Headed Scarf?
- Next article:202 1 Changsha Fangte Chinese Business Festival Activity Time and Highlights
- Related articles
- Do I need to take the first, second and third grades of Guzheng?
- Maoming yuexi agricultural batch of dry goods have which
- A Chen Bin Scholar's Feelings of Local China and Cultural China
- Ip image design, what does ip image design contain?
- In what direction should the industrial structure develop?
- The problem of Guqin apprentice
- About the food culture of the Three Kingdoms?
- Who has a collection of 2000 martial arts novels packaged to download Baidu cloud?
- Why is there overcapacity in today's industrial Internet model?
- The implication of the gourd pattern of the word "shou" in the cross-stitch hook pattern