Traditional Culture Encyclopedia - Traditional customs - How to fill the bathroom tile gap is too small

How to fill the bathroom tile gap is too small

After the bathroom tiles are pasted, the gaps between the tiles need to be hooked to deal with the specific methods are as follows:

Hooking materials

(1) now commonly used hooking materials used are mainly cement, hooking agent, putty powder, etc. These materials, white cement, white cement is more traditional materials used. These materials, putty powder, white cement is more traditional materials used, now as a hooking material is mainly balcony cultural bricks used more, such as paving balcony tiles a lot of direct use of ordinary cement mortar can also be.

(1) putty powder, white cement waterproof performance, scrub resistance to some of the poor, now, the process of home renovation, in the kitchen and bathroom walls and floors, living room floors in the tile hooking is generally not used, and now basically choose a professional tile caulking (also known as hooking agent).

The type and selection of hooking agent

(1) hooking agent is now on the market mainly divided into sand and no sand, in general, paving glossy wall tiles and glass tiles are suitable for the use of no sand, paving matte tiles and antique tiles are suitable for the use of sand.

(2) there are two ways to choose the color of the hook and mortar, one is close to the method, choose and tile color close to the hook and mortar, the second is the contrast method, the color of the color and tile color to form a strong contrast.

The choice of hooking time

General hooking time in 24 hours after the tile, that is, after the tiles are dry and solid, hooking time is too early, will affect the tiles, resulting in unevenness or loose peeling. In addition, before hooking, you need to tile the gap inside the dirt debris to clean up.