Traditional Culture Encyclopedia - Traditional festivals - What is the construction organization design scheme of the office building decoration project of a district court?

What is the construction organization design scheme of the office building decoration project of a district court?

What is the specific content of the construction organization design scheme of the office building decoration project of a district court? Zhong Da Consulting will answer your questions below.

Project overview

1. project name: decoration project of the office building of the court in ××× District, Chongqing.

2. Project location: roadside of Kowloon Park, XX District, Chongqing.

3. Project scale: the total construction area of the project is 10238.5m2, and the structure is reinforced concrete frame structure.

4. Contents and scope of project bidding: The bidding scope covers all the contents in the construction drawing of the ceiling, floor, wall, doors and windows, electrical appliances and lamps of the indoor decoration project of the office building of the XX District Court in Chongqing1~ 5th floor (excluding the parking garage of-1 floor). Details are as follows:

(1) suspended ceiling project: light steel keel, T-shaped keel suspended ceiling, gypsum board, mineral wool board surface layer, latex paint finish. Large area adopts 600mm×600mm mineral wool board ceiling.

(2) Ground engineering: natural stones and vitrified bricks are laid in public spaces, granite and laminated wood floors are laid in courts, all wood floors are laid in conference rooms and leading offices, and anti-static floors are laid in computer rooms.

(3) Wall engineering: most of them are decorated with latex paint, and the lobby on the first floor is dry hung with stone. The wall of office space is decorated with cherry wood and stainless steel strips, and some of them are decorated with timely fiber latex paint, and the bathroom is made of wall tiles.

(4) Door and window engineering: door and window covers with solid wood lines, production and installation of on-site modeling panel doors, and installation of glass floor spring doors in the hall.

(5) Electrical engineering: indoor lighting circuit laying and switch lamp socket installation.

(6) Toilet and bathroom project: install PP-R pipes, PVC drainage pipes and some sanitary wares, and pay special attention to the waterproof treatment of the bathroom.

(5) Supervision unit: (to be determined)

(6) Construction environment: The project is located at the roadside of Kowloon Park in XX District, and the surrounding area is basically a construction site, without commercial facades such as residential areas, which brings a lot of convenience to overtime construction, but also brings a lot of inconvenience to the life of construction workers. In addition, because of the convenient transportation and not far from the building materials market, it is more convenient for bulk materials to be transported into the site. In addition, due to the large number of nearby construction sites and construction personnel, we should conscientiously do a good job in the safety and civilized construction education of on-site construction personnel, do a good job in the relationship with surrounding construction units and construction personnel, and establish a consistent good image of the company.

7. Engineering features: The interior decoration design of this project is novel, and a variety of new environmental protection decorative materials are adopted (especially the application of large-area granite and some timely fiber latex paint). The design is simple and modern, beautiful and generous, without losing the traditional characteristics. Some materials are novel and unique, and their colors are closely related to the image of the government, which is full of humanity space. The key points are the waterproofing of lobby, large and small law halls, hall railings, leading offices, large and small conference rooms, multi-function halls and bathrooms, and the laying of professional lines on the first floor.

8. Time limit: According to the requirements of the tender documents, it shall be completed with good quality within 90 calendar days.

9. Project quality objective: Our company promises that the decoration project of the office building of the XX District Court in Chongqing has passed the first acceptance and reached the excellent standard required by the current national standards.

General layout and description of construction

1. Layout of the construction site

In the construction process, due to the large building area, 1-5 and the external wall and roof are constructed at the same time, the construction period is tight, all related projects are carried out at the same time, the construction personnel are complicated, and the material transportation and cross-construction are troublesome, which requires the reasonable layout of the construction site and the closed construction with scientific and strict management measures. See attached figure 1 for detailed layout.

2. In order to shorten the transshipment of all kinds of materials and tools, organize the on-site plane and interchange flow operation. The project manager is responsible for the construction plane management, and the deputy project manager and technical director organize the implementation of daily work and manage it in different regions.

3. The main entrances and exits of the site are posted with access control system, site management regulations, project introduction, safety management and other rules and regulations and terms.

4. All the equipment and materials entering the site must be neatly stacked in the designated position according to the plane layout, and shall not be piled up at will.

5. A doorman shall be set up at the site, and the construction personnel shall wear badges to facilitate inspection.

6. The site partition layout is arranged according to the following functions.

(1) Material stacking: including bulk materials, cement river sand, precious materials, hardware miscellaneous parts, plates, flammable materials, etc. ;

(2) Stacking of construction equipment, finished products and semi-finished products;

(3) field offices;

(4) Accommodation for construction personnel should be arranged in a unified way, so as to be uniform, and the phenomenon of dirty, disorderly, scattered and wandering should be absolutely eliminated (it is suggested that the construction unit should define the location in a unified way and manage it according to relevant requirements).

(5) Professional construction group processing zone.

Construction preparation work

1. Site preparation

(1) According to the characteristics of the construction site, in order to ensure the orderly and powerful management of the construction site, it is planned to set up a construction site management office at the site, set up a separate material warehouse, implement closed management, and allow site management personnel and construction personnel to enter and leave.

(2) seal the construction area independently, protect the finished products of related facilities and equipment, set access control and strengthen the management of the construction site. All non-construction personnel must get permission from the project department to enter the site and be led by special personnel.

(3) Make a dynamic plan for the demand of construction machines and tools, and organize the entry and exit of construction machines, equipment and tools according to the requirements of the construction plane.

(4) Establish communication channels with the surrounding environment to ensure the normal construction.

(5) After the construction team enters the site, arrange accommodation and transportation in a unified way, so as to be neat and unified, and absolutely put an end to the phenomenon of dirty, disorderly, scattered and swimming.