Traditional Culture Encyclopedia - Traditional festivals - Construction time of bridge pile foundation
Construction time of bridge pile foundation
The piling work of a project depends on geological conditions, the number and depth of piles, construction technology and the construction machinery and manpower invested. It usually takes 6- 10 days.
In China, most testing institutions use reflected wave method (transient time domain analysis method) to test the integrity of piles, mainly because of its light instrument and fast on-site detection speed, and at the same time, it integrates excitation method and frequency domain analysis method as testing and auxiliary analysis means. Of course, in the low-strain integrity inspection, regardless of the type of defect, its comprehensive performance is that the impedance of the pile becomes smaller and it is difficult to distinguish the nature of the defect, which is its biggest limitation.
- Related articles
- What is the digital transformation of banks?
- Essay on my hometown Jiesheng Town
- What are the similarities and differences between data analytics in traditional and Internet businesses?
- What are China's four major plays?
- Why are poetry, calligraphy and Beijing opera slowly deteriorating and not being accepted?
- Quantitative Investment Strategies for Quantitative Analysis
- What is the prospect of planting lilies?
- "Heaven" Ding Yuanying thought and realized that it was heaven. Why is the way of preaching so unique?
- How to draw a toy car
- The difference between word document doc and docx