Traditional Culture Encyclopedia - Traditional stories - Ceiling installation steps

Ceiling installation steps

Measuring installation area

Accurately measure the installation area and prepare for installation. After the tiles in the hydropower station are pasted, accurately measure the area where the ceiling is to be installed, make the renderings in advance, and determine the location of the equipment.

Installing closed pipeline

Install tension rope.

Drive the expansion screw and hang the boom.

When driving expansion screws, eight suspenders must be used to hang the suspenders to ensure the overall firmness.

Mounting hook

Install the hook, install the light steel keel on the ceiling, and the main keel of the triangular keel adopts 50 widened and thickened hot dip galvanized paint keel to ensure the flatness of the whole ceiling and further strengthen the anti-corrosion. Triangular keel should also be painted with hot dip galvanized paint to enhance corrosion resistance.

Press the gusset plate into the three-way keel joint.

Press the gusset plate into the three-way keel joint to ensure that it is perpendicular to each other and in a line.

Install electrical appliances

Install electrical appliances. After the installation of electrical appliances, if the power supply is connected, the machine should be tested on site.

Glass glue edge sealing

Glass glue edge sealing, overall adjustment.