Traditional Culture Encyclopedia - Traditional stories - How to do the details of weak current construction?

How to do the details of weak current construction?

How to do weak current construction?

65438+

2. Construction of trunking frame and civil engineering, various weak current systems, etc. Should cooperate with the installation of weak current system trough frame. After the completion of civil engineering, it should be carried out simultaneously with other devices for treating air ducts (air ducts, water supply and drainage pipelines), or it may be a little later than the pipeline devices (about 15 working days). However, the reasonable arrangement and coordination of trunking frame and pipeline in weak current system must be solved in planning.

3. Coordination between outdoor placement of central control and civil engineering and decoration works. Decoration of central control monitoring room should be carried out simultaneously with all decoration works. Before the renovation of the central control room is completed, the center console, server/monitoring computer should be positioned. Pay special attention to the locks in the central control room and wiring room.

4. Positioning, installation and terminal connection of weak current system equipment. The positioning, device and terminal connection of the weak current system field equipment should be closely coordinated with the decoration project.

5. Weak current system debugging. We basically debug the weak current system after the equipment is installed. The debugging period of all weak current systems is about 30 days.

6, weak current system check weak current system check, advocate system acceptance should be carried out after the successful debugging of each system and the corresponding function and performance test demonstration. And after all the weak current system inspection documents are completed and the system runs normally for one month, the completion settlement will be organized.

Specific links of weak current construction:

The joint examination of 1 and weak current construction drawing is an extremely strict primary skill operation. Doing a good job of the blue prints.the design seriously plays a primary role in reducing errors in weak current construction drawings and ensuring and improving engineering quality. Before the blue prints.the design, our project team will provide detailed weak current construction drawings to the construction unit, supervision unit and electromechanical subcontractors. All units should carefully read the construction drawings, understand the contents and requirements of the drawings, sort out the difficult problems, record the problems in the drawings, and handle them during the planning disclosure and the blue prints.the design. It is suggested that the joint review of drawings should be organized and led by the general contractor of weak current construction, with the participation of the construction unit, supervision company, equipment suppliers of each subsystem and mechanical and electrical equipment suppliers, and the joint review work should be arranged step by step according to the nature of the project and the contents of drawings. The results of the joint review shall constitute a summary, which shall be signed by the general contractor of planning, construction and weak current and the constructor, and distributed as a supplementary technical document of the construction drawing.

2. Weak current construction schedule. The first time period of this schedule includes: system planning, equipment production and procurement, pipeline construction, equipment inspection, equipment installation, system debugging, training and system inspection. Interface coordination and recognition of weak current engineering construction shall constitute a summary or interface coordination document.

3. Disclosure of weak current construction skills The disclosure of weak current construction skills includes the disclosure between the general contractor of weak current engineering, the contractors of each subsystem, the suppliers of mechanical and electrical equipment, the installation company and the supervision company, and the disclosure between the wiring project team and the construction team. It should be done at different levels.