Traditional Culture Encyclopedia - Traditional stories - Pinggu line (Beijing Metro Line 8)
Pinggu line (Beijing Metro Line 8)
1. Planning and construction of pinggu line
The planning of pinggu line began in 2004, when the Beijing Municipal Government decided to build a subway line in Pinggu area to ease the traffic pressure in this area. After years of planning and construction, pinggu line was completed and put into use in 2022.
During the construction of pinggu line, the requirements of environmental protection and ecological construction were fully considered. A number of ecological wetlands and green belts have been built along the line, which has improved the quality of regional ecological environment. At the same time, the convenience and comfort of passengers are fully considered in the station design of pinggu line.
2. pinggu line station facilities
Pinggu line station facilities are designed and constructed according to Beijing subway standards. Every station is equipped with barrier-free facilities, including wheelchair ramps and blind roads, to facilitate passengers with limited mobility. In addition, each station is equipped with automatic ticket vending machines and automatic recharge machines to facilitate passengers to purchase tickets and recharge. There are also many entrances and exits in the station to facilitate passengers' entry and exit.
The interior decoration style of pinggu line Railway Station is unique, incorporating local cultural elements. The wall of the station shows the scenery, history and culture of Pinggu area, so that passengers can enjoy beautiful pictures while waiting for the bus.
3. Take the steps of pinggu line.
Pinggu line is easy to ride. The specific steps are as follows:
Step 1: Get to the station in pinggu line.
First, you need to get to the station in pinggu line. You can choose to walk, ride a bike or take a bus to the nearest station.
Step 2: Buy a ticket.
At the station, you can buy subway tickets with the ticket vending machine. If you already have a Beijing subway card, you can recharge it with an automatic recharge machine.
Step 3: Pass the security check.
You need to go through the security channel after purchasing tickets. Please put your luggage and articles on the security machine and pass the inspection by the security personnel.
Step 4: Wait for the train.
After the security check, you can find the platform in pinggu line according to the platform signs. On the platform, please stand at the designated boarding position and wait for the arrival of the train.
Step 5: Take the train.
Please board the train in an orderly manner when it arrives at the station. In the car, please keep quiet and don't make noise, so as not to affect the ride experience of other passengers.
Step 6: Arrive at the destination
Depending on your destination, you can get off at the station you pass. Please leave the train in order after the door is opened, and follow the signs in the station to find the exit.
4. The future development of pinggu line.
The opening of pinggu line will further promote the economic development and tourism prosperity in Pinggu area. In the future, with the continuous development of Pinggu area, pinggu line will continue to expand and optimize. The planned second phase of pinggu line will be extended to further areas, providing convenient travel conditions for more residents and tourists.
- Related articles
- What does gateway mean?
- Why has vegetarianism become a Buddhist commandment?
- How about Jiangsu Searle Plate Making Co., Ltd.?
- In the eyes of foreigners, China is the strangest food. It looks scary and tastes delicious. Do you know what this is?
- Yi Jianlian missed the whole season. What will be different when he comes back?
- Introduction of Quanzhou puppet show
- When did comedian Hou Yaowen die?
- How to design an excellent corporate culture exhibition hall?
- Want to open a ramen restaurant, how to make soup?
- Old-fashioned fried large fruit formula