Traditional Culture Encyclopedia - Traditional stories - Woodworking technology of interior decoration

Woodworking technology of interior decoration

hello

The construction technology of interior decoration carpentry involves a wide range, such as ceiling, floor, doors and windows, hanging cabinets and so on. I don't know which one you need.

First, I will give you the standard construction technology of ceiling, doors and windows, hanging cabinets and floors for your reference.

Construction of Home Decoration Project —— Woodworking Construction Technology

Ceiling installation

(a) using wooden keel, the installation shall meet the following requirements

1. Wooden keel shall be made of untwisted Korean pine and white pine, and yellow pine shall not be used. Main keel specifications for 50mm * 70mm;; The specification of the secondary keel shall be 50mm*50mm or 40mm*60mm, and the suspender shall be made of 4mm steel bars.

2. The main keel lifting point spacing to ensure that the main keel does not fall as well. The middle part of the main keel should be slightly arched, and the height is 1/200 of the short span of the room. After the main keel is installed, its position and elevation should be corrected in time.

3. Fix the side keel on the four walls according to the design elevation. The secondary keel should be fixed on the main keel with round nails. The secondary keels on both sides of the main keel should be staggered. Card keel should be installed between two secondary keels according to the block size and joint of the cover panel.

4. The secondary keel spacing is generally 400~500mm.

5. The bottom of the secondary keel and the card keel should be planed, and the section thickness should be consistent.

6. The lamp trough, diagonal bracing and bracing in the ceiling should be properly arranged according to the situation. Light lamps and lanterns should be hung on the main keel or additional keel, heavy lamps and lanterns or ceiling fans should not be connected with the ceiling keel, and hooks should be set on the grass-roots roof.

7. Fully correct the position and levelness of the primary and secondary keels, and tighten the derrick after correction.

8. Check the installed hanging wooden skeleton, which should be solid and reliable.

(2) when using aluminum alloy keel, its installation shall meet the following requirements

1. The main keel (load-bearing keel) lifting point spacing is the principle to ensure that the main keel does not fall. The middle part of the main keel should be bulging, and the bulging height should not be less than 1/200 of the short span of the room. The position and elevation of the main keel shall be corrected in time after installation.

2. The distance between the boom and the end of the main keel shall not exceed 300mm, and the boom shall be added when it exceeds. When the suspender meets the electrical equipment, the structure of the lifting point should be adjusted or the suspender should be added to ensure the quality of the ceiling.

3. The secondary keel (medium and small keel) should be installed close to the main keel. When installing the panel with self-mercury screws, the joints of the panel must be installed on the secondary keel with a width of not less than 40 mm

4. According to the needs of panel layout, prepare the cross brace keel with conventional size in advance, and fix its two ends on the long keel with connectors. The gap between the horizontal brace keel and the long keel of the open keel series should not be greater than 65438 0 mm. 。

5. The side keel shall be fixed on the surrounding walls according to the design elevation.

6. For the bathroom with small area, the side keel is fixed on the surrounding wall according to the elastic line elevation, and the secondary keel is fixed on the side keel with connectors. The secondary keel adopts aluminum alloy belt. After the belt is connected with the side keel, a hanger can be added when it is tightened and straightened.

7. Comprehensively correct the position and levelness of the main and secondary keels. Connectors shall be installed in a staggered manner. There is no obvious bending in the visual inspection of the main keel, and the deviation of butt joint dislocation at the joint of the secondary keel is less than 2mm. After calibration, tighten all hangers and connectors of keel.

8. Check the installed ceiling keel, which should be solid and reliable.

(3) The installation of the cover panel shall meet the following requirements

1. Fix with nail gun, nail distance is 80~ 150mm, nail length is 25~35mm, nail cap should be knocked flat and enter the panel for 0.5~ 1mm, and nail holes should be smoothed with oily putty.

2. When fixing with battens, the nail spacing should be no more than 200mm, the nail length should be 35mm, the nail cap should be knocked flat, the battens should be 0.5~ 1mm, and the nail holes should be smoothed with oily putty.

3. When the plywood surface is painted with transparent paint, the wood grain and color of adjacent panels should be similar. The wood grain should be clear.

Transparent glass installation shall meet the following requirements:

(1) The pattern on the glass plate should be clear and complete, and the four sides must be perpendicular to each other.

(2) Installation by shelving method, with 2mm glass installation seam.

Translucent glass installation shall meet the following requirements:

(1) The material shall be free from defects such as edges, missing corners and cracks.

(2) When batten nails are used, the nail spacing shall not be greater than 200mm, the nail cap shall be leveled, the batten shall be 0.5~ 1mm, and the nail holes shall be leveled with oily putty.

(3) When metal bar nails are used for fixation, the nail spacing should not be greater than 100~ 150mm, and the nail caps should be arranged neatly.

(4) When the shelf method is adopted for installation, the plate should have installation seams.

Manufacture and installation of two door covers and window covers

(a) the door, window cover installation should be close to the wall, can not have gaps. The edges and corners are straight, and the joint at the corner is generally 45 degrees.

(2) When installing the door window cover, aim the nail at the wooden tenon on the wall. The length of the nail should be 2~2.5 times the thickness of the door and window cover material. Nail cap should be knocked flat, 0.5~ 1mm should be nailed into the surface along the wood grain, and nail holes should be leveled with oily putty of the same color.

(3) The door and window covers can be made of joinery board, and the surface is decorated with decorative wood lines. When installing, the door window sleeve structure must be firmly connected with the wall.

Manufacture and installation of three doors

(a) the door frame thickness is greater than 50mm door should adopt double tenon connection. When assembling doors and doorframes, tenons and grooves should be embedded tightly, glued and tightened with glue.

(2) After the door and door frame are assembled, the cuts of the components should be on the same plane, and the depth of the groove inserted into the core plate of the back door should be 2 ~ 3 mm..

(3) The production quality of doors and doorframes shall meet the following requirements

1. The surface shall be polished smoothly, and there shall be no warping, planing, burr and hammer marks.

2. The line type of doors and doorframes should meet the design requirements, and the corner cutting and flat-fell seam should be sealed flat and level.

3. The diagonal length and dimension deviation of the door and door frame shall not be greater than 2mm.

4. The height deviation of the door should be +2mm and -0mm.

5. The height deviation of the door frame should be +0mm and -2mm.

(4) The installation of doors and windows shall meet the following requirements

1. When the door frame is installed on the masonry wall, it should be fixed on the wooden brick or drilled wooden tenon built in the wall with no less than two fixed points on each side, and the spacing should not be greater than1.2m..

2. What is the best way to make up the C disk?

3. Before the door is installed, the square should be corrected and the diagonal braces (not less than two) should be nailed. Doors without thresholds should be nailed horizontally to prevent deformation during installation.

4. The vertical seam between the door and the door frame should be controlled at 65438 0.5 ~ 2.5mm. 。

5. The upper seam between the door and the door frame should be controlled at1~1.5mm. 。

6. Seam between the door and the ground: the outer door should be controlled at 4 ~ 5mm;; The bedroom should be controlled at 6 ~ 8mm;; The bathroom and kitchen doors should be controlled at10 ~12 mm.

Four-wood floor pavement

(A) the laying of solid wood floors

1. Tree species of wood joists and skids should be larch, Douglas fir, masson pine, etc. Strong grip on nails. Never choose white pine and Chinese fir with poor nail grip. The specifications of joists shall not be less than 45 mm * 25 mm. Wooden joists should be dry.

2. The floor must be dry without sundries, and the cement floor at the bottom of the house should be properly moisture-proof.

3. The length of the wooden screw for fixing the wooden joist should be 2~2.5 times the height of the wooden joist. The wooden joist can't be loose, just behind the horizontal side, without cement mortar sealing.

4. There should be a gap of not less than 30mm between the wooden joist and the wall. The spacing between the centers of wooden joists shall not exceed 300mm.

5. Floor tiling method. When the floors are tiled and fixed on the wooden joists, special spiral nails should be used (available in decoration materials stores), and the tongue and groove between each floor must be closely spliced without leaving gaps, but attention should also be paid to the humidity of the environment when paving. When the environmental humidity is high, the hand feel should be lighter when nailing the floor, and when the environmental humidity is low, the opposite is true. When paving, it is forbidden to glue between the tongue and groove of each floor before splicing, which will destroy the natural stress of the floor and make the floor crack. In addition, according to the characteristics of the climate in Shanghai, the floor should naturally have an expansion joint of about 10mm around the room to adapt to the changes of floor expansion and contraction.

6. The surface of the wooden floor should be planed and polished. After cleaning, the surface of the floor should be embedded with putty of the same color as the floor. After drying, it should be polished with fine sandpaper, wiped clean and then painted with floor paint.

(2) Laying of parquet floor

1. Before the parquet floor is laid, the defective products such as missing edges, corners, bends, cracks and obvious color difference shall be eliminated.

2. Before laying, the cement floor must be leveled, dusted and degreased. If necessary, it can be scraped with clear water and mud, dried, chiseled and cleaned.

3. Before paving, cross the line in the middle of the room. When laying the grid pattern, the reticle should be parallel to the wall; When laying the floor mat pattern, the reticle should form a 45-degree angle with the wall.

4. The adhesive used for laying parquet floor should be evenly coated, the floor should be arranged closely and the flat-fell seam should be even. Every room should be paved from the intersection and spread around. One side of parquet floor along the cross line must be paved with seams. After each parquet floor is paved, the extruded glue should be wiped off at will.

5. After the completion of the whole paved parquet floor, before cleaning, rough planing, fine grinding and planing, the adhesive should be dried first, and the corners should be manually polished with fine wood sandpaper.

6. After polishing and cleaning, the surface layer should be embedded with putty of the same color as the floor. After drying, it should be polished with fine sandpaper and painted with floor paint.

7. The parquet floor on the rough ground should be nailed firmly, and the length of the nails used should be 2~2.5 times the thickness of the panel. It should be nailed obliquely into the rough floor from the side, and the nail cap should not be exposed. When the length of parquet floor is not more than 300mm, two nails should be nailed on the side; When the length is greater than 300mm, three nails should be nailed and one nail should be nailed at the top.

8. The planing thickness of parquet floor should not be greater than 1.5mm, and there should be no planing marks.

9. The baseboard or baseboard shall be installed after polishing the parquet floor. The gap between parquet floor and wall is sealed with skirting board or skirting board strip.

(4) New wood floor

Please refer to the paving instructions of each product for the paving methods of painted floor, composite floor, open wood floor and bamboo floor.

Five-wall skirt installation

(1) Generally, the height of the half partition is 900~ 1200mm, and that of the whole partition is 2 100~2300mm.

(2) Before installing the partition, the wall surface should be leveled to remove floating ash, and the uneven wall surface should be leveled with putty. Wet walls should be coated with waterproof paint.

(3) The wooden keel is easy to use with 24mm*30mm square timber, the panel should be plywood or plywood, and the spacing between the main keels should be controlled at 450 ~ 600 mm 。

(4) During construction, the height line of the clapboard should be popped up on the cover, and wooden tenons should be drilled on the wall according to the design orientation and position of the keel. The depth of the wooden tenon should be10mm away from the wall. The drilling spacing along the keel direction should be 500 mm

(five) keel and stow-wood, nail the position of tenon, nail length should be 2~2.5 times the thickness of keel or stow-wood. It can also be fixed with nails. The depth of penetration into the wall should be 30~50mm, and the depth of penetration into the concrete wall should be 27~32mm, and the nail tail should not be exposed to the keel or stow-wood surface.

(6) The panel can be fixed with adhesive and temporarily fixed with metal nails. After the bonding is firm, the meta-nail will be regenerated.

(7) The panel can be fixed with nails, and the nail distance 100~200mm is equal to the wood grain of the panel, and the nail holes are leveled with oily putty of the same color as the panel.

(eight) the Yin and Yang angle of wallboard must be vertical and horizontal; Docking must be at a 45-degree angle; Visually, the panel height of the clapboard should be consistent; The joint width between panels should be uniform; The diagonal deviation of a single panel shall not be greater than 2mm. The surface should be smooth and the wood grain should be clear. Kick angle boards and battens are close to the panel, and there can be no gaps.

Hanging cabinets, wall cabinets and furniture

(a) hanging cabinets, wall cabinets, furniture should be assembled by means of tenon connection, erection, crosspiece, neutral and intermediate. The tenon and groove will be closely embedded, bonded with adhesive and tightened with glue. Don't fix the connection with nails.

(2) The panel is adhered to the skeleton with adhesive, with accurate position and fixed along the grain direction with nails. The nail spacing is 80~ 100mm, the nail length is 2~2.25 times of the thickness of the panel, and the nail holes are smoothed with the same oily putty as the plate.

(3) The connection between the cabinet door and the cabinet body shall be installed with elastic connectors and fixed with wood screws.

(four) the handle of the hanging cabinet should be installed below the middle point of the cabinet door; The general height of the wall cabinet handle is 1300~ 1500mm.

(5) The hanging cabinet shall be fixed on the wall with expansion bolts. After installation, it should be close to the wall and ceiling without looseness, safety and reliability, correct position and no deformation.

(6) After installation, hanging cabinets and wall cabinets must be vertical and horizontal. All external corners shall be smoothed by sandpaper, with smooth surface, neat edges and corners, and no burr and hammer marks. The line type meets the design requirements, the edges and corners are neat and smooth, and the flat-fell seam is tight and flat.

(7) Allowable deviation of hanging cabinets, wall cabinets and furniture manufacturing: allowable deviation of cabinet warping is 3 mm; The allowable deviation of cupboard door warping is 2mm;; The allowable deviation of diagonal dimension of cabinets and doors is 2mm;; The allowable deviation of cabinet height and width is +0,-2; The allowable deviation of the height and width of the cupboard door is +2, -0. Width of gap between cabinet body and cabinet door: the butt joint of cabinet door is not more than 0.8mm;; The gap between the cabinet door and the cabinet body is not more than 0.5 mm; ; The lower seam between the cabinet door and the cabinet body is not more than1mm; The vertical seam of the hinge between the cabinet door and the cabinet body is not more than 0.8mm..