Tempered glass installation method?

1, measurement and placement: according to the design drawings size measurement and placement, measured the elevation of the grass-roots level, the center axis of the glass wall

line and the upper and lower parts of the closing U-type 3 * 3, 3 * 4 steel groove position line.

2, pre-embedded iron parts of the lower part of the side of the upper glass groove installation: according to the dimensions of the design drawings to install the bottom of the groove steel parts,

fixed with expansion bolts, and then install the upper part of the upper part, the side of the steel glass groove. Level and straighten, and then fixed. Installation

The groove is padded with bottom tape, and all non-stainless steel parts are painted with anti-rust paint.

3, glass block installation and positioning: 10mm tempered flat glass all customized in professional manufacturers, transported to the site. First

The glass tank and glass block clean, with glass installation machine or tray suction cups will be placed in the installation of glass block

The slot, leveling, vertical after the plastic block plug tightly fixed, the same glass wall all installation leveling, vertical before

Start injecting glue.

4, embedded joints gluing: glass all in place, correct the flatness, verticality, and at the same time with polystyrene foam embedded

strips embedded in the groove so that the glass and metal groove bonding PingVu, tight, and then hit the silicone structural adhesive;

5, border decorative: generally no vertical glass partition wall border is embedded in the wall, the column surface and the ground in the finish

layer, at this point, as long as the fine processing of the wall, the column surface and ground in the finishing

layer, this time as long as the fine processing of the wall, the column surface and ground in the finishing

layer. At this time, as long as the fine processing of walls, columns and the floor of the finishing blocks and in the paneling or installation with the glass

glass can be connected.

6, cleaning and finished product protection: no vertical frame glass partition wall is installed, with cotton gauze and detergent to clean the glass surface

surface of the glue and stains, and then stick stickers and other ways to make a conspicuous sign to prevent the accidental occurrence of touching

crashing glass.