Traditional Culture Encyclopedia - Traditional festivals - Zhangpu Cinnamon Garden two rooms are decorated?

Zhangpu Cinnamon Garden two rooms are decorated?

Yes, the hardcover is decorated

The hardcover house is also known as the "finished house". Fine decoration requires "exquisite, integration", while not losing the master's status, identity, as well as personality and taste. Hardcover housing focuses on every detail of the part of the scrutiny of the overall spatial structure of the house, the choice of decorative style, as small as the choice of a style of screws, are very careful, so hardcover homeowners are mostly enjoying the home life.

For the flat or simple decoration, the decoration process may only be in the house walls brushed with a layer of new wall paint or put on new wallpaper, which is also known as "renovation", this kind of renovation of the house is often used for rent, rarely live in the house; and hardcover houses! When the owner is renovating the house, he or she will plan the overall layout of the house, and at the same time will ask the design company to draw out his or her favorite design drawings, and then after repeated modifications to finalize the design drawings, and then and the decoration team to discuss the specific details of the renovation; in the entire process of designing and decorating, the owner of the house will often be for some very small details of the reasoning for argument, such as wallpaper for the point of fit of the small gap between the small gap between the switches and walls, the ceiling, the ceiling, the ceiling, the ceiling, the ceiling, the ceiling, the ceiling, the ceiling, the ceiling, the ceiling. The small gap between the wallpaper, the switch and the wall, the ceiling is a little high, the color of the light bulb is not their favorite, the small gap between the floor and so on and so forth, perhaps only the owner of the house to understand the significance of such small details - the desire for a home and the perfect life of the aspirations.

3Case Study

Edit

There is no upper limit to the extent to which a well-decorated house can be furnished in principle, and it is often based on the financial situation of each homeowner, which can vary, and may evolve into "luxury" later on.

Decoration effect

The left picture is a corner of the living room of a decorated house, from the picture should be a small house decoration effect, mainly to show us the soft part of the picture can be seen, each piece of soft furnishings (floor lamps, chairs, carpets, windowpaper, wall decorations) are very chic, it is clear that they are carefully selected.

Decoration effect

The right picture is a bathroom decoration effect, the overall style of lavender and light blue-based, reflecting a misty feeling, as if there is a lavender fragrance released in the light blue sky; would have been in the eyes of the general public, the bathroom is just a place for people to facilitate, there are almost no a few people want to stay even a few minutes more in the bathroom, but seeing this picture, you can see that every piece of soft furnishings (floor lamps, carpets, window treatments) has been carefully selected. But after seeing this picture, will your point of view change?

4 decoration standards

Edit

There is no uniform standard for the well-decorated house, a more authoritative standard is the Chongqing Municipality of the well-decorated house standards, the main contents are as follows: 1. bathroom floor, door embedded stone and the ground of the combination of the layer and the local wall must be waterproof construction

2. should be set up for floor drains and desirable wet and dry zoning

3. . Each set of residential air conditioning power outlets, power outlets and lighting, kitchen power outlets should be set up in separate circuits; kitchen power outlets and bathroom power outlets should be set up in separate circuits.

4. It is recommended to add: It is strictly prohibited to use open fire, high wattage lamps and heating equipment to bake the combustible decorative surfaces and materials after moisture without special supervision. (In the construction of the construction period and do not want to rework or the moisture of the decorative surface and material baking day and night, very dangerous)

5. This section applies to the bathroom, kitchen, balcony (balcony) and kitchen bathroom door embedded in the stone combined with the layer and the kitchen and bathroom equipment parts installation of waterproofing project construction.

6. and the bedroom (changed to indoor) adjacent to the wall waterproof layer should be extended to at least 50mm above the height of the bathroom ceiling, or full wall waterproofing

7. on the installation of equipment parts and other interfaces at the junction of waterproofing sealant, glass adhesive treatment and the bathroom wooden grass-roots level and wood door sets moisture-proofing treatment should be required.

8. The actual use of finished sets of wooden doors, and is the focus of the owners to check the project, this article proposes to increase the set of door content: (at the time of the initial draft did not involve the set of doors, I specifically put forward the following views, red letter content of the whole adopted)

1), set of wooden door face line should be close to the wall, no warping and deformation.

2), kitchen bathroom such as the use of sets of wooden doors, leaning against the kitchen bathroom door face line should be 20mm off the ground, the section after the scene cutting should be made moisture-proof treatment, and the section after the scene cutting and processing of its door shall be re-do the closure treatment.

3), the set of wooden doors shall be installed door sucker, and can not be installed on the wooden skirting, door open to the maximum of its lock handle shall not be in contact with the wall.

4), the set of door paint sensory quality should be in line with the relevant standards, field installation of the formation of splicing joints and nails should be colored spot filler treatment.

5), sets of wooden doors should be installed in two installations, first install the door frame to do a good job of semi-finished product protection, to be completed after the sky wall decoration and then install the door face and door.

6), fixed set of door frame metal parts and nail cap should be hidden.

7) The gap between the door frame and the wall shall not be filled with cement mortar or construction debris, and elastic materials shall be used to fill in full.

8) door face line should be used 45 degrees to touch the corner splicing, should not be spliced at right angles.

9. Wall tiles should be selected before paving, the back of the brick cleaned up, and should be soaked in water for more than 2h, dry the surface moisture. (It should be stipulated how much water absorption before soaking)

10. Suggested additions: before paving should determine the way of paving, the budget number of vertical and horizontal pieces and the number of paving blocks for sequential arrangement.

11. wall framing should be in accordance with the following provisions: (the actual amount of work, the owners are very concerned about, the problem is also out of a lot)

1) grass-roots surfaces should be smooth, there shall be no chalking, skinning, cracks and protrusions, the color and luster should be consistent. Concrete and plaster surface water content is not greater than 8%, should be full of scraping putty, should be solid and firm, surface flatness deviation is less than or equal to 2mm, yin and Yang Angle straight, full brush special base film once, different materials grass-roots level of the joints, should be pasted with joints. There are moisture requirements should be moisture-proof treatment

12. Suggested additions:

1), the corners should be brushed 1-2 times more adhesive dipping agent;

2), to catch up with the pressure of the air cannon, for the calendering wallpaper can be used to scrape the steel plate, for the foam and composite wallpaper should not be scraped with the scraper scraping, the application of towels, sponges, or brushes to catch up with the leveling.

3), laminating compaction will be extruded after the adhesive in time to wipe clean, the surface shall not have bubbles, dirt class.

4), the construction of the relative humidity of the air should not be too high, should be less than 85%, humidity should not be drastic changes (Chongqing region in late spring, summer and early moldy rainy season should be paid special attention to).

5), according to the characteristics of the Chongqing area, must be selected to have high temperature resistance at the same time has a strong anti-layer performance of the binder or wallpaper powder.

13. two colors of lacquer at the junction, should be clear boundaries, there shall be no color bite phenomenon

14. wood flooring installation should be in line with the "wood flooring, acceptance and use of the norms of" GB/T20238-2006

15. should be added to the laminate and composite flooring installation content (the official standard has increased the content of a number of times)

16. >16. Installation of concealed water supply and drainage pipes, must be in the next process before construction, according to the relevant provisions of the water supply pipe pressurization (should be changed to pressure test) inspection and drainage pipe flooding test, there should be no leakage

17. Various sanitary appliances should be done after the completion of the installation of water and water test, acceptance should be taken after the finished product should take appropriate measures to protect.

18. No indoor weak electricity system installation

Suggested to add: equipment installation project (air conditioning, range hoods, bathtubs, electric and gas water heaters, etc.), bathroom another star metal parts and balcony cool racks and other installations, including cleaning and bathroom backfill project specific requirements and construction points. Individual content there, too simple to guide the actual work, because the installation phase out of the problem too much. There is also the problem of anti-theft, of course, is a management problem. (Formal standards added intelligent and equipment systems installation system)

19. Acceptance of waterproofing works should be done twice water storage test, keep written test records. (inconsistent with the previous construction in the requirements: waterproofing works should be done not less than 24 hours water storage test).

20. Finished residential decoration works should be in accordance with the "Unified Standard for Quality Acceptance of Building Construction" GB 50300, "Building Decoration and Decoration Engineering Quality Acceptance Specification" GB 50210, "Code for Fire Protection Construction and Acceptance of Internal Decoration of Buildings" GB 50354, "Code for Quality Acceptance of Construction Ground Engineering" GB 50209, "Code for Quality Acceptance of Construction of Building Electrical Engineering Specification" GB 50303, "building water supply and drainage and heating engineering construction quality acceptance specification" GB 50242 and other relevant standards for the test batch, sub-projects, divisions (sub-divisions) project quality acceptance. Should also be in accordance with the provisions of this specification for finished residential decoration works for the quality of engineering sub-family acceptance

21. Suggested to add: "Wooden floor paving, acceptance and use of norms" GB/T20238-2006