Traditional Culture Encyclopedia - Traditional stories - Seek a set of home furnishing effect is best hand-painted
Seek a set of home furnishing effect is best hand-painted
Two, hand-drawn eave wall node detail
In the completion of their respective programs, flat, elevation, section and the roof plan construction design drawings on the basis of the A3
copy paper (frame, icons see figure) hand-drawn pen and ink lines to complete the design and drawing, the respective design of the two eave wall node detail (from the ground to roof gable). Scale 1:10. One of the requirements cut in the main entrance; another self-selected (should be selected in the nodes of the exterior wall construction of the most parts);
Eaves wall node detailing design depth requirements:
(1) in the elevation plan of the node cut location, standardized drawing detail index symbols (cut line coarse realization; lead line fine solid line, lead index number diameter 10mm circle, garden) Corresponding to indicate the detail number and where the drawing number);
Note: lead line side should be the projection direction.
(2) corresponds to the detail index symbols according to the orthographic projection method to draw the wall node details; due to the limitations of the node parts (such as windows under the wall, etc.) can be used to partially break the double fracture line broken compression, but the size and elevation should be labeled according to the actual size.
(3) line and legend expression should be correct, standardized,. The outline line of the main components in the wall body which is cut to the profile line and the demarcation line of the laminated materials are drawn with thick solid line; the thickness line of the finish decoration is drawn with thin solid line;
(4) Labeling
① Indicate the positioning axis of the wall body which is cut to the profile line and the axis number (corresponds to the positioning axis of the floor plan).
② on the outside of the wall should indicate its floor, ground floor, door and window openings, eaves and other parts of the vertical height dimensions and elevation. (Labeling levels inside and outside to be clear and accurate)
③State the steps, canopies, bulkheads and other parts of the detail construction design dimensions.
4 words in accordance with the construction sequence of the ground, floor, roof, steps, canopies, bulkheads and other parts of the material, material ratios and structural design practices.
④Eaves node detailing should be detailing symbols (thick solid line diameter 14mm circle), the circle should be indicated with the elevation of the index symbols on the corresponding consistent number; and in the detailing symbols on the right side of the scale.
(5) other requirements with the work of one, drawing numbering according to the order of the number of completed drawings compiled.
- Related articles
- What is community service?
- Where is the specialty of Polygonatum sibiricum?
- Why does the world expect and demand China to participate in global governance at the same time?
- Library research report
- Paper was invented in the Eastern Han Dynasty, in the era of no paper, how did the ancients stick spring couplets?
- How are the customs and habits of China different from those of other countries?
- What are the better equity crowdfunding platforms for private enterprises in China?
- How to treat the commercialization of traditional culture and traditional festivals
- Introduction to Brandon University
- What is the custom in Lintao area (composition)