Traditional Culture Encyclopedia - Traditional stories - Quota quotation of FRP sculpture
Quota quotation of FRP sculpture
First, create sculpture clay sculpture and enlarge the reserve price?
1. Realistic sculpture:
1- 1- 1 head and chest circumference: 10000 yuan/m× height or length. ?
1- 1-2 Standing portrait: 8000 yuan/m× height or length.
1- 1-3 double: 7000 yuan/meter × height or length × number of people. ?
1- 1-4 single animal: 6000 yuan/m× height or length. ?
1- 1-5 polyploid animals; 4500 yuan/meter × height or length × quantity.
1- 1-6 relief: 3500 yuan/square meter × peripheral area.
1- 1-7 animal relief: 3000 yuan/square meter × peripheral area. ?
2. Deformed sculpture:
1-2- 1 single person: 7000 yuan/m× height or length.
1-2- 1 Double: 6000 yuan/meter × number of people × height or length. ?
1-2-3 animal monomer: 5000 yuan/m× height or length.
1-2-4 animal population: 4500 yuan/m× height or length× number.
1-2-5 figure relief: 3000 yuan/square meter × peripheral area.
1-2-6 animal relief: 2500 yuan/m2× peripheral area.
3. Abstract sculpture:
1-3- 1 Body, surface and composition: 8000 yuan/m× height or length. ?
1-3-2 Body, surface and line composition: 7,000 yuan/m× height or length.
1-3-3 surface, line and composition: 8000 yuan/m× height or length. ?
1-3-4 decorative relief: 3000 yuan/square meter × peripheral area. ?
4. Sculpture volume and amplification factor:?
The basic price is within1-4-1.5m.?
1-4-2 5 m ~ 10 m (base price ×2). ?
1-4-311m ~15m (base price ×3).
1-4-4 16m ~ 20m (base price ×4).
1-4-5 over 20m (base price ×5).
1-4-6 directly converts from the final version to a hard sculpture, and charges 50% of the (base price × coefficient).
5. Turnover of sculpture:
1-5- 1 Knock: 400 yuan /m2. ?
1-5-2 copying die set: 600 yuan /m2. ?
Second, the sculpture modeling material production class 1. Gypsum sculpture:
2- 1- 1 Original seal: 500 yuan /m2.
2- 1-2 original model set: 800 yuan /m2.
2- 1-3 Copy the original: 600 yuan /m2. ?
2- 1-4 gypsum relief: 400 yuan /m2.
2. Cement sculpture: ("concrete" is concrete, calculated by surface area)
2-2- 1 cast-in-place white cement concrete: 800 yuan /m2. ?
2.2.2 Cast-in-place cement concrete: 700 yuan /m2. ?
2-2-3 Cast-in-place concrete splitting fake stone: 1200 yuan /m2.
2-2-4 Cast-in-place concrete surface: 1400 yuan /m2.
2-2-5 Replication of cemented cement: 1400 yuan /m2. ?
2-2-6 Cast-in-place cement: 1000 Yuan/m2.
2-2-7 Prefabrication and installation of die set: increased by 30%. ?
3. FRP sculpture:
2-3- 1 imitation white marble: 1000 yuan/square meter.
2-3-2 Coloring Simulation: 600 yuan /m2. ?
2.3.3 Polishing and whitening: 500 yuan /m2. ?
2-3-4 Copper electroplating: 1200 yuan/m2. ?
2-3-5 Electroplated brass: 1000 Yuan/m2. ?
2-3-6 Silver plating and nickel plating: 1400 yuan /m2. ?
2-3-7 imitation gold electroplating: 1400 yuan /m2.
4. Stone carving:
2-4- 1 red sandstone: 3,000 yuan /m3. ?
2-4=2 Granite: 5000 yuan /m3. ?
2-4-3 white marble: 10000 yuan /m3. ?
2-4-4 colored marble: 4,000 yuan /m3. ?
2-4-5 white marble relief: 4,000 yuan/square meter. ?
2-4-6 Granite Relief: 2,500 yuan/m2. ?
2-4-7 Marble Relief: 3,000 Yuan/m2. ?
2-4-8 Marble Gravure: 1500 yuan /m2.
(The above eight stones are based on domestic stones, and the relief thickness is less than 10 cm. )?
5. Cast copper sculpture: (The specific gravity difference of cast copper is 8.9 tons /m3, and the average wall thickness is 5 ~ 8 mm)
2-5- 1 Calculated by area: 5,000 yuan/square meter.
6. Cast iron sculpture: (the cast iron ratio is 8 tons /m3, and the average wall thickness is 8 ~ 10 mm)?
2-6- 1 Calculated by area: 2,500 yuan/square meter. ?
7. Forged stainless steel sculpture: (the specific gravity of stainless steel is 7.8 tons /m3, the wall thickness is 1.5 ~ 2mm, and the cost is calculated by area).
2-7- 1 domestic standard model is 1 Cr 18 Ni 9 Ti, and imported standard model is 304-2B.
2-7-2 The practical plate per square meter of sculpture is: (market price × 1.4 coefficient = steel plate price)
2-7-3 The auxiliary materials per square meter of sculpture are: (steel plate price × 40% coefficient = auxiliary material price)
2-7-4 Manual production cost per square meter of sculpture: (steel plate price+accessories price = manual production cost)
2-7-5 Total cost of sculpture works per square meter: (price of steel plate+price of fittings+production cost = cost per square meter)
Note: The area of 0.4 in the coefficient [1] 1.4 is the waste content. [2] The coefficient of 40% includes the labor cost of steel structure manufacturing, electromechanical equipment and cutting, welding and polishing consumables, excluding the price of foundation and steel skeleton materials. 8. Bronze carving: The price is determined according to the calculation method in Article 7.
Third, spending items?
3- 1 Project management fee: charged according to provincial project budget quota or contractor qualification charging standard. (Attached Table) 3-2 Installation fee: charged according to the actual engineering quantity and the quota of the installation company (or hoisting fleet).
3-3 Transportation fee: charged by ton/km. ?
3-4 Tax calculation: according to the tax calculation standard × project cost.
3-5 Price difference: Adjust according to the budget price of materials and the retail price of the market, and other surplus will increase or decrease at the same time.
3-6 lump sum: according to the contract, show the official project tax by the project cost? Invoice or financial receipt of equipment.
Myth; legend
- Related articles
- kab entrepreneurship education program
- Yoga copywriting
- Chinese painters were close to nature in the sense of sketching, whereas Western painters painted a personified God, what are the differences?
- Su Shi family letter original text
- Tomato varieties
- Music textbooks on the grasslands of Central Asia
- What brand of porcelain produced by Wedgwood Company is authorized to use?
- How to run a fried dumpling snack bar to maximize profits?
- Production and steps of peanut crisp
- Methods to improve the quality of enterprise products