Engineering project cost control measures?

What is the specific content of the measures for cost control of engineering projects, the following Zhongda Consulting for you to answer.

(1) organizational measures. The establishment of cost control organization guarantee system, there is a clear project organization, so that cost control has a specialized agency and personnel management, clear tasks and responsibilities, workflow standardization.

(2) Technical measures. Application of value engineering in the design and construction stage of the multi-program selection, strict review of the preliminary design, construction drawings, construction design and construction program, strict control of design changes, research and take corresponding effective measures to achieve the purpose of cost savings.

(3) economic measures. The implementation of economic contracting responsibility system, the plan target for the decomposition of the implementation of grass-roots level, dynamically on the project cost of the planned value and the actual value of the expenditure of comparative analysis, strict approval and payment of the costs, cost savings on the adoption of incentive measures.

(4) contract measures. Through the development of contract terms, clear and constraints in the design and construction phase of the control of project cost, do not break through the planned target value.

(5) information management. The use of computer-aided engineering cost management.